New Permit Fees Building Permits *Commercial *Residential

Slides:



Advertisements
Similar presentations
1 EML 4601 LECTURE 1 H. A. (Skip) Ingley, PhD, PE Associate Professor in Mechanical and Aerospace Engineering Office: rm 228, MAEB building Office phone.
Advertisements

2015 Residential Mechanical Contractors Codes Forum Thank you for taking the time to join us today. We know you are busy and your time is valuable. Our.
The Building Team. The Design Team Architect –AIAAIA –Licensed Engineers –ASCEASCE –Licensed Building Designer Interior Designers –ASIDASID –NCIDQNCIDQ.
Meet the DBI Pros Summit October 25, 2006 Amy Lee, Acting Director CONDO CONVERSION.
1 October 11 & 12, 2007 Isam Hasenin, P.E., C.B.O., DIRECTOR CONDO CONVERSION October 11 & 12, 2007 Isam Hasenin, P.E., C.B.O., DIRECTOR.
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
Electrical Power Distribution in America % Coal 20.4% Nuclear 20.3% Natural Gas 6% Hydro Electric 3.4% Other
People Fractions. Problem 1 of 20 Answer 1 = 10 Problem 2 of 20 Answer 2 = 5.
Construction Unit 5, Lesson 3 Explanation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching and Learning™
Mr. Brad Dearing 108 University High School Normal, IL (309) Architectural Design.
Construction Technology Ken Brewer. Objectives Identify Construction Technology Understand Construction Technology Evaluate The Impacts Of Construction.
1 CMGT 400  RESIDENTIAL AND COMMERCIAL CODES  IRC 2009  IBC 2009.
Electric Power. Complete the table Power (watt) Resistance (ohms) Current (A) Voltage (v) Kettle Dryer (red) Dryer (white) Filter.
Revenue Survey. Probable Trends 2 Valuation Growth – Will show slow growth again in 2011 affecting the 2012 mill levy rate. Sales Taxes – Since.
2010 California Building Standards Code Adoption Jeffrey Lambert, Community Development Director Brian Clark, City Fire Marshal Andrew Stuffler, Chief.
Construction Unit 5, Lesson 3 Explanation Presentation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching.
Primary Considerations Site Considerations The community “Planned community” or no thought? Price range? Socio-economic category? Alive or dying community?
Fractions and Decimal Fractions Fractions Decimal Fractions
Edmonds Development Services Department. City of Edmonds  City of ~40,000  A record 1,559 building permits in 2015  Existing website, maintained by.
Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm.
February 2007 Commercial Vehicle Drivers Hours of Service Module 12: Special Permit – Research / Pilot Projects.
TCEQ Occupational Licensing Licensing Backflow Prevention Assembly Tester (BPAT)Overview Jacquelyn Mills, Occupational Licensing Presentation by Jacque.
Air Conditioning & Refrigeration Repair Houston, Texas
Best 20 jobs jobs sites.
R-5BCS Building Construction Services Department 2015 Adjusted Fee Schedule Resolution Stabilization of Commercial Building Permit Fee Multiplier.
About us: We have many residential and commercial customers, we provide them complete sales, services and installation services with premium quality of.
PLUS.
Find Top 10 Plumbers and plumbing contractors in USA
Valuation for Immigration
Solving Systems of Equations using Substitution
ADT plans & points - residential
Introduction.
Data Analysis Interpret Slope and y- Intercept
Lecture on Plant Assets, Natural Resources and Intangible Assets
Construction Documents
Best Plumbing Services in Delhi Best Plumbing Services in Delhi.
Book Electricians Online In Delhi Book Electricians Online In Delhi.
Proposed SEWER IMPACT FEES
Springfield Utility Board Proposed 5.0%
Melanie Halsan, PALS Warner Web, Fire Marshal
هجرة الشباب الدولية والتنمية الفرص والتحديات
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
EPAD-Louisville 101 EPAD-Louisville 101 Making Cent$ of Energy
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
“How you can become a licensed contractor”
Simplify Numerator Or Denominator Adding Fractions What is the Whole
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Engelhorn/danmor apts 410 West 3rd Avenue
الأعمال التجارية على وجه المقاولة
Amanda Jessee Codes and Regulations
Special Valuation Hobson Building 1213 West Railroad Avenue
Ohio – Electricity MARCH 2018 MARKET INFORMATION AEP Ohio
SPECIAL VALUATION 1021 – 1029 w First Ave New Madison hotel
Commercial Project Bidding Solution
Lesson 7-3 Solving Equations with Variables on Both Sides part 2
PAULSEN BUILDING 421 West Riverside Avenue
500 nm WRITE VOLTAGE 0 V.
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Enhanced Unitary HVAC Maintenance Tune-Up Program
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Ohio – Electricity & Natural Gas
Special valuation 604 W Park Place corbin Park historic district
Special Valuation Washington Cracker Co. 304 W. Pacific Avenue
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Ohio – Electricity MAY 2019 MARKET INFORMATION AEP Ohio
Ohio – Electricity JUNE 2019 MARKET INFORMATION AEP Ohio
Ohio – Electricity SEPTEMBER 2019 MARKET INFORMATION AEP Ohio
SPECIAL VALUATION 726 E 25th Avenue Dr. Charles Rigg House
Presentation transcript:

New Permit Fees Building Permits *Commercial *Residential *Electrical, HVAC, Plumbing & Low Voltage Min Fee Plus valuation cost – All plans submitted for review will incur an additional 30% of the permit value. Based on Valuation of the Job Requirements $1 - $500.00 $60.00 Flat Rate Fee $501 - $2000.00 $63.50 For the first $500, plus $3.50 for each additional $100, to and including $2000 $2001 -$25,000 $112.50 For the first $2000, or fraction thereof, plus $14.00 for each additional $1000, to and including $25,000 $25,001- $50,000 $434.50 For the $25,000 or fraction thereof, plus $10.10 for each additional $1000, to and including $50,000 $50,001 - $100,000 $687.00 For the first $50,000, or fraction thereof, plus $7 for each additional $1000, to and including $100,000 $100,001 - $500,000 $1,037 For the first $100,000, or fraction thereof, plus $5.60 for each additional $1000, to and including $500,000 $500,001 - $1,000,000 $3,277 For the first $500,000, or fraction thereof, plus $4.75 for each additional $1000, to and including $1,000,000 $1,000,001 and up $5,652 For the first $1,000,001, or fraction thereof, plus $3.65 for each additional $1000