Introduction to Integrated Control Systems

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
EPICS Meeting 2005ORNL Rdb systems at SNS Jeff Patton and cast April 27-29, 2005 EPICS Meeting 2005.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
ICS Software Development Environment Blaž Zupanc and Leandro Fernandez 31 August 2015.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
ICS re-planning, outsourcing/inhouse development strategy and staffing TAC 12 presentation Henrik Carling ESS/ICS Date:
Target Controls Introduction Linda R. Coney Group Leader – Target Safety and Controls Jülich Meeting 17 August 2015.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Responses to recommendations of TAC 11 Integrated Control Systems Henrik Carling ESS/ICS Date:
Data Management and Software Centre Mark Hagen Head of DMSC IKON7, September 15th 2014.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
ICS WP3 – Software Core Components Suzanne Gysin Work Package Lead November 25, 2014.
ICS Software Development Environment Blaž Zupanc and Leandro Fernandez 10 March 2016.
ESS Machine protection review Welcome Henrik Carling ESS/ICS Date:
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
ESS Integrated Control System Software Core Components S.Gysin
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
Software Core Components (ICS WP3) Suzanne Gysin Work Package Lead February 22, 2014.
TAC 11 Integrated Control System Progress and Plans Garry Trahern Head of Division/Project Manager TAC 11 April 1, 2015,
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Controls standards and support Daniel Piso Fernández Hardware and Integration Group Leader 10 February 2016.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Controls Software Developer - Summer workers The Machine Directorate at the European Spallation Source (ESS) in Lund, Sweden, invites applications for.
Software Scope Susanne Regnell Group Leader Control System Software
TAC 13 Integrated control system Henrik Carling Head of ICS division
Status of Integrated Control Systems
Presented by Li Gang Accelerator Control Group
SNS Status Report Karen S. White 10/15/08.
PLC-based control systems at SOLEIL - ICALEPCS 2017
The ILC Control Work Packages
COntrol, Data Access and Communication System for ITER
Olivier Napoly, coordinator CEA/Irfu
Controls for TS2 Cryomodule Testing System Review
Plan for controls with the digital platform
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
ICS update 7th Experiment Control Workshop
PLCs integration into the ICS
TS2 PSS Architecture, Concepts of Operations and Interfaces
Automation of Control System Configuration TAC 18
ESS Main Control Room & ICS Infrastructure
PSS verification and validation
Progress and plans for ICS TAC 12 presentation
Control Systems for the APTM and GRID
The ESS integrated control system Overview and status update
NSS integrated installation plan workshop Introduction
Welcome to the European Spallation Source
Hector Novella Deputy project manager
Critical Design Review Personnel Safety System: PSS0
Agenda Integration services framework
Vacuum Control System for Monolith Vacuum
ISrc & LEBT – ICS Installation Readiness Review
TAC 14 - ICS overview Integrated Control Systems
Rack installation and local tests for the MEBT Chopper Rack
Stuart Birch On behalf of Protection Systems Group
Introduction to the ESS Integrated Control Systems
Update on Software Scope Control System Software
Presentation transcript:

Introduction to Integrated Control Systems Henrik Carling ESS/ICS Date: 2016-11

What is ICS about? The ESS facility is a large and complex machine with very much equipment that needs to work in synchronization - and with well-known configurations For this purpose almost all equipment at the ESS facility is connected to the Integrated Control System The control system is the ”central nervous system of ESS” Examples: Voltage supplies for magnets Vacuum systems Cryogenic equipment RF equipment Air conditioning in the tunnel An estimated 1.5 million control points will be needed

ICS Project scope Software Electronics Infrastructure Work package 01 Management and administration Work package 02 Software Applications Work package 03 Software core Work package 04 Hardware core Work package 05 Machine protection Work package 06 Equipment Work package 07 Control system infrastructure Work package 08 Physics Work package 09 Personnel safety systems Work package 10 Integration - Accelerator Work package 11 Integration - Target Work package 12 Integration - Instruments Work package 13 Integration - Conventional facilities Work package 14 Test Stands Work package 20 Installation Software Electronics Infrastructure Safety & protection

Technology scope for ICS The span of technical scope and the competencies needed in ICS is enormous From analog signals to Java-based high-end, big-data GUI:s in high performance, high availability PLC systems Safety and protection systems Infrastructure: networking, data centre, control room Systems integration, Installation Project management and administration Applicatoins (GUI, Web, Services) Databases Availability, performance Industrialization, maintenance Kernel drivers Operating systems (RT) Development environments EPICS CSS/Eclipse Digital communication PCB, packaging Test and validation Test and validation Analog electronics Digital electronics FPGA firmware Electronics hardware Software Safety and protection PLC Infrastructure

ESS ERIC BOARD OF DIRECTORS DIRECTOR GENERAL MACHINES DIRECTORATE SCIENCE DIRECTORATE PROJECT SUPPORT & ADMINISTRATION DIRECTORATE CONVENTIONAL FACILITIES ACCELERATOR NEUTRON INSTRUMENTS GENERAL SERVICES ES &H and Q TARGET NEUTRON TECHNOLOGIES HUMAN RESOURCES COMMUNICATIONS & EXTERNAL RELATIONS SYSTEMS ENGINEERING SCIENTIFIC ACTIVITIES FINANCE INTEGRATED CONTROL SYSTEM SCIENTIFIC PROJECTS INFORMATION TECHNOLOGY ENGINEERING & INTEGRATION SUPPORT DATA MANAGEMENT SOFTWARE CENTRE LEGAL SUPPLY, PROCUREMENT & LOGISTICS

ICS Organization 2016-11-07 Employee Consultant Temporary employee Henrik Carling Division head Wojtek Fabianowski in-kind manager IT/Infrastructure Anna Gillberg Team assistant Annika Nordt Safety and protection Daniel Piso Hardware and integration Hector Novella Deputy project manager Susanne Regnell Control Software Timo Korhonen Chief engineer Angel Monera FPGA Engineer David Brodrick Integrator Benedetto Gallese Integrator Ben Folsom PhD student Alessio Curri ICS administrator Start 2017-02-01 Denis Paulic PLC Engineer Javier Cerejo PhD Student François Bellorini Integrator Emanuele Laface Accelerator physicist Benjamin Bertrand Software engineer Start 2017-02-01 Manuel Zaera-Sanz PLC Engineer Joao Martins Integrator Start TBD Jeong Han Lee Integrator Jan-Åke Persson Senior software engineer Start TBD Claudio Rosati Software engineer Morteza Mansouri Safety Engineer Julen Etxeberria Intern Nick Levchenko Integrator Karin Rathsman Senior scientist Juan Esteban Müller Software scientist Start 2017-02-01 Riccard Andersson PhD student Simone Farina Embedded systems egineer Alexander Söderqvist Integrator Ricardo Fernandes Senior software engineer Leandro Fernandez Senior software engineer End 2016-12-31 Stuart Birch Senior safety engineer Niklas Claesson Integrator Krisztián Löki Integrator Thilo Friedrich PhD student Remy Mudingay Infrastructure engineer Yong Kian Sin IEC61508 engineer Open positions (2) Fredrik Luthander Software engineer Viktor Fred Electrical engineer Szandra Kövecses Technical coordinator Open positions (2) Consultants Open positions (2) Employee Consultant Temporary employee Consultant off-site Position under consideration

ICS In-kind partners Atomki, Hungary CEA, France CNRS/IPNO, France Partner Institutes Atomki, Hungary CEA, France CNRS/IPNO, France Elettra, Italy ESS Bilbao, Spain IFE, Norway INFN Catania, Italy INFN Legnaro, Italy PSI, Switzerland Tallinn Technical University, Estonia ÚJV Řež, Czech Republic University of Łódź , Poland Uppsala University, Sweden ZHAW, Switzerland Agreement signed Agreement waiting for signature Early discussions Collaboration agreement

ICS SOFTWARE ACTIVITIES

Software team scope description Controls configuration tools Controls Configuration Database (CCDB) Naming Server for naming convention Cable Database (CDB) IOC Factory CS Entry Role Based Access Control (RBAC) Clients Alarm Handling E-logbook Archiving System Save, Compare & Restore Scenario management GUI/HMI (Control System Studio) Core controls software Development/contributions to core EPICS Timing applications Post-mortem diagnostics Physics modelling Open XAL ESS Linac Simulator Beam Physics Applications Operation tools – Scripting frameworks iPython Scripting Execution Environment Macroserver Software development environment Vagrant for virtualization Ansible for automation of deployment and configuration of our software infrastructure Jenkins for continuous integration support

ICS Hardware platforms

Three layer strategy - control systems at ESS ICS has adopted a three layer strategy for implementing the control system based on signal speed A custom made platform based on microTCA for applications with data acquisition exceeding 100 kHz The CPU will run EPICS and the FPGA will have a complete application development environment For slower signals, EtherCAT will be used as a real-time fieldbus with good price/performance ratio Synchronization and event information are key for applications where a full custom platform solution would be too costly Low speed signals are handled with commercially available PLC systems from Siemens This is a cost-effective solution that addresses ESS reliability and maintainability requirements The PLC:s will be connected to EPICS for further integration into the control system A custom made microTCA board with a powerful FPGA and a CPU. A FPGA framework constitutes the development environment. The CPU runs EPICS Signal speed 10 MHz 1 MHz 100 kHz Digital controls platform 10 kHz 1 kHz EtherCAT I/O modules that are connected to commercial or open-source EtherCAT master controllers which are in turn connected to the EPICS based control system 100 Hz EtherCAT 10 Hz Slower signals are handled by industrial automation (PLC) for reliability and cost reasons. The standardized platform for ESS applications comes from Siemens 1 Hz 0.1 Hz Industrial automation (PLC)

SAFETY AND PROTECTION

Personnel safety system Scope overview statements The primary role of the Personnel safety systems is to protect ESS Workers/Personnel from hazards that have been identified during the development of the systems. Assessments and analysis will decide which hazards will be mitigated with the PSS. This will be achieved by controlling the access of personnel to controlled areas when a potential hazard is present. Note the PSS is not designed to mitigate radiation from activated components The ESS Accelerator PSS will also be used to control other hazards present within the accelerator tunnel as deemed appropriate Budget and organization Total PSS construction budget 5.9 M € In-kind potential: Low (<= 20%) Staffing ~6 FTE PSS core team in the construction phase Predicted staffing 5.5 FTE in operations phase

Control SYSTEM INFRASTRUCTURE

Control system infrastructure The scope in this work package infrastructure required for the Control System to operate A centralized ESS Control Room, which allows the entire facility to be controlled from the same location Operations consoles, servers and file storage required for operation Networks between Control boxes, Timing system units, Control Room, Data Centre and other control equipment Efforts and material required for connecting devices to the ICS

Integrated Control Systems Thank you for your attention