IMO SUB-COMMITTEE ON POLLUTION PREVENTION AND RESPONSE (PPR-5)

Slides:



Advertisements
Similar presentations
© 2006 TDA Development Draft and subject to amendments from consultation Performance Management Challenge for Schools PM workshops 23 October 2006.
Advertisements

Participation Requirements for a Guideline Panel Member.
Participation Requirements for a Patient Representative.
WMO WMO position on Geoengineering Deon Terblanche WMO; CAS MG9.
GA June 2012, AHL Meeting FVE General Assembly Amsterdam (NL), Friday 8 June 2012 Agenda point 9b: Animal Health Law a brief update Jan Vaarten Executive.
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on new buildings - Role and authority of Class Speaker – Robert Smart LR IACS Council.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
1 Anti-fouling Systems—Port State Control Inspection Huang Tianbing Marine Biosafety Section Bangkok, June 2009 Views expressed in this presentation are.
Fire Safety in European Hotels Dr SD Christian. Fire Safety in European Hotels Council Recommendation 86/666/EEC Fire Safety in European Hotels.
European Commission: DG Environment Streamlining and harmonizing climate change and air pollution requirements TFEIP, 23 – 24 May 2007, Dessau Eduard Dame.
Review of veterinary medicines legislation in 2010 Mario Nagtzaam Unit F2 „Pharmaceuticals“ Directorate-General Enterprise and Industry European Commission.
Regional Policy Veronica Gaffey Evaluation Unit DG Regional Policy International Monitoring Conference Budapest 11 th November 2011 Budapest 26 th September2013.
LISTINGS BY TALIBAN AND AL-QAIDA SANCTIONS COMMITTEE Briefing to the Select Committee on Security and Justice 12 Augustus
IRES: an update on the revision process Vladimir Markhonko United Nations Statistics Division The 4 th meeting of the Oslo Group on energy statistics Ottawa,
Tripartite Meeting Seoul, Korea, September 2009 Safety & SOLAS Agenda item 4.1 Goal-Based Standards --- application and compliance --- Toshiro Arima.
Working Party on Brakes and Running Gear (GRRF) General information Participants/Address list A provisional address list has been prepared: please check.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
Maritime Training & Human Element Section IMO IMO Regional Seminar on Familiarization with The 2010 Manila Amendments to the STCW Convention and Code Mumbai.
Task Force on Emission Inventories and Projections Emission inventory adjustments – an update TFEIP co-chairs: Chris Dore, Martin Adams and Kristina Saarinen.
Leading the way; making a difference Lunchtime Seminar October 10, 2012 Ballast Water Management JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Leading the way; making a difference Ballast Water Management State of Affairs Hong Kong, 26 November 2013 Tim Wilkins INTERTANKO Senior Manager - Environment.
Briefing to the Portfolio Committee on Police 21 August
Agenda item: 13 DEVELOPMENT OF UNITED NATIONS GUIDELINES AND RECOMMENDATIONS ON DISTRIBUTIVE TRADE STATISTICS (BOTH STRUCTURAL AND SHORT-TERM) OECD Short-term.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 Ministry of Environment and Spatial Planning of Kosovo Mr. Muhamet Malsiu, Acting Head.
European Commission / Taxation and Customs Union June 2009 StockholmInternational Tax Conference1 Tax Aspects of Tradable Emission permits: Commission's.
process and procedures for assessments
Informal document GRE-77-18
Vilnius CAS meeting sept , 2012
EUROPEAID/121737/D/SV/RO - Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural.
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Standing Committee on Training
International Maritime Organization
REPORT OF THE ELECTRONIC WORKING GROUP UNEP(DEC)/CAR WG.29/INF.12
The EU‘s ‚participatory‘ authorisation process for GMOs
Hydrographic Services and Standards Committee
Reprotoxic substances in the context of the revision of the 2004/37/EC (CMD) - Viewpoint from WPC and France - Matthieu Lassus Ministry of Labour, Employment,
EU Regulation on AVAS requirements
International Chamber of Shipping
Nick Bonvoisin Secretary to the Convention on the
سازمان بین المللی دریانوردی
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
IESBA Meeting New York September 17-20, 2018
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Vanda Nunes de Lima 18th June 2009
Inventory preparation for priority substances
WG on Article 83 of the SR. Doc Art83_07
(Adapted from the presentation made by Mr Colin Young at MACHC18)
Mandate of the Eurostat Working Group
Electric Vehicles and the Environment (EVE IWG)
IMO work to address GHG emissions from ships
Committees dealing with Taliban and Al-Qaida
Jill Michielssen European Commission, DG Environment
Common Understanding Way forward
Part I.
PRIORITY (HAZARDOUS) SUBSTANCES
Working group on data & information sharing DIS under CIS of WFD
Working Group on Rail Transport Statistics
Working Party on General Safety Provisions (GRSG) General information
MDD Market Participant Identity Committee - Terms of Reference
Adolfo Perujo (IWG chairman)
IMO SUB-COMMITTEE ON POLLUTION PREVENTION AND RESPONSE (PPR-6)
Assessment scales and aggregation
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Alexander (Sandy) Elliott HS4 Presentation
Working Party on Noise (GRB) General information and WP.29 highlights
Working Party on Noise (GRB) General information and WP.29 highlights
Presentation transcript:

IMO SUB-COMMITTEE ON POLLUTION PREVENTION AND RESPONSE (PPR-5) UPDATE ON THE PROPOSAL TO INCLUDE CONTROLS ON CYBUTRYNE IN THE IMO AFS CONVENTION

PPR-5, 5 to 9 Feb. 2018

PPR-5 Sub-Committee noted that the AFS Convention had entered into force on 17 September 2008 and that the number of Contracting Governments was currently 76, representing 93.70% of the world's merchant fleet tonnage. MEPC 71, having considered document MEPC 71/14 (Austria et al.), had agreed to include a new output on "Consideration of the initial proposal to amend annex 1 to the AFS Convention to include controls on cybutryne" in the Sub- Committee's biennial agenda for 2018-2019 and the provisional agenda for PPR 5

Documents submitted PPR 5/19 and PPR 5/INF.9 (both submitted by Austria et al.), containing the required elements for an initial proposal for amendments to annex 1 to the AFS Convention and the scientific evidence that supports the position that cybutryne can be associated with adverse effects to the environment; and PPR 5/INF.8 (IPPIC), offering to contribute to the process.

Working Group on Ballast Water Management and Anti-fouling Systems Sub-Committee instructed the Working Group to consider the initial proposal for amendment to annex 1 to the AFS Convention, contained in documents PPR 5/19 and PPR 5/INF.9, and advise the Sub-Committee accordingly. Co-chaired by Mr. Chris Wiley (Canada) and Dr. Sarah Bailey (Canada) EC supported by

Working Group on Ballast Water Management and Anti-fouling Systems Need for a robust process for risk assessments was highlighted and some concerns were expressed with regard to the possibly limited geographical scope of the risk assessments carried out by the co-sponsors of the proposal. However, it was recognized that at this session only the initial proposal needed to be considered and concerns could be addressed at the comprehensive proposal. Group agreed that the submitted initial proposal satisfied the requirements of annex 2 to the AFS Convention and that a more detailed review of cybutryne was warranted.

Working Group on Ballast Water Management and Anti-fouling Systems Recommendations: Comprehensive proposal to be submitted containing all the information required in annex 3 to the AFS Convention; Co-sponsors should take into account the concerns expressed (geographical scope) and interested delegations should liaise with the co- sponsors to support this goal; Extend output to 2020; Also prepare revision of relevant guidelines.

Timing

Thank you for your attention! Maik Schmahl European Commission DG MOVE – D.2 Disclaimer : This presentation does not constitute any formal commitment on behalf of the European Commission and represents the views and opinions of its author only.