Changes to Price Adjustment Provisions Division of Construction Management.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Copyright © 2002 Pearson Education, Inc. Slide 1.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 The Academic Profession and the Managerial University: An International Comparative Study from Japan Akira Arimoto Research Institute for Higher Education.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
New Prebid Policy and Procedure Division of Construction Management.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2011 Conaway Conference Structures Update.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Solve Multi-step Equations
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
© S Haughton more than 3?
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
© 2010 Cisco and/or its affiliates. All rights reserved.Presentation_IDCisco Confidential CISCO LEARNING CREDITS MANAGEMENT TOOL CLP ADMINISTRATOR – USER.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Presentation transcript:

Changes to Price Adjustment Provisions Division of Construction Management

2 Asphalt Binder Index PN 530 and Conaway Conference

3 Bid Indices - What we said in Bituminous Price Adjustment – Continue Use –Current (2009 & Prior) C&MS Section (Standard Specification Language) Used in all contracts to adjust the price of liquid asphalt for all asphalt concrete products based on the PG binder type. –Proposed Changes (2010) Use on multi-season projects only. Change to a PN from the Standard Specification. Use a single PG grade as the basis for adjustment, PG Use a single independent reporting source for the index values such as Asphalt Weekly Monitor. Change the trigger to 10% Conaway Conference

4 Bituminous Price Adjustment - what we did Index Changes: – Removed as standard specification – Using on contract-by-contract basis (PN 530 and PN 535) – Using one binder type for all price adjustments – Using AWM to establish index – Current months index available at beginning of next month 2010 Conaway Conference

5 Remove from Specifications Removed specification and apply on contract-by-contract basis Basis - FHWA Guidance TA : –Price adjustment clauses should not be standard specifications –Can be applied on a project-by-project basis based on assessment of need 2010 Conaway Conference

6 Use One Binder Type Using one binder grade for index, PG64-22 Basis - Using one index based on one PG binder is the most common method –33 states use only one price adjustment index – Only Alabama determines indexes for all PG binder grades used 2010 Conaway Conference

7 Use Published Binder Pricing Using AWM to establish binder price index Basis - FHWA Guidance TA : –Index must not be susceptible to manipulation 2010 Conaway Conference

8 Increase Trigger Increased triggers –15% on single season projects –10% on multi season projects Basis- FHWA Guidance TA : –Price adjustment to be triggered bysignificant change 2010 Conaway Conference

9 ODOT Continues to Evaluate HMA Prices 2010 Conaway Conference

10 Steel Price Adjustment PN Conaway Conference

11 Bid Indices - What we said in Steel Price Adjustment – Continue use –Revise the Index Source to more closely reflect steel pricing for products used in transportation projects. –Change Designer Note to reflect use on multi- season projects only 2010 Conaway Conference

Previous SPA Commodity Table 12

13 Steel Price Adjustment – What we did Reduced the list of eligible steel commodities and revised the index sources: 2010 Conaway Conference

14 Steel Price Adjustment – What we did For Category 1, Table B-1: The adjustment indices shall determine the BI and MI values for wide flange beams plus a scrap surcharge as listed. Link: Link: Link: For Category 2, Table B-1: The Department will post monthly data obtained from the American Metal Market (AMM). The adjustment index (MI, BI) determines the adjustment ratio and the BI determines the raw steel material price for Steel Plate, Cut-to-length as reported for National Mills at the time of bid Conaway Conference

15 Steel Price Adjustment – What we did New Designer Note: For use on all projects expected to be constructed over a time period of more than one year AND that require steel products listed in Table B-1 of the proposal note. Old Designer Note: For use on all projects that require steel of the types listed in the note Conaway Conference

16 Fuel Price Adjustment PN Conaway Conference

17 Bid Indices - What we said in Fuel Price Adjustment – Continue Use –Change Designer Note to reflect use on multi- season projects only 2010 Conaway Conference

18 Added the following items to the FPA: –Select Granular Backfill, Item 840; 0.75 gal./c.y. –Rigid Bases and Pavements, Item 888; 1 gal./c.y Conaway Conference Fuel Price Adjustment – What we did

2010 Conaway Conference Fuel Price Adjustment – What we did 19 Current Designer Note: This note is to be used on all projects that contain any of the categories of work listed in Table A-1 of this proposal note. Questions regarding this note should be directed to the Office of Construction Administration at No change to date.

Future Changes 2010 Conaway Conference 20

Proposed Index Posting Changes Index Type Current Index Cut-off Date Current Index Effective Month Proposed Index Cut-off Date Proposed Index Effective Month Posting Month Asphalt PN 530/535 Last Wednesday of the month (i.e. Jan. 27, 2010) Month of Index Date (i.e. Jan. 2010) No change Month following Index (i.e. Feb. 2010) Steel (AMM) PN 525 Last Wednesday of the month (i.e. Jan. 27, 2010) Month following Index Date (i.e. Feb. 2010) No changeChange to Month of Index Date (i.e. Jan. 2010) Month following Index (i.e. Feb. 2010) Steel (Mill Data) PN 525 Last Wednesday of the month (i.e. Jan. 27, 2010) Month of Index Date (i.e. Jan. 2010) No change Month following Index (i.e. Feb. 2010) Fuel PN 520 Last day of the Month (i.e. Jan. 2010) Month of Index Date (i.e. Jan. 2010) No change Month following Index (i.e. Feb. 2010) 2010 Conaway Conference 21

Proposed SPA (PN 525) Changes Editorial Changes. –Correct the equations as follows SPA = [(MI/BI) – 0.90] x BI x Q or SPA = [(MI/BI) – 1.10] x BI x Q For Category 1, Table B-1: The Department will post monthly adjustment indices (BI and MI) for wide flange steel beams plus a scrap surcharge using data obtained from the steel producers listed Conaway Conference 22

Proposed SPA (PN 525) Changes 2) Identification of the steel product subject to adjustment. a. Documentation package number: PN525 – (Insert the steel product title from Table B-1) – (Insert sequential package number beginning with 1). Example: PN525 – Steel Piling– 1, PN 525 – Structural Steel – 2, etc… 2010 Conaway Conference 23

Proposed SPA (PN 525) Changes For Category 2, Table B-1: The Department will post monthly adjustment indices (BI and MI) for steel using data obtained on the last Wednesday of the month from the American Metal Market (AMM), based on the price for Steel Plate, Cut-to-length as reported for National Mills Conaway Conference 24

Proposed SPA (PN 525) Changes MI = Mill Shipping Index. - Use the adjustment indices from the month the steel was shipped from the producing mill and properly documented. The adjustment indices will be posted on ODOTs website. BI = Bidding Index. - Use the adjustment indices from the month proceeding the month in which the project is bid. The adjustment indices will be posted on ODOTs website Conaway Conference 25

2010 Conaway Conference 26 1.No new indices planned at this time. 2.No retroactive application of proposed Index Changes. 3.All proposed changes are draft. 4.Use price adjustments as per the contract documents – not the information presented here. Important Points to Note

2010 Conaway Conference 27 Questions