Electric and Gas Rate Update – June 14, 2013 Jim Ziolkowski, Rates Manager.

Slides:



Advertisements
Similar presentations
10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
Advertisements

NET METERING & FEED IN TARIFF REVIEW IURC Technical Conference
Completing the Accounting Cycle Accounting Principles, Ninth Edition
Foothill MWD Preliminary Budget Presentation May 20, 2013.
Market Support Generation Workshop October 2, 2000.
1
Flexible Budgets, Variances, and Management Control: II
STATEMENT OF CASH FLOWS
Cost Behavior, Operating Leverage, and Profitability Analysis
Author: Julia Richards and R. Scott Hawley
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
CALENDAR.
Board of Early Education and Care Retreat June 30,
Accounting and Financial Reporting
Applicable for Persons Registered under Article 10
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
150% Direct Subsidized Loan Limit Webinar #1 Academic Year and Loan Period Reporting June 4, 2013 and June 6, 2013.
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
Break Time Remaining 10:00.
Analyzing Transactions
1 Payment Systems Funds Availability Problems. 2 Problems Funds Availability Scenarios All deposits made in Oklahoma City on Monday March 1 Bank open.
Income Measurement and Profitablity Analysis
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
EU market situation for eggs and poultry Management Committee 20 October 2011.
Inventories: Additional Issues
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Cost-Volume-Profit Relationships
DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
Reporting and Interpreting Cost of Goods Sold and Inventory
Inven - Cost - 1Inventory Basic Valuation Methods.
1 General Info’s about The OLYMPOS ® RETAIL MARKET APPLICATION.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 22 November 2012.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1 TV Viewing Trends Rivière-du-Loup EM - Diary Updated Spring 2014.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
GEtServices Services Training For Suppliers Requests/Proposals.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Fifteen “How Well Am I Doing?” Statement of Cash Flows.
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Select a time to count down from the clock above
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
Electric Security Plan Update – June 27, 2014 Jim Ziolkowski, Director, Rates and Regulatory Planning.
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
Progressive Energy Solutions, LLC July 28, 2010 NYMEX N. Illinois Hub Electric Prices 12-Month Forward Prices Through July 15, 2010 * NEU Electric and.
Regulatory Update Dennis Derricks May 5, 2010 Regulatory Update Dennis Derricks May 5, 2010.
Ohio Duke Energy Ohio 2012 Electric Security Plan Duke Energy Ohio June 29, 2012 Jim Ziolkowski, Rates Manager.
Rates Update – September 18, 2015 Jim Ziolkowski, Director, Rates and Regulatory Planning.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Narragansett Electric Rate Classes
Presentation transcript:

Electric and Gas Rate Update – June 14, 2013 Jim Ziolkowski, Rates Manager

2 Agenda Duke Energy Ohio Standard Service Offer Electric Security Plan Overview Auction Generation Riders Other Items Base Rate Cases Electric Distribution Base Rate Case Filing Gas Base Rate Case Filing Capacity Case Filing Price To Compare

3 Electric Security Plan Overview Duke Energy Ohio filed for approval of its Standard Service Offer (SSO) in the form of an Electric Security Plan (ESP) in June Settlement was reached in October 2011 with intervening parties. Hearing held during November ESP was approved by the PUCO in November ESP effective January 1, 2012, through May 31, 2015.

4 Electric Security Plan Overview Highlights: SSO load is procured through an auction. The cost of this auction-procured load is recovered through Riders RC and RE. True-ups addressed through Rider SCR. Duke Energy Ohio will move its legacy generation plants to a non-regulated affiliate by 12/31/14. Duke Energy Ohio will collect $110 million per year for three years through a new non- bypassable charge (Rider ESSC). All previous generation-related charges terminated after December 31, 2011 (base generation, FPP, AAC, SRT, CD, shopping credit).

AUCTION SCHEDULE 5

Details of Auctions First auction held in December Three products: January 2012 – May 2013 (33 tranches - $49.72) January 2012 – May 2014 (33 tranches – $51.10) January 2012 – May 2015 (34 tranches - $57.08) Resulting blended auction price was $52.68 per MWh for the January 2012 through May 2013 delivery period. Descending-price clock auction. Charles River Associates was the auction manager. Boston Pacific monitored for the PUCO. Auctions for full requirements service. 6

Details of Auctions Second auction held in May 2012 (17 tranches - $52.14 – June May 2015). Third auction held in November 2012 (16 tranches - $50.56 – June 2013 – May 2015). Blended auction price is $53.22 per MWh for the June 2013 through May 2014 delivery period. 7

Auction Schedule 8

2012 ELECTRIC SECURITY PLAN RATE STRUCTURE 9

10 Generation Rates The Price To Compare (bypassable) components of the ESP are: Rider RC (Retail Capacity) Rider RE (Retail Energy) Rider SCR (Supplier Cost Reconciliation) Rider AERR (Alternative Energy Recovery) Rider RECON (Reconciliation Rider) – Withdrawn May 2013 Rider RTO (Regional Transmission Organization)** The non-bypassable components of the ESP are: Rider ESSC (Electric Security Stabilization Charge) Rider LFA (Load Factor Adjustment) Rider UE-GEN* (Uncollectible Expense – Generation) Rider BTR (Base Transmission Rider)** * Bypassable if CRES opts out of PAR **Approved in separate proceeding

Legend Fully Bypassable Non-Bypassable Rider RTO Various RTO costs Rider RTO Various RTO costs BTR Base transmission incl. NITS BTR Base transmission incl. NITS Distribution rates and riders SCR Supplier Cost Reconciliation SCR Supplier Cost Reconciliation AERR (RECs) Alternative Energy Recovery AERR (RECs) Alternative Energy Recovery RECON - Withdrawn Reconciles ESP riders RECON - Withdrawn Reconciles ESP riders UE-GEN Generation Uncollectibles UE-GEN Generation Uncollectibles RC and RE Retail Capacity and Energy Derived from auction RC and RE Retail Capacity and Energy Derived from auction 11 Electric Security Plan Rate Structure ESSC Electric Security Stabilization ESSC Electric Security Stabilization LFA Load Factor Adjustment LFA Load Factor Adjustment

12 Rider RC (Retail Capacity) Based on PJM market capacity price for the delivery period. Converted into retail rates. Rider RC will be adjusted before each of the three delivery periods in the ESP. Rider RC is fully avoidable by shoppers.

13 Rider RE (Retail Energy) At the wholesale level, calculated by subtracting the capacity price for the delivery period from the blended auction price. Converted into retail rates by adjusting for losses, taxes, and seasonality / blocks (for some rates). Rider RE will be adjusted before each of the three delivery periods in the ESP. Rider RE is fully avoidable by shoppers.

14 Rider ESSC (Electric Security Stabilization Charge) Collects $110 million per year for three years. Expires after 12/31/14. Will be trued up each year. Rider ESSC is non-bypassable.

15 Rider SCR (Supplier Cost Reconciliation) Reconciles the Rider RE and Rider RC revenues received from retail customers with the payments owed to auction providers. Recovers costs associated with auctions ( e.g., consultants, setting up CBP website, etc.) Adjusted quarterly. Normally bypassable for shopping customers, but Rider SCR contains a non-bypassable provision.

16 Rider SCR (Supplier Cost Reconciliation) – Circuit Breaker Subject to Commission approval, Rider SCR becomes applicable to all retail jurisdictional customers in the Companys electric service territory including those customers taking generation service from a CRES provider under the following circumstance: The revenue balance within the SCR account becomes equal to or greater than ten percent of the Companys total actual SSO revenues collected for the most recent twelve month period under Riders RE, RC, RECON, RTO, and AER-R. The total actual SSO revenue will be determined from data covering the most recent quarter for which it is available. Duke Energy Ohio shall apply to the Commission for confirmation that the Company should modify the Rider such that it becomes non-bypassable regardless as to whether or not the balance in the Rider results from over- or under-recovery. For customers of CRES providers, Rider SCR will become bypassable again when, at the time of the quarterly filing, the Rider balance of over- or under-recovery falls below the ten percent threshold.

17 Rider AERR (Alternative Energy Recovery Rider) Recovers the cost of Renewable Energy Certificates (RECs) associated with SSO ( i.e., non- switched) load. Adjusted quarterly. Rider AERR is fully avoidable by shoppers.

18 Rider UE-GEN (Uncollectible Expense - Generation) Recovers uncollectible accounts expense related to generation service, including Percentage of Income Payment (PIPP) customer installments not collected through the Universal Service Fund Rider. Non-bypassable, except it is bypassable for accounts that are not designated for Duke Energy Ohios Purchase of Accounts Receivables program. Adjusted annually.

19 Rider LFA (Load Factor Adjustment Rider) Revenue neutral to Duke Energy Ohio. Adjusted quarterly. Rider LFA is non-bypassable. Rider LFA applies to customers taking service under Rates DS, DP, and TS. Demand charge and kWh credit.

20 Other Items Minimum stay rules eliminated for all customer classes. Duke Energy Ohio purchases accounts receivables from CRES providers at zero discount. Rider LM has been re-opened to both shoppers and non-shoppers. Funding provided to various community agencies serving low income customers. Distribution Decoupling Rider that does not apply to Rates DS, DP, and TS.

Alternative Energy, Energy Efficiency, Peak Demand Reduction ESP does not impact commitment to meeting alternative energy, energy efficiency, or peak demand reduction requirements. Duke Energy Ohio will continue energy efficiency and peak demand reduction programs (Rider EE- PDR). Duke Energy Ohio continues to purchase RECs and also enter contracts to comply with alternative energy requirements. 21

22 ESP Termination The ESP will be effective through May 31, The Company is required to make its next SSO filing by June 1, 2014.

ELECTRIC DISTRIBUTION & GAS BASE RATE CASES 23

24 Electric Distribution Case – Filed July 2012 Test Period: January 2012 – December 2012 Proposed Rate Increase: $86 million Settlement Rate Increase: $49 million Proposed ROE: 10.6% Settlement ROE: 9.84% Tariff-related changes: Rider LM (Load Management Rider) – monthly charge is $7.50 for Rate DS and DP Rate RTP (Real Time Pricing) – hourly prices based on PJM day-ahead prices Hearing began on March 25, Settlement approved on May 1, New electric distribution base rates effective May 6, 2013 on a service-rendered basis.

Typical Bill Impacts (Total Bill Including Generation) Rate DS 200 hours-use: 2.9% 300 hours-use: 2.5% 400 hours-use: 2.2% Rate DM Approximately 2.5% Rate DP 200 hours-use: 2.4% 300 hours-use: 2.1% 500 hours-use: 1.6% Rate TS: Zero increase for all usage levels 25

26 Gas Case – Filed July 2012 Test Period: January 2012 – December 2012 Proposed Rate Increase: $44.6 million Settlement Rate Increase: $0 (April 2013 AMRP rates rolled into base rates with zero net bill impacts) Proposed ROE: 10.6% Settlement ROE: 9.84% Some key components: Recovery and Continued Deferral of Manufactured Gas Plant Costs Accelerated Main Replacement Program (Rider AMRP) continues Grid Modernization (Rider AU) continues New Riders (Natural Gas Vehicles and Gas Generation IT) Hearing held the week of April 29, 2013 to litigate the Manufactured Gas Plant environmental cleanup costs. All other issues in the case were settled. Revised base rates not yet approved by PUCO.

27 Typical Bill Impacts (Total Bill Including Gas Cost) Rate GS-Small and FT-Small – 0% Rate GS-Large and FT-Large – 0% Rate IT: 0% Residential – 0% Note: These impacts exclude any increases that might result from the separate MGP litigation (hearing conducted during the week of April 29).

CAPACITY CASE 28

29 Capacity Case – Filed August 2012 Requests cost-based capacity pricing consistent with traditional ratemaking principles for Duke Energy Ohios provision of capacity of its load zone. Requests deferral for three years of $258.8 million per year, and subsequent recovery. This amount represents the difference between the cost-based capacity price and the PJM auction-based capacity price. Recovery through the proposed Rider DR-CO (Deferred Recovery – Capacity Obligation Rider). Hearing held on April 15 through April 25, Rebuttal hearing held on May 20, 2013.

Price To Compare Jan 2012 – May

Legend Fully Bypassable Non-Bypassable Rider RTO Various RTO costs Rider RTO Various RTO costs BTR Base transmission incl. NITS BTR Base transmission incl. NITS Distribution rates and riders SCR Supplier Cost Reconciliation SCR Supplier Cost Reconciliation AERR (RECs) Alternative Energy Recovery AERR (RECs) Alternative Energy Recovery RECON - Withdrawn Reconciles ESP riders RECON - Withdrawn Reconciles ESP riders UE-GEN Generation Uncollectibles UE-GEN Generation Uncollectibles RC and RE Retail Capacity and Energy Derived from auction RC and RE Retail Capacity and Energy Derived from auction 31 Electric Security Plan Rate Structure ESSC Electric Security Stabilization ESSC Electric Security Stabilization LFA Load Factor Adjustment LFA Load Factor Adjustment

32 How Do I Calculate My Price to Compare? Compare: DE OHs Rider RC Charge + Rider RE Charge + Rider SCR Charge + Rider AERR Charge + Rider RTO Charge vs. The CRES Providers price for electricity Note: Price To Compare varies based on load factor

33 Price To Compare Calculation

34 Recommendations Use twelve months of demand and energy to develop an average annual price to compare for the best price comparison Compare competing offers using the same usage data

35 Annual Price To Compare (Example)

36 Duke Energy Ohio Tariffs Duke Energy Ohios tariffs can be found online at:

37