Budget: ,00 € (90% Commission contribution)

Slides:



Advertisements
Similar presentations
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
Advertisements

Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Development plan and quality plan for your Project
Supported by Project Administration Second Project Meeting London, 10/11 March 2009 Liv Becker / Veit Bürger, Öko-Institut e.V.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
1 Hugo BERGER ICT - PSP Grant Agreement February 17 th 2009 Sofia.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
PROJECT LIFECYCLE.
HLANDATA PROJECT: FIRST RESULTS AND SYNERGIES Isabel Goñi, TRACASA.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Ministry of Education, Research and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism GR07 Research within.
Project Management.
National Agencies’ contribution to the evaluation of Grundtvig Action and to the National Evaluation Report on Socrates Programme Socrates - Grundtvig.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Methodology of RIA for European integration purposes and practical examples Outsourcing RIA preparation to external consultants: project management issues.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
RFP FOR DEVELOPMENT OF TRAINING MATERIAL, PROVISION OF BASE LINE TRAINING AND PROMOTION OF SASSA IN-HOUSE CORE TRAINING COMPETENCE.
Improvement in quality of State Statistics through the development of Statistical Metadata System Speaker : Principal Deputy of the Chairman of the State.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
Project Management PTM721S
The 6th Framework Programme
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Census Bureau Agency Briefing
“Everyone can access”.
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Project Integration Management
TechStambha PMP Certification Training
Head Statistics and Data Unit
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Post Enumeration Survey Census
Description of Revision
Provision of harmonized land cover information for lucas from the Finnish datasets Eurostat grant 2014 Provision of harmonized land cover/land use information:
WORKSHOP GROUP ON QUALITY IN STATISTICS
SCD Grants & Contracts Policy & Procedure 670.
Micro data linking – call for proposal item 12 of the agenda
Eggs for consumption Item 8.1
The 2006/2007 Urban Audit data collection
Preparatory Action 2011 European Voluntary Humanitarian Aid Corps Call for proposal
دائرة الإحصاءات العامة
Progress of the ESS.VIP ADMIN Special focus on the ESSnet on quality of multiple sources statistics. DIME/ITDG SG, Fabrice Gras, unit B1.
CIS12-3 IT Project Management
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
The Work programme
Integration of Territorial And Land Information
ESS.VIP ADMIN Sorina Vâju.
Pilot studies: land use and land cover statistics
Pilot studies: land use and land cover statistics
Rural development statistics
Passenger Mobility Statistics 21 May 2015
X-DIS/XBRL Phase 2 Kick-Off
Provision of harmonised land cover / land use information:
FY18 Water Use Data and Research Program Q & A Session
Chapter # 4 Development and Quality Plans
Integration of Territorial And Land Information
ESS.VIP ADMIN EssNet on Quality in Multi-source Statistics, progress report 19TH WORKING GROUP ON QUALITY IN STATISTICS, 6 December 2016 Fabrice Gras,
Morbidity statistics Item 10 of the agenda
Data collection and validation support for the management of the ESF
Collection and dissemination of data geo-referenced to a 1km² grid Item 3.2 of the draft agenda DSS Meeting 1 and 2 March 2018.
H.I. Reuter – DG EUROSTAT - E4 - GISCO
The GISCO Progress Report Nov – Feb By Albrecht Wirthmann
Presentation transcript:

Budget: 180.000,00 € (90% Commission contribution) PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 Contract Issues CONTRACT ISSUES Grant Agreement No: 40301.2012.002-2012.598 Signature Date: 27-12-2012 Budget: 180.000,00 € (90% Commission contribution) Project Duration: 18 months (starting from signature date) Beneficiary: Greek Ministry of Rural Development and Food Subcontractors: Agricultural University of Athens, Charokopio University of Athens Subcontractors Budget: 75.904,40€ Description of Working Packages: WP 1: Coordination of the Project-Project Management Duration 18 months WP 2: LU/LC Data Assessment and Comparison Duration 4 months WP 3: Geographical tool for estimating LU/LC Duration 8 months WP 4: Geographical tool to Support LUCAS HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 1

WP 1: COORDINATION OF THE PROJECT - PROJECT MANAGEMENT PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 WP1: Project Management WP 1: COORDINATION OF THE PROJECT - PROJECT MANAGEMENT Deliverable 1: PROJECT PLAN including Working Packages, Tasks, Deliverables, Time scheduling, assignments to Subcontractors and other Participants (Ministry of RDF and Greek Payment Authority of Common Agricultural Policy (OPEKEPE) . Status: Completed Deliverable 2: Selection of Subcontractors. Contracts have been signed (April 2013) with 2 university departments specialized in the project topics: Agricultural University of Athens and Charokopio University of Athens. Deliverable 3: Project Reporting, every semester. Status: Completed (for 1st Semester) Deliverable 4: Technical Interim Report. Status: under Completion (planned-actual date: 30 June 2013) Other Administrative Actions of WP 1: Formal selection of the Management Team. Status: Completed Formal selection of the other Operational Staff. Status: Due Date Legal Actions and Financial Management of the project. Status: Completed HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 2

WP 2: LU/LC DATA ASSESSMENT AND COMPARISON PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 WP 2: LU/LC Data Assessment and Comparison WP 2: LU/LC DATA ASSESSMENT AND COMPARISON Deliverables Description Planned Date Completion (in Jun. 2013) Actual Date 1 Documentation of LU/LC data sources (Agencies, Ministries, etc) Thorough investigation of the LU/LC data sources through the National Infrastructure for Spatial Information (due to the Directive 2007/2/EC) and according to the criteria set for the project. It resulted in the documentation of the central and local directories and agencies in charge of managing appropriate LU/LC geospatial data. Apr 2013 80% Jul 2013 2 Documentation of LU/LC data sets (specificities, classes, etc) Simultaneously, the previous investigation has been executed for the LU/LC data sets according to the criteria set for the project (including Metadata) It resulted in the documentation of the appropriate data sets that will be used for the project, including: specificities of different types, performance, coherence, time and spatial coverage, classes, quality & reliability 60% 3 Pilot data collection (definition of area-sets, data collection) Pilot data collection of the data sets in the Agricultural Sector (80%) 50% 4 Documentation on compliance and precision, compared to LUCAS The LU/LC datasets that will be used for the project have been compared to LUCAS documenting their compliance and precision 30% HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 3

WP 3: GEOGRAPHICAL TOOL FOR ESTIMATING LU/LC PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 WP 3: Geographical tool for estimating LU/LC WP 3: GEOGRAPHICAL TOOL FOR ESTIMATING LU/LC Deliverables Description Planned Date Completion (Jun. 2013) Actual Date 1 Methodology for calculating the total area of existing LU/LC data set classes through the new proposed classification system (class transformation system, pros and cons, approximations, uncertainties) Integration, through geo-spatial approaches, of the information obtained in WP 2. Use also of proxy information/variables and/or remote sensing data at pilot study level. Nov 2013 25% 2 Statistical and geographical tool for integrating the existing data according to the new methodology A comprehensive operational scheme will be set up and integrated in a GIS tool specifically designed for the project application. Transforming existed data classification to the requested one. 0% 3 Quality Assessment of the Methods and Data Technical limitations, data update interval, synergies with other data collection activities and other constraints. HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 4

WP 4: GEOGRAPHICAL TOOL TO SUPPORT LUCAS PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 WP 4: Geographical tool to Support LUCAS WP 4: GEOGRAPHICAL TOOL TO SUPPORT LUCAS Deliverables Description Planned Date Completion (Jun. 2013) Actual Date 1 Documentation of national in situ surveys Comparative and in depth assessment of all the data from national in situ surveys. May 2014 20% 2 Reporting of national in situ surveys compared to LUCAS (differences in classification, in precision, in timing, coverage, scope, grid) Differences in classification, in precision, in timing, coverage, scope, grid 0% 3 Project plan and geographical and geo-statistical tool for integrating national surveys with LUCAS (requirements for the reference year 2015) A concrete proposal for a national in-situ data collection survey integrating the next LUCAS survey will be prepared. 4 Feasibility assessment on integrating national surveys with LUCAS (costs, benefits drawbacks) Cost, benefits and drawbacks on how a in situ data collection survey/census could be integrated with a LUCAS survey HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 5

WP 1: No modifications requested PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 Project Update PROJECT UPDATE WP 1: No modifications requested WP 2: Request for 3 months extension. No influence on the entire project duration WP 3: No modifications requested WP 4: No modifications requested HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 6

PROJECT: Updating Land Cover Estimation Procedures in Greece and the Integration with LUCAS Survey REPORT JUNE 2013 Project Update Thank You Stilianos Kokkidis (Hellenic MRDF*) General Supervision and Coordination of the action * Ministry of Rural Development and Food HELLENIC DEMOCRACY Ministry of Rural Development and Food Slide 7