Quality Control & Assurance

Slides:



Advertisements
Similar presentations
Total Productive Maintenance
Advertisements

Quality Improvement Level Up Program December 17, 2008.
ISO 9001 : 2000.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Assurance/Quality Control Policy
Development and Quality Plans
DATE: 28/11/2012 INSTRUCTOR: HANIF ULLAH Tutorial 7.
Key Performance Indicators - KPI’s
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
Risk Assessment – An Essential Standard
4. Establishing goals to guide & Measures to track.
Software Project Management Lecture # 11. Outline Quality Management (chapter 26 - Pressman)  What is quality?  Meaning of Quality in Various Context.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
5.4 Quality Assurance Chapter 33. What is a quality product? A good or service that meets customers’ expectations and is “fit for purpose”. A good or.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Software Quality assurance SQA – SWE 333
Controlling By: Mrs. Belen Apostol. What is controlling refers to the process of ascertaining whether organizational objectives have been achieved; if.
QSB Quality System Basics & Q7 tools in practice
Quality is the totality of features and characteristics of product or services that bear on its ability to satisfy the stated needs.  In simple words.
CECE FICCI Quality Costs & Profit Chapter no.2 CECE FICCI Many people think that quality costs money and adversely effects profits. But these costs are.
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
Quality Management: Mutually beneficial supplier relationships.
IMS Implementation Project
OH&S Management System
agenda What is the new Performance Management System
Corporate Presentation
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Façade Management Consulting
5.4 Quality Assurance Chapter 33.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Software Quality Control and Quality Assurance: Introduction
Seminar On Energy Audit Submitted To: Submitted By:
ISO/IEC
ISO 14001: 2004 Environmental Management Review Presentation
Korean College Student Internship Program
Quality Management in Business and Manufacturing Sectors
So where in ISO is Process?
Total Productive Maintenance and Maintenance Management
TOTAL Productive MAINTENANCE
Quality Quality is “a characteristic or attribute of something.”
OH&S Management System
Supplier Improvement Program
Quality Management Systems – Requirements
ISO 9001 Awareness Training.
Setting up an Internal Audit Program
Product Development Scenario Overview
Quality Department
ISO-9001 Quality Management System
Management Information Systems
UNDERSTANDING FOR STANDARD
Total Quality Management in Engineering Part II – Continues from the previous Slides Sir. Eng. R. L. Nkumbwa™ © 2010 Nkumbwa™.
Level 1 HSE M S Audit Insert Title here Closing Presentation
FINANCE. FINANCE FINANCE YEAR 1 PRIORITY 1 PRIORITY 1 San Benito CISD will work to provide a full day pre-kindergarten program with highly qualified.
Honeywell Aerospace Kruti Tanna October 30, 2018
Management Information Systems
Chapter 6 Activity Planning.
Quality Management in Business and Manufacturing Sectors
Safety Self-Inspections
AS 9100 Awareness Training.
ISO 9001:2008 Quality Management Systems
How to conduct Effective Stage-1 Audit
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
ECM SERVICES Group Stormwater Monitoring Program
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Implementation of ERP Solution QASoft
The PEAR Friday 2 November 2012.
8. Features of Manufacturing Industries – Part A
Presentation transcript:

Quality Control & Assurance Plan – 2007 Quality, our way of life…

Quality Control & Assurance Main objective: To eliminate customer complaint through “Zero defect” product - through continual improvement. Monitor the system to Prevent error before it happens.

Quality Control & Assurance Specific goal:- 1. To eliminate and minimize customer complaint through “Zero defect” product through continual improvement (5 sigma / 230 PPM) 2. To conduct 2 internal audits during the year 2007. 3. To arrange Quality awareness program for employees once in three months. 4. To measure the customer satisfaction through customer feedback forms and aim the rating as Good (Index: 80Points & above). 5. Monitor the corrective and preventive action plan on NCR’s and close the CAR with in 30days. 6. To clear the customer quality claims with in 7 working days from the date of complaint. 7. To calibrate the testing and measuring instruments as scheduled in the year 2007. 8. To conduct Product audit as per the year 2007 schedule.

Quality Control & Assurance Arrange data base for customer complaint analysis – discussion with PDM link with HCL India company Establish temperature rise set-up (In-house) for switchboard testing – 5000A – Offered received – frozen Establish dust chamber test set-up – Will be added with Dubai service box line. To arrange Quality awareness program 3 months once To introduce gauges for faster inspection at process stage Improve the competence of the people by providing more training

Quality Control & Assurance Monitor the Eletra and Alf product Quality trend Product audit : 2 Products per month Process audit : 1 Process each per month Temperature rise test : 2 Product per month Product rework monitoring & Initiate action : Before 5th every month Product related NCR Summary & Initiate action : Before 5th every month Customer Complaint Analysis & Reporting to concerned & Monitor corrective action with in 24 hours

Quality Control & Assurance Re-calibration of Instruments and Gauges as per year schedule (Met 250 & Electrical 117) Arrange non-std inductive 100A load bank for wiring accessories product testing – commissioned Explore the Manufacturer Lab approval Manual submitted to SASO The preliminary visit over Improvement under process

b) Weekly meeting has to conducted every Wednesday with fixed agenda. Quality Control & Assurance SL NO Specific Goal PROPOSED ACTION PLAN TARGET 1 To improve Internal communication system within QA/QC department more effective a) Every day morning at shop floor - a standing meeting has to be conducted in Prodcution,Planning and Assembly and review the shift Production/Rejection complaints and Corrective Action details Jan-07 b) Weekly meeting has to conducted every Wednesday with fixed agenda. c) Internal Customer complaints, Quality problems communicated to down the line. It will help to create the Quality awareness and take necessary Corrective Action immediately. 2 Effective Brainstorming sessions need to be carried out to involve relevant employees - during various product improvement stages Design and Assembly wise cross functional team to be formed and each team has to take various projects and focus on action plan and achieve the same.  

Quality Control & Assurance SL NO Specific Goal PROPOSED ACTION PLAN TARGET 3 Department wise monthly Quality measurement to be reviewed periodically Every month 4-5th day review Jan-07 4 Attribute Gauging (Receiver Gauges) introduced only for few components Wherever possible POKE YOKE system will be introduced and the same can be displayed in the shop floor. 1st Qtr-07

Quality Control & Assurance SL NO Specific Goal PROPOSED ACTION PLAN TARGET 5 Manpower - Quality Inspectors / technician / engineer requirement As per the Recruitment Plan 2007 6 Final / Inward Inspection report generated manually. a) Component wise Quality Plan can be programmed in computer through Navision and Inspection report can be generated in the computer. 2nd qtr 7 To conduct Internal Quality Audit and Management Review Meeting as per the plan. 2 IQA and MRM to be conducted as per the plan Conti.. 8 Development of tool / mould approval process A CFT team shall be formed (Tool room, design, Production and Quality) to reqularize the approval process 9 Testing and Inspection instruments As per Budget plan