Adjustments to the Air Toxics Standards for Area Source Boilers Summary of 2012 Adjustments to Requirements Presentation for Annual SBEAP Meeting Chicago,

Slides:



Advertisements
Similar presentations
Welcome to Who Wants to be a Millionaire
Advertisements

1 "Isky Enviroearth System presentsIsky Enviroearth The Future of energy.
©2012 MFMER | slide-1 Mayo Clinic: Models of Clinical Education: Implications for Workforce Development Mayo School of Health Sciences Team – Mayo Clinic.
Projecting Cost Savings from the ADRC Network. Summary of Findings General fund savings to Medi-Cal for nursing facility stays could cover the cost of.
Regional Policy Example for calculating Estimated decrease of GHG Evaluation Network meeting Brussels, 14 th March
Cleaner Air Set-Asides (CASA) February 14, 2006 DRAFT Illinois Environmental Protection Agency / Bureau of Air.
Air Quality Rules Update North Carolina Division of Air Quality Outside Involvement Committee Meeting February 19, 2013.
1 Shale Gas Development and Production Activities Understanding Air Quality Impacts Mike Abraczinskas, Deputy Director North Carolina Division of Air Quality.
Clean Smokestacks Act Benefits Update Division of Air Quality March 17, /17/2010.
Environmental Leadership The Pursuit of Cleaner Air
North Carolina Division of Air Quality 1641 Mail Service Center - Raleigh, NC (919) PART 4 How to report to NC – the.
Reporting 2011 Emissions Inventories WELCOME! Major Facilities.
Welcome to Who Wants to be a Millionaire
1 Mandatory Refuse and Recycling Collection Service Alternatives Utilities Department Orange County Board of County Commissioners December 17, 2013.
Facilities: A Sampling of Sustainability Efforts Guaranteed Energy Savings Agreement (GESA) Geothermal LEED Building Construction Natural Gas Vehicles.
RT-130 Annual Wildland Refresher Training
Cindy Zeldin Presentation to GCCN Annual Conference Executive Director, Georgians for a Healthy Future May 3, 2013 The Changing Health Care Policy Landscape:
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Steven Jin, P.E. The 4 th IGCC June 27, Many water delivery systems do not own enough storage capacity. They adjust pumping to roughly match the.
ICAO Symposium on Aviation and Climate Change, Destination Green, 14 – 16 May 2013 Destination Green The Carbon Pricing Mechanism in Australia Presented.
Sector-Based Pollution Prevention: Toxic Reductions through Energy Efficiency and Conservation Among Industrial Boilers A Presentation to the GLPPR Erie,
Tim Davis NJDEP – Air C&E
Triangle Tube Boiler Fuel Cost Savings Worksheet Prepared for: Customer Name: Street: City, State, Zip: Day Phone: Evening Phone: Cell Phone:
1 Oil shale – viewed in the light of the Estonian experience.
Part 63 Boiler Rule for Area Sources AWMA Conference September 11-14, 2012 Biloxi, MS Lee Page Air Toxics Assessment and Implementation Section U.S. Environmental.
Saving Energy In Schools Okehampton College - Devon.
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Environmental Compliance Hot Topics Hardwood Plywood Veneer Association May 25, 2010.
Adjustments to the Air Toxics Standards for Major and Area Source Boilers 40 CFR Part 63, Subparts DDDDD and JJJJJJ Summary of Final Changes, Key Highlights.
Energy Efficient Steam Systems
Pyrolysis oil 1 Kasperi Karhapää Fortum Otso ® FIBIC –seminar , Fortum.
Non-Hazardous Secondary Materials Definition: How it Relates to Boiler MACT and CISWI Rules Biloxi, MS ♦ September 13, 2012 Melissa Hillman Justin Fickas.
North Carolina Division of Air Quality - Mercury Regulations, Emissions, and Deposition Modeling in North Carolina Presented for 6th Annual Unifour Air.
Amerities West Public Information Meeting Thursday, February 27
High-level benchmarking Scientific Research Organisation – 150,000sq.m Jo Harris.
INFORMATIONAL MEETING – Industrial Baking Ovens Solid Fuel Burning Devices Appliance Pilot Lights.
FACILITIES BUDGETING / LONG RANGE PLANNING 2012 PASBO Mark A. Czapp George W. Ioannidis Spring Grove Area School District.
Maximizing Investment Recovery on Power Plant Closures Gregg Epstein Perry Videx. LLC May 10, 2013 New Orleans, LA.
COMBUSTION CONTROL IN BOILERS 1 Dept. of Electronics & Instrumentation, Narayana Engineering College, Nellore.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal.
Hydraulic Fracturing and Air Issues in the Oil and Natural Gas Sector
Health Systems Leaders Panel 2013 Wisconsin Health Improvement and Research Partnerships Forum September 13, 2013.
NPMA YANKEE CHAPTER PRESENTATION September 26, 2013.
July 2014 Epi slides.
LOJ Feb 2004 Radioactivity 3 Background radiation.
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
FY 15 Salary Proposal Budget Commission Meeting April 17, 2014.
Abertawe Bro Morgannwg University HB trends in routine childhood immunisations Quarter 1 Source: Public Health Wales quarterly COVER reports,
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Media Information: The Magic Network – North West.
From Scarcity to Abundance: How the Energy Boom is Transforming America’s Economy Presentation to Cincinnati Economics Organization Bernard L. Weinstein,
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Fiscal Year 2012/13 Mid-Year Budget Report. Budget Balancing for FY 12/13 and 13/14 FY 12/13 Expenditures Sheriff $ (6.2) PSEC Salary Increase Patrols.
Church Finances July Financial Update financial year summary for general account Building fund income and expenditure to date Projection.
Joe Nestler, P.E. Bureau of State Highway Programs Division of Transportation Investment Management WTBA / WisDOT Contractor Engineer Conference January.
Pierre Gauthier Mars, 2013 Association de L’industrie électrique du Québec The Québec Electricity Market- United States.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality July 2013 Environmental Management Commission.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
North Carolina Division of Air Quality Report on Control of Mercury Emissions from Coal-Fired Electric Generating Units In response to 15 NCAC 02D.2509(b)
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality Air Toxics Rule Changes Stakeholder Meeting March 20,
NC Toxic Air Pollutant Reports (pursuant to Session Law ) North Carolina Division of Air Quality Air Quality Committee Meeting January 9, 2013.
1 Greenhouse Gas Inventories for Tribes Melinda Ronca Battista, ITEP.
Window to My Environment Tom Brody Region 5 US EPA (Chicago)
Air Quality 60 years ago. “Smog is a Serious Problem” People outside of L.A. are sending friends cans labeled, “Pure air. Caution, may be habit forming.”
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Fuels for Schools & Beyond Biomass Boilers Status March 18, 2009.
Massachusetts Biomedical Industry 1  Largest Employer of Biomed R&D nationwide  Highest Growth in Biopharma Manufacturing in last Decade  2 nd State.
NSPS Rulemakings for Greenhouse Gas Emissions
Presentation transcript:

Adjustments to the Air Toxics Standards for Area Source Boilers Summary of 2012 Adjustments to Requirements Presentation for Annual SBEAP Meeting Chicago, IL May 15, 2013

2 The Right Standards for the Right Boilers Of 1.5 million boilers located at major source and area source facilities in the U.S., less than 1% will need to meet numerical emission limits 13% (about 197,000) will need to meet work practice requirements, such as periodic tune-ups, to minimize toxics. 86% are gas-fired boilers located at area source facilities and are not covered by these rules. Many of these boilers are at places like hospitals, schools and churches. ~1.3 million boilers not covered by rules ~197,000 covered by rules <1% (about 2,300) will need to meet numerical emission limits to minimize toxics. Most of these are larger boilers located at industrial facilities.

3 Area Source Boilers About 183,000 regulated boilers No natural gas boilers are covered by the rule Greater than 99% (about 182,400) will need to follow work practice standards to conduct biennial or 5-year tune-ups, to minimize toxics. Some will also need to perform a one-time energy assessment. Less than 1% (about 600 coal-burning boilers) will need to meet numerical emission limits to minimize toxics. Greater than 99% follow work practices Less than 1% have emission limits

Key Adjustments Adjusted certain deadlines Revised the deadline for initial notification for existing area source boilers to no later than January 20, 2014 Extended by two years the compliance date for existing boilers subject to the tune-up requirement such that the compliance date is March 21, 2014 (which is also the compliance date for boilers subject to emission limits and subject to the energy assessment requirement) Adjusted emission limits Revised Hg emission limit for new and existing large coal-fired boilers to 2.2 x lb/MMBtu of heat Revised CO emission limit for new and existing large coal-fired boilers to 420 ppm by volume on a dry basis corrected to 3% oxygen 4

Key Adjustments Added to and refined the list of subcategories Clarified that certain boilers are not part of the source categories being regulated Residential boilers - used primarily for heat and/or hot water for dwellings containing up to four families or single unit residences that have been converted or subdivided into apartments or condos Temporary boilers - used temporarily in place of another boiler while that unit is being replaced or repaired, generally over an operational period of less than 12 months, unless an extension is approved Electric boilers Electric utility steam generating units covered by 40 CFR part 63 subpart UUUUU Revised definition for Boiler to clarify that process heaters are not part of the source categories being regulated 5

Key Adjustments Added to and refined the list of subcategories (cont.) Revised definition for Hot water heater to clarify that the definition includes biomass fuel and small hot water boilers (e.g., not generating steam) rated at less than 1.6 million Btu per hour Added subcategories to which reduced requirements apply Seasonal boilers Biomass- or oil-fired boilers that undergo a shutdown of at least 7 consecutive months each 12-month period due to seasonal conditions, except for periodic testing (not to exceed a combined total of 15 days during the shutdown) Subject to tune-up and energy assessment requirements, as applicable No numeric emission limits Limited-use boilers Solid- or liquid-fired boilers with a federally enforceable average annual capacity factor of no more than 10 percent Subject to tune-up requirements No numeric emission limits or one-time energy assessment 6

Key Adjustments Reduced tune-up frequency for certain boilers Specify that tune-ups must be conducted while burning the type of fuel that provided the majority of the heat input to the boiler over the 12 months prior to the tune-up Require tune-ups every 5 years, instead of every 2 years, for: Seasonally-operated boilers Limited-use boilers Oil-fired boilers with heat input capacity of equal to or less than 5 MMBtu/hr Boilers with oxygen trim systems System of monitors that are used to maintain an optimum air-to-fuel ratio by setting excess air in the boiler at a desired level Typical system includes a flue gas oxygen and/or CO monitor that provides a feedback signal to the combustion air controller 7

Key Adjustments Reduced tune-up frequency for certain boilers (cont.) Allow inspections of the burner and system controlling the air-to-fuel ratio to be delayed until the next scheduled unit shutdown (not to exceed 36 months and 72 months from the previous inspection, as applicable) Allow CO measurements taken before and after tune-up adjustments to be taken using a portable CO analyzer Specify that initial tune-ups are not required for new boilers but applicable biennial or 5-year tune-up must be conducted no later than 25 months or 61 months, respectively, after the initial startup Specify that if the boiler is not operating on the required date for a tune-up, the tune-up must be conducted within 30 days of startup 8

Key Adjustments Revised energy assessment provisions Clarify that the energy assessment is limited to only those energy use systems located on-site associated with the affected boilers Waive energy assessor approval and qualification requirements in instances where past or amended energy assessments are used Specify that sources that operate under energy management programs compatible with ISO that include the affected boilers satisfy the energy assessment requirement Provided compliance alternative for PM for certain oil-fired boilers Specify that new oil-fired boilers that combust only low-sulfur oil are considered to be meeting the PM emission standard via an alternative method and are not subject to the PM emission limit (same provision as is in 40 CFR part 60 subpart Dc) 9

Key Adjustments Reduced fuel sampling requirements Specify that if, when demonstrating initial compliance with the Hg emission limit, the Hg constituents in the fuel or fuel mixture are measured to be equal to or less than half of the Hg emission limit, the owner or operator of that coal-fired boiler does not need to conduct further fuel analysis sampling If the Hg constituents are greater than half of the emission limit, quarterly fuel sampling must be conducted Reduced performance testing requirements Specify that if, when demonstrating initial compliance with the PM emission limit, the performance test results show that the PM emissions are equal to or less than half of the PM emission limit, the owner or operator of that boiler does not need to conduct further PM emissions testing If the PM emissions are greater than half of the emission limit, triennial performance stack testing must be conducted 10

Key Adjustments Provided continuous compliance alternative for CO emission limit Allow CO CEMS as compliance alternative to performance stack testing and monitoring oxygen content Revised the averaging period for continuous parameter monitoring to a 30-day rolling average Revised provisions for dual-fuel fired boilers Specify that existing dual-fuel fired boilers (i.e., commenced construction or reconstruction on or before June 4, 2010) that fuel switch from gas to coal, biomass or oil after June 4, 2010 will still be considered existing sources as long as the boiler was designed to accommodate the alternate fuel New dual-fuel fired boilers that make such a fuel switch will continue to be considered new sources 11

Key Adjustments Revised certain notification requirements Deadline for initial notification for existing area source boilers is now January 20, 2014 Resubmittal of initial notification is not required if previous notification was provided, unless there has been a change in applicability Notification of compliance status must be submitted electronically using the Compliance and Emissions Data Reporting Interface (CEDRI) on EPAs Central Data Exchange (CDX) ( If you already submitted your Notification of Compliance Status (e.g., you already conducted your initial tune-up), you do not need to resubmit the notification. Paper submittal of the Notification of Compliance Status will be accepted up to the time that the CEDRI form is available. 12

Key Adjustments Revised certain notification requirements (cont.) Specify that sources must provide notice within 30 days of the change if you have switched fuels or made a physical change to the boiler and the fuel switch or change resulted in: the applicability of a different subcategory within subpart JJJJJJ the boiler becoming subject to subpart JJJJJJ, or the boiler switching out of subpart JJJJJJ due to a change to 100 percent natural gas 13

Key Adjustments Revised certain reporting requirements A copy of the energy assessment report must be maintained Records of monthly fuel use by each boiler subject to an emission limit, including the type(s) of fuel and amount(s) used, must be maintained For seasonal boilers, records of days of operation per year must be maintained For limited-use boilers, a copy of the federally enforceable permit and records of fuel use for the days the boiler is operating must be maintained For boilers that only conduct a biennial or 5-year tune-up and are not subject to emission or operating limits, only a biennial or 5-year Compliance Certification Report must be prepared Reports should be prepared by March 1 of the year after the calendar year during which a tune-up is completed Report does not have to be submitted. 14

Key Adjustments Boiler Compliance Tools includes information for Area Source Boilers: Fact sheets Summary brochure Small entity compliance guide Tune-up guide for owners and operators Tune-up guide for technicians Summary of energy assessment requirements Example initial notification form Example notification of compliance status forms Example tune-up record and compliance certification Electronic reporting information Compliance assistance contacts 15

Key Adjustments Boiler Compliance Tools (cont.) includes information on Area Source Boilers as well as Major Source Boilers: Federal Register notices Fact sheets Technical support documents Response to Comments documents Implementation tools DOE webpage on energy assessment ssment.html ssment.html 16

For More Information Contact: Rule Content: Mary Johnson – ; Applicability Determinations: Sara Ayres – ; 17

Appendix

Emission Limits for Area Source Boilers Subcategory2011 Final Rule Emission LimitsReconsideration Final Rule Emission Limits Hg, lb/TBtuCO, ppmPM, lb/MMBtuHg, lb/TBtuCO, ppm 3% oxygen PM, lb/MMBtu New Coal 10 MMBtu/h ( 30 MMBtu/h) 0.42 (10 to 30 MMBtu/h) No Change New Biomass 10 MMBtu/h ( 30 MMBtu/h) 0.07 (10 to 30 MMBtu/h) --No Change New Oil 10 MMBtu/h No Change Existing Coal 10 MMBtu/h (600 units) No Change Existing Coal < 10 MMBtu/h (3,100 units) Existing Biomass (168,000 units) Existing Oil (11,000 units) New and existing small (<10 MMBtu/h) coal-fired boilers, new and existing biomass-fired boilers, and new and existing oil-fired boilers are subject to a biennial tune-up requirement. New and existing seasonal boilers, limited-use boilers, oil-fired boilers with heat input capacity 5 MMBtu/h, and boilers with an oxygen trim system are subject to a 5-year tune-up requirement. Existing coal-fired, biomass-fired, or oil-fired boilers with heat input capacity 10 MMBtu/h (not including limited-use boilers) are subject to a one-time energy assessment requirement.