Layout of passages between TT2 and TT2A

Slides:



Advertisements
Similar presentations
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
Advertisements

Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Stainless steel 316 CNMG MMC 2025 C5-PCLNL HP 3,0 1,5 1,0 0,5 0,25 0,10,15 0,20,25 0,30,350,40,5 1 v c 180 m/min Coolant pressure 7 bar Feed.
C5-PCLNL HP 3,0 1,5 1,0 0,5 0,25 0,10,15 0,20,25 0,30,350,40,5 1 Stainless steel 316 CNMG MM 2025 v c 180 m/min Coolant pressure 7 bar Feed.
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Parent Session #1 Thursday, March 5th, Parent Session #1 Thursday, March 5, 2015.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
PICTURES OF THE PROJECT 1 Upstream, downstream, general view, close surroundings Petroport Sable Road, N1, Cape town, South Africa – 3 October
SBS Magnet John J. LeRose. Assembly drawing of 48D48 magnet as used at BNL (vertical field)
Thermocouples Isolated Omega Type-E T/C as used on vessel, ~$30 ea In-house signal conditioning equipment Instrument one 3-coil set: Winding pack near.
Status of the Crystal Ball A.Starostin UCLA. Tasks in preparation for the polarized target experiments CB and the “cube” will be movable on rails – all.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Math 9 Unit 4 – Circle Geometry. Activity 3 – Chords Chord – a line segment that joints 2 points on a circle. A diameter of a circle is a chord through.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
SCALE FACTORS AND SIMILARITY Introducing scale factor.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
SBS Magnet and Support Status Robin Wines June 2013.
November 19,  A central angle of a circle is an angle with its vertex at the center of the circle.  The figurebelow illustrates.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
NOTICE : This presentation was given at the March 2008 “Lunch N Learn” at Ellison Technologies in Charlotte. The presentation is meant to be viewed with.
Design Update Puck and Gun Magnet February 16, 2016.
Stainless steel 316 CNMG MF 2025 C5-PCLNL HP 3,0 1,5 1,0 0,5 0,25 0,10,15 0,20,25 0,30,350,40,5 1 v c 180 m/min Coolant pressure 7 bar Feed.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
You have 10 seconds to name…
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
Christos Lamboudis HEP April. Athens Study of MDT response to neutrons and possible ageing effects Do we really need to worry about neutrons? Do.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
MonteCarlo Simulation
2K Cold Box FDR Introduction
MERcury Intense Experiment Experiment Layout
ILC GDE meeting Cryogenics
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Drawing Solid By Novianti.
Status on the PS/SPS  MERIT (nTOF11) interface
BC Technology Education Association
The General Triangle C B A.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
The General Triangle C B A.
Nitrogen release from the TT2A cryogenic solenoid systems
MERIT – status and schedule
BC Technology Education Association
Pythagoras theorem statement
Lines, rays and line segments
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
BC Technology Education Association
Presentation transcript:

Layout of passages between TT2 and TT2A CERN AB-ATB-EA http://cern.ch/merit/ VRVS session, 8th March 2006 VRVS session, 8th March 2006 CERN AB-ATB-EA

Updated ACAD file https://edms.cern.ch/document/695011/ Actual cryogenics line Entrance modifications Passages TT2/TT2A Cinematics VRVS session, 8th March 2006 CERN AB-ATB-EA

Layout of the passages 3 holes Downstream holes 1x upstream of solenoid: cryogenic lines (dia 30 cm) 2 x downstream of solenoid: other (dia each 20 cm) Downstream holes 1: fragile parts (fibers, detector signals ...) 2: high pressure hoses Passages with interior lining of stainless steel VRVS session, 8th March 2006 CERN AB-ATB-EA

Passages (top view) A B C VRVS session, 8th March 2006 CERN AB-ATB-EA

Passages (cut view 1) A C B VRVS session, 8th March 2006 CERN AB-ATB-EA

Passages (cut view 2) A B,C 0.4-0.7 m VRVS session, 8th March 2006 CERN AB-ATB-EA

Length of fiber path From z=0 to exit into TT2 5.8 m See orange line VRVS session, 8th March 2006 CERN AB-ATB-EA

Schedule VRVS session, 8th March 2006 CERN AB-ATB-EA