SHMS Downstream Beamline

Slides:



Advertisements
Similar presentations
PHENIX & The Beam Pipe. 1)Overview of the drawings 2)I will break down the beam pipe going from MuID-S to MuID-N piece by piece. 3)Important Information.
Advertisements

Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
AFC Module Meeting Friday - May 21, 2004 Report on the Window burst test Edgar Black IIT.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
Alice overview New detector and chamber ALICE TC.
Types of Metal.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Linac Status June 16, 2015 Time Meeting D. Raparia.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
SBS Magnet and Infrastructure Status Robin Wines July 2015.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Hall A Tritium Target Status Dave Meekins 7 December 2015.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
Position #1 Still interferes with acceptance of the SHMS and min angle. Not much room to attach to pipe flanges and may hit clamps on HMS Snout Position.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
ATF2 Status N.Terunuma, KEK
Hall C Readiness Review – Small Angle SHMS Operation
Stephan Aulenbacher MAGIX Collaboration Meeting
Reproducibility of SHMS magnets tested using COSY and mc-single-arm
General remarks about the HESR and PANDA vacuum system
Vacuum chamber for the CMS forward region
EBTF Design Review Technical Meeting Group
Update on GEp GEM Background Rates
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
HRS at small angles for e+/ e- pair for APEX
SHMS Q2 with Beam Line Shield Pipe
Additional Upstream Coil Shielding
Hall A Tritium Target Status
SHMS Beam Line – Large SHMS/HMS Angles
Additional Upstream Coil Shielding
SHMS Master Layout-Rays
Hall C Users Meeting 31 January 2009
Monday Top half What is the approximate area of the circular screen on the speaker shown below? 62.8 cm cm cm2 1,256.6 cm2 Look at the drawing.
Hall C Dump Status Beam Resuscitation Review
Types of Metal.
CRYOMODULE FINAL ASSEMBLY
NPS Status Feb 01, 2019 Paulo M & Steven L.
Beam Halo Considerations for Back Angle Running
BGC Collaboration Meeting –
Cu67 Isotope Radiator & Target
Polarized 3He target installation
SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎.
Presentation transcript:

SHMS Downstream Beamline Min SHMS / Min Achievable HMS Angle Dan Young Ext 5255 4/14/2019

4/14/2019

SHMS Downstream Beam Line (SHMS Min Angle) New Beam Pipes to Accommodate SHMS at Min Angle 3 Beam Pipe Sections Section “A” Section “B” Transition Beam Pipe 67175-00030 Diameter to Fit Cutout In HB and Q1 Magnet Transitions from 2.00 OD to 2.875 OD Total 137.53 Long Beam Line to Dump is the same for all Spectrometer Angles 5 Inch Beam Pipe 67175-00031 Diameter to Fit Cutout In Q2 Magnet 5.00 OD x 4.50 ID x 177.875 Long 10 Inch Beam Pipe 67175-00032 10.75 OD x 79.25 Lg Move Bellows From Upstream to Downstream of Q2 Bellows and Larger Pipe Diameters Will Not Fit Within Q2 Yoke Cutout At Min SHMS Angle SHMS Downstream Beam Line (SHMS Min Angle) 67175-00034 Target Chamber to Gate Valve (Gate Valve to Dump Remains The Same) 4/14/2019

SHMS Downstream Beamline Section-A Min SHMS/Min Achievable HMS Angle Beam Pipe and Supports Min SHMS/Min Achievable HMS Angle 4/14/2019

Angle To Magnet Center Lines 5.5° Deg SHMS Min Angle Minimum Achievable HMS Angle SHMS Shown at Min Angle of 5.5° 4/14/2019

SHMS Downstream Beamline Section-A Target Center 0.00 Scattering Chamber Window Flange 87.124 SHMS Transition Beam Pipe 67175-00030 29.126 1 ¼ ” Aluminum CF Half Nipple 2.875 OD x .25 2.00 OD x .188 2.0 OD x .188 wall Aluminum Tube Nests inside slot of SHMS Magnet at Min Angle (5.5°) then transitions to 2.875 OD x ¼ wall Aluminum Pipe which nests inside slot in Q1 Magnet 2.875 OD x .25 .80° Scatter Angle SHMS Downstream Beamline Section-A View illustrating Beam Pipe diameters and .8° Scatter Angle Min SHMS/HMS Min Achievable Angle (Config -3) .80° Scatter Angle 4/14/2019

Views illustrating 2.875 inch OD Beam Pipe nested in slot in Views illustrating 2.0 inch OD Beam Pipe nested in slot in Bender Magnet at SHMS Min Angle of 5.5° Views illustrating 2.875 inch OD Beam Pipe nested in slot in Q1 Magnet at SHMS Min Angle of 5.5° 4/14/2019

Existing Purchase Order 4/14/2019

Existing PR for Downstream Beam Pipes Appears only for Large and Medium Beam Pipe Configurations Small Beam Pipe appear to have not been ordered or fabricated 4/14/2019

Drawings Small Beam Pipe Configuration 4/14/2019

4/14/2019

4/14/2019

4/14/2019

4/14/2019

4/14/2019

Materials 4/14/2019

Ryerson Metals 4/14/2019 Online Metals

New Seal 4/14/2019