CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm - 5.15pm (with 15 min break) Assessments.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

PRESENTATION ON TURNKEY CONSTRUCTION.
Behaviour and Design of Steel Structures Lecture 3 Conceptual design.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Taking off and ESTIMATING
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
V-Cost Estimation 1.Costs Associated with Constructed Facilities
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
EM15 – Contractors COST MANAGEMENT
Restaurant Manager Blake Boykin.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Specification & Quantities Estimating
An Architect works to make designs for new buildings and the spaces around them. Working closely with users, clients and officials to make sure that projected.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 2 Introduction to Construction Procedures
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
It’s not just a SWAG* * Scientific Wild Ass Guess Developing the Project Estimate.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
Trading Accounts.
Measurement and Payment
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Roles and responsibilities PM
Quantity Surveying.
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Particular Conditions of Contract & Appendix to Tender
Drawings Introduction to FIDIC - Drawings -.
Estimating Project Costs
RIBA Plan of Work 2013.
Particular Conditions of Contract & Appendix to Tender
Project Development and Managing your Build Agenda
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Request for Proposal & Proposal
Pre-contract Planning and Practice
Cornerstones of Managerial Accounting, 6e
Engineering Project Tendering.
QS, MEASUREMENT, DOCUMENTATION, SMM
Contract and tender form Phases of designing Phases of implementation
RIBA Plan of Work 2013.
RIBA Plan Tom Robinson sir david Swindells Vii
Architecture & Interiors Design Process
Advancd Measurement and Contract Administration
Presentation transcript:

CERTIFICATE 4 IN BUILDING BCGBC4004A

18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments throughout

Assessment tasks/to submit every week Test end of First term Major assignment Final test (cordels)

Big folder with dividers Calculator Scale rule Pencils or Pacer Erasor Highlighters Punch Stapler USB memory stick

Arrive on time Buddy up

Estimating means the process of working out the Expected Nett Cost of constructing a building, and preparing a Tender or price for the finished project. 1. Calculating expected nett cost of the proposed building or work 2. Setting the Tender or selling price of the building or work

Considerations: The nature and Iocation of the work Building methods and time scales Bill of quantities Labor and productivity Supervision Office backup and overheads Materials and suppliers Mechanical plant Statutory requirements-Eg W.H.S -Insurance- Licences and Permits Scaffolding Non - mechanical plant Sub – contractors On - site facilities

Most often based on the traditional detailed quantity take-off and unit price estimating method. Quantities of materials are calculated from a full set of plans: site plan floor plans Specialist drawings/reports prepared by: consulting structural engineers consulting electrical engineers consulting hydraulic engineers consulting mechanical engineers specialist suppliers (eg. reinforcing steel fabricators, precast panel fabricators) Shop fitters Arborist sections details specifications finishes Schedules

Builder will need to: Study the drawings, specifications and bill of quantities Carry out a site visit Develop a method statement Prepare a preliminary construction program- (duration of the building works for accurate costing time related Preliminaries) Seek quotations for materials supply, sub-contract work and possibly plant hire- (especially relatively long-term items such as scaffolding)

Factors Determining the Tender/ Selling price The project risk Current state of the market Company policy (profit and mark ups) Importance of winning or losing the particular project So the Tender price = Expected Nett cost + Profit/Markup (if successful the contract will be based on this figure)

Definition- A bill of quantities is a list of numbered or coded items describing quantities and materials required to carry out the contract work that is divided into sections corresponding with their usual building trade and in accordance with the ASMMBW. A bill of Quantities- Is prepared by a trained Quantity Surveyor according to the ASMMBW. provides a common basis for tendering prevents differences of opinion/interpretation of the drawings and specification. a thorough check of the drawings and specification.

Professional Consultants

A formal BOQ is prepared according to ASMMBW. Arranged in trade order typically as you would construct Measure only the finished product - (no allowance for waste or laps) All dimensions before calculating to 2 decimal places Do not deduct for openings < 1m 2 or voids < 0.1m 3 in volume State dimensions in order of length, width and height or depth Units of measurement should be m, m 2, m 3, tonne (steel) All Billing quantities should be billed whole numbers. (except steel which is billed to 2 decimal places)

All ITEMS listed in alphabetical order and the first item on every page is A All descriptions shall adequately cover the work being measured as per the ASMMBW, but common methods of construction or stock sections need not be described in detail. The functions of the five columns in the PARTICULARS column shall be strictly observed and carefully set out in accordance with the general practice of a quantity surveyor. All dimensions are in metres and shall be taken to two decimal places In the dimension column horizontal Iines are used to signify the differences between linear, area, volume, number and weight measures. The measurement paper shall be spaced well apart to ensure clarity Headings and sub-headings are recommended to clearly identify section and sub- sections of a trade and shall be underlined The billing UNIT shall be in accordance with the ASMMBW The billing UNIT shall be placed adjacent to the last line of the description, followed by the extended measured QUANTITY, in their appropriate columns.

LINEAR TAKE OFF

AREA TAKE OFF

VOLUME TAKE OFF

100x25 hardwood (Page52)