Efficiency today – opportunities tomorrow

Slides:



Advertisements
Similar presentations
- 1 - Premier’s Skills Summit Warwick Blyth CEO/Executive Director Introductory Remarks – Oil & Gas Services Sector February 2013.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Carbon Capture and Storage Climate Change and Sustainable Development: New Delhi, April 7-8, 2006 Pernille Holtedahl, PhD, Norad NORWAY.
Copyright©Statoil corporate presentation: Standing at a new frontier Standing at a new frontier Statoil presentation NTNU 19 January 2011.
The Business Value of Using Sensors Atul Arya, BP plc Presented at the 2008 IBM Almaden Institute.
Johan Castberg Production Challenges
ABB LCC ECS - 1 © 2004  Industrial IT Power Management System Scope & Value Proposition Lead Competence Center Electrical Control Systems.
Gas Handling Options for Associated Gas in Deepwater Developments in the Gulf of Mexico Project for the Minerals Management Service by Offshore Technology.
Solutions for Flaring & Venting CNG Marine Transportation
The Future of Solutions: Technologies for Increased Oil Recovery (IOR) Subsea IOR: Achievements & Future Vidar Sten-Halvorsen Technical Manager FMC Well.
2011 Henry Bacon Seminar Statoil’s perspective on the High North/Arctic Hans M. Gjennestad, Senior Strategy Advisor; Development and Production Norway.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
1. 2 Organizational Structure OSX Ownership OSX Leasing OSX Shipbuilding Unit OSX Services Free Float Integrated offshore E&P equipment and services provider.
Building Trust Among Investors Thank you Gunnar Eckbo and congratulation with introducing the price on Iceland. Rabbe Lund Chairman of a Swedish/ Norwegian.
Deepwater Development - An Industry Perspective
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Lines of Business Provides full service construction and construction-related services in the USA, Canada, and internationally Primary Markets - Power.
The way forward on the Norwegian Continental Shelf - into the Arctic oceans Brussels, March 6th 2012 Øivind Dahl-Stamnes, VP North Area Initiative, Statoil.
Decommissioning WGEI 2nd meeting, Oslo, September 2015.
OG21 TTA2 “What can change the game? Exploration and Reservoir haracterization” 13 February 2008 Norwegian Petroleum Directorate How can OG21 make a difference?
Classification: Statoil internal Status: Draft
Classification: Statoil Internal Status: Draft Technology Strategy Co-operation Force meeting
Prof. Anatoly Zolotukhin Gubkin Russian State University of Oil and Gas National Research University Moscow, Russia Neftegaz conference Moscow, June 27,
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
1 ATP Oil & Gas Corporation Denver Presentations September 16-17, 2002 ATP Oil & Gas Corporation.
Integrated Operations and the use of WITSML in Statoil WITSML meeting, October 19, 2006 Peter Eilsø Nielsen Senior Advisor Subsurface.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
Building a balanced portfolio of Exploration and Production Assets
Norwegian Carbon Capture and Storage Projects Helge Lund, President & CEO Capital Markets Update 8 June 2005 Tor Fjæran, Senior Vice President Corporate.
SunSatFriThursWedTuesMon January
Introduction Graeme Orr, Atyrau, April 2011.
Bengt Lie Hansen Senior Vice President, Hydro Oil & Energy The Giant Ormen Lange Field Development Hydro’s model for arctic offshore projects World Gas.
LL FORCE WORKSHOP Future Petroleum Research Directions April Liv Lunde Institute for Energy Technology P.O. Box 40, N-2027 Kjeller, Norway.
1 09 November 2012 Department of Public Works Presentation to the Standing Committee on Appropriations on the Programme Performance for the 2012/13 financial.
Norway Post - Quarterly report 1st quarter May 2010.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
1 Northern Oil / NaturGass Company presentation Oslo, June 1 st 2005.
Offshore opportunities Marine Money Istanbul 2012 Kristoffer Lund Sandaker Pareto Project Finance Pareto Project Finance, May 2012.
NERA Innovation Clusters … leveraging the opportunities
European Energy Southern Gas Corridor to Europe
Decommissioning Opportunity for City of Dundee
Norway Post - Half year report
Climate: Industry perspectives
“Hydrocarbons Exploration Activities Offshore Cyprus”
Eidesvik Offshore ASA – General Meeting
DISTRICT COOLING A promising and sustainable option for HFC phase-down
Business case – assessment of an energy efficiency measure
Markus Blesl, Tom Kober IER; University of Stuttgart
Bahrain: Overview & Future Opportunities Dr
March 2, 2014 One sector, one target, one message The pathway towards 100 EUR / MWh in 2023.
Combinations COURSE 3 LESSON 11-3
The turnaround in 2000 Aker Verdal as
Intelligent Completion Market by Application, Component, Type, Function and by Region - Global Forecast to 2023.
Nan Cheng, Statoil 26-June-2013
How to do EOR offshore, Brazil case study
ANGOLA THE OIL INDUSTRY.
Classification: Statoil internal Status: Draft
Santos – upstream developments
Is New England Over-Reliant On Natural Gas?
MER and Decommissioning
Preliminary Draft 2019 Operating and Capital Budgets
FY20 Budget Overview BA Meeting
Presentation of the Company
Reduced Draft Spar (RDS) Floating Offshore Wind Turbines A Market Opportunity Pedro López Offshore Engineering & Ship Design
A Series of Slides in 5 Parts Movement 4. Best-First
A Series of Slides in 5 Parts Movement 4. Best-First
Securing America’s Energy Future: A Reality Check
A Series of Slides in 5 Parts Movement 3. IDFS
Madagascar Oil Limited Overview
Presentation transcript:

Efficiency today – opportunities tomorrow Erik Strand Tellefsen | Statoil

Industry context Peer group development spend vs production 2005 2004 2003 2014 2013 2012 2011 2010 2009 2002 2006 2007 2008 2016 2015 95 115 125 120 100 90 110 105 Average production target Average reported production growth Oil and gas production 80 40 120 160 23.0 22.5 22.0 21.5 21.0 20.5 20.0 Production, mmboed Development costs incurred, USD bn 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 Total Shareholder Return

Production efficiency Statoil has ambitious targets Efficiency program Efficiency potential Improved drilling efficiency offshore and onshore Leaner facility and modification projects Reduced installation and plant operational cost Increase production efficiency Expected annual savings Statoil equity pre-tax; USD bn Capex 2014 2015 2016 Opex 1.3 Production efficiency Ref. CEO presentation Capital market update February 7

Johan Castberg Licensees: Statoil ASA: 50 % (operator) Eni Norge AS: 30 % Petoro AS: 20 % Location/Depth: 240 km from Melkøya LNG plant 200 km from Bjørnøya 365-405 m water depth Volumes discovered: 400-650 Mbbl of recoverable oil; Skrugard, April 2011 Havis, January 2012 Drivis, May 2014

An infrastructure train? Johan Castberg - options An infrastructure train? ,or a robust designed fit for purpose car? ,or a lean standard solution? 202+ Barentshavet er et vekstområde. Fra norsjøen og norskehavet, og for all annen virksomhet, vet vi at etablering av infrastruktur (prosesseringssentre, rørledninger, terminaler) er viktige. Bortsett fra Snøhvit er Barentshavet uten infrastruktur. Infrastruktur koster. Winterisation Prod. Ambition – schedule driven Ha dette bildet i hodet. Classification: Internal

Johan Castberg concepts FPU/Oil to shore Shipshaped FPSO FPSO with oil transport; directly to market via an Independent oil terminal

Cost reductions Target February 2015 Target June 2014 [MNOK 2014] Alll numbers in 2014 MNOK (real)

Lean, cost conscious design Turret: Too heavy Topside Too complex Living Quarter Too sophisticated Statoil’s overall strategy changes from 2.5 mbbl in 2020 to cost consciousness The FPSO designed to reach the production target is now not fit for purpose anymore. Topside is to complex, turret is too heavy, living quarter is too sophisticated and the hull is too large. Hull Too large Classification: Open 11.03.2013

Field layout June 2014 Skrugard Havis Drivis FPSO North South ED EA EB EC DA DB YA YB YC Havis Drivis CA CB CC ZA ZB CD FPSO North South 9

Field layout March 2015 Skrugard Havis Drivis FPSO North South ED EA EB EC DA DB YA YB Havis Drivis CB CC ZA CD FPSO North South 10

Efficiency improvements on track Realised USD 0.6 bn in efficiency improvements in 2014 Capex efficiency savings1) Make targets stand out a bit more. All number references in USD bn Norwegian continental shelf field cost = installation subsea and topside operation and maintenance, logistics, catering, administration, HSE and reservoir management. Capital market update

“Success is not final, failure is not fatal: it is the courage to continue that counts.”

Erik Strand Tellefsen | Statoil erte@statoil.com Thank you! Erik Strand Tellefsen | Statoil erte@statoil.com