NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
AACEI Contingency Forum Contingency Management
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
Intraday conclusions of NWE IG 9 May. Short term way forward (phase 1) PXs and TSOs confirmed commitment to 2012 intraday project based on ELBAS solution.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Enagás, REnagás, REN and TIGF EN and TIGF IT implementation plans and agreements with PRISMA 25 th IG meeting 13 th December 2013.
on Congestion Management (IG)
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Developing Infrastructure Projects. Contents InfraCo Infrastructure Project Development InfraCo’s Role How InfraCo Operates InfraCo in Indonesia.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
ERI SWE region Madrid XBID Overview Supported by.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG December 2008 John Prime - Claude Perret.
PCR Status Date: 5 December Content Achievements Revised planning outlook Reasons for delays Remaining risks.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
Why being a Pioneer State?
Supported by: PCR Status report AESAG, September
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
Coordinated Market Coupling for GB
Implicit XB ID BE-NL Meeting 26/07/2010.
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
NWE Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
XBID Overview ERI SWE region Madrid Supported by.
Presentation transcript:

NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX

Type and estimated amount of costs Preliminary estimates of combined PX costs have been produced by APX ENDEX – Based on NWE go live early 2013 using full PCR solution – To be reviewed with TSOs on Friday 28 th October – 10mil estimated cost, including contingency Key assumptions – NWE PXs incur 60% of PCR common costs plus their own costs supporting PCR – APX ENDEX estimated own costs are representative of other PXs – Limited change to existing pre and post coupling arrangements (including shipping) across NWE region – Limited change to existing contractual/regulatory arrangements across NWE region – Phasing PCR is completing design, and is entering implementation phase Q4/Q1 NWE design expected to be completed Q1; implementation start Q2

Main Cost Elements PCR European Solution (60% share of common costs plus individual NWE PX contributions) Local implementation of PCR NWE End-to-End Technical Solution NWE Contractual Solution Drafting, negotiation, modification of enduring agreements TSO adapter software Shipping solution software Operational procedures design Integration and procedural testing Local hardware and communications infrastructure Trading system interfaces Algorithm development (c. 30%) - starting point; prototype development - procure industrial version - build/test industrial algorithm System development (c. 40%) - design, specify systems - procure system provider - build/test systems Joint PX contracts (c. 10%) PCR project management, contingency (c. 20%)

Timing of Cost Commitments

Cost Sharing - PCR PCR Common Costs – Jointly managed/procured costs (e.g., project manager, workstream leaders, procurement manager, algorithm developer, system contractors, specific tasks) – Shared equally between 5 lead PCR exchanges (in effect, 60% incurred by NWE PXs) PCR Individual PX Costs – PX costs incurred supporting PCR European solution deliverables – Not shared between PXs PCR Local PCR Implementation Costs – Costs incurred by each PC installing PCR systems and interfaces to local trading systems – Not shared between PXs New parties joining PCR – PCR open to new PXs: fair share of prior PCR investment (could be linked to market size, and option to be full party or not)