DSR Workgroup 10 September 2014 www.energy-uk.org.uk t @energyukcomms.

Slides:



Advertisements
Similar presentations
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Advertisements

The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Renewable & CHP Generators : A suppliers perspective Presentation by Steve Armitage Tel
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
September 25, 2001 Maryland Public Service Commission Retail Gas Market Conference Timothy S. Sherwood Department Head, Energy Acquisition.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Telephone : +234 (0) | Website : Registered company : Telephone : +234.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Contracting Officer Podcast Slides
How to avoid blackouts in Europe?
Principles of Business & Finance
Principles of Business & Finance
Fuel Cost Components in the Fuel Adder
Details of demand management options
Fuel Cost Components in the Fuel Adder
Gas System Operator Incentive Review
Transmission Workstream 7th Dec 2006 Chris Logue
Supply Point Register 7th December 2011
Fuel Cost Components in the Fuel Adder
Avalon Energy Consultants
Demand forecast and network balancing
Inter-day Energy Transfer – Opportunity and Risk
Review Group 291- Ofgem Update
Transmission Workgroup 7th July 2011
Demand Control Field Trials
Demand Side Integration An overview of initiatives promoted by RTE Gérald Vignal RTE/Market Design Department.
Flexible Forward Contracts for Renewable Energy Generators
Level of Contract / Supplier Management
Chapter 14 Sourcing Decisions in a Supply Chain
Executive Director - Dawson Books
CPDe Event The Changing Value in Flexibility 19th April 2018.
GTAC Workshop Block 5 19 September 2018.
Day-ahead market coupling
Review of System Alerts
Gas Transmission Access Code: Submission on GIC Preliminary Assessment
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
DSR Volumetrics Workgroup 3 10 September 2014.
Summary of Vector’s Views on Preliminary Assessment by GIC
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Review Group 0175: DM Supply Point Emergency Arrangements
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Meeting Friday 13th September 2013 Hayley Burden
Ahmad Elberry, Abdelghani Aljayyousi
Chapter 14 Sourcing Decisions in a Supply Chain
Options for the Development of a Demand Side Response Mechanism
Competitive financing from Norway Georg Kervel
Maine's Standard Offer Service
Energy Supply Business Model enabled by the Clean Energy Package
Pixie Energy ECO Switch
Principles of Business & Finance
CEng progression through the IOM3
Presentation transcript:

DSR Workgroup 10 September 2014 www.energy-uk.org.uk t @energyukcomms

DSR Shipper / supplier contract issues DSR Workgroup 10th September 2014 DSR Shipper / supplier contract issues Shippers / suppliers are expected to be the contractual interface between DM customers and the DSR bidding platform to facilitate customers offering load for DSR purposes after a gas deficit warning has been issued. Where there is a demand from customers for this service, Shipper / Suppliers are happy to facilitate this, but we need to recognise they do have limited operational resources Under stressed supply / demand conditions resources will be focussed on managing the portfolio balance position and maintaining security of supply Therefore arrangements with customers need to be: Straightforward in application and execution (to avoid confusion in an emergency situation) Not increase shipper balancing risk Propose: Standard set of minimum terms that shippers could offer Variations (or enhancements) to these terms could be managed bilaterally, this may encourage more complex / innovative DSR arrangements.

DSR Standard Contractual Terms DSR Workgroup 10th September 2014 DSR Standard Contractual Terms Fixed volume, price, lead time at time of supply contract negotiation This strikes a balance between shippers providing a route to market for customer DSR whilst maintaining operational focus at times of system stress Performance assessed against day ahead nominations Expectation that at least fixed volume is delivered Non-delivery No DSR payment to customer if the fixed DSR volume is not delivered (no pro-rating of payments) Encourages customers to offer volumes they are confident in being able to deliver Avoids more complex arrangements Protects shipper balance positions Provides National Grid with some confidence in likely delivered volumes