Joel T. Amato Chief Boiler Inspector

Slides:



Advertisements
Similar presentations
The next generation of VITODENS 200
Advertisements

Residential Gas – Honeywell Valve - Thermopile Powered Series 300/301
Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Flammable and Combustible Liquids
Flammable and Combustible Liquid & Compressed Gas Handling and Storage
Preventing Equipment Failures
State of Connecticut Department of Construction Services Bureau of Boilers.
Power Plant Engineering
Fired And Unfired Pressure Vessels
HVAC523 Heat Sources.
Common Boiler Installation Problems
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Introductions My name is Randall Austin
Mountings & Accessories
ASME Certified Yankee Dryer King Hardware May 3rd, 2010.
VF™ Series Boiler.
Installing & Testing Regulators
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
1926 Subpart J Establishes the requirements for welding and cutting in the construction industry Establishes requirements for equipment, fire protection,
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
PHOENIX OIL HEATER Producing advanced oil heaters with innovative technology. Efficiency you can measure at the gas meter.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
1. The student will be able to describe: ◦ the history of ASME and the National Board ◦ the history of the National Board Inspection Code ◦ how the NBIC.
Backflow Training Introduction to Backflow For Irrigation Systems.
7.3.2 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Electronic Ignition.
Boiler Mountings.
ASME Nuclear Conformity Assessment
How much do you do?. What is a Boiler? A boiler is a vessel that is is under pressure and is being heated. The boiler will have a National Board # on.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Gas Transmission Pipelines
Unit 206: Domestic hot water systems
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.7 Student Book © 2004 Propane Education & Research CouncilPage Selecting Regulators for Vapor Distribution Systems Regulators are mechanical.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
VENTING AND COMBUSTION AIR
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
Integrity Testing of Aboveground Storage Tanks 2012 Southern Section AWMA Annual Meeting and Conference Andrew Covington, P.E.
Gas Furnace Planned Maintenance
Michigan’s Hydrogen Rules Department of Environmental Quality.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
NFPA 31 Standard for the installation of Oil- Burning Equipment
Air Conditioning International Mechanical Code
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
Application – Identifying, Listing Equipment, and Documentation
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
1 HVAC122 - Gas Gas Valves. 2 Solenoid Gas Valves The solenoid gas valve is the simplest of all valves. This valve has an electrical magnetic coil which.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Flammable Liquids Directorate of Training and Education
Boiler Safety Valve Regulations
“Beyond the loop layout”.  Jeremy Neven, C.B.C.O. ◦ Chief Building Official ◦ Plumber ◦ HVAC Designer ◦
Unit 7 Gas Heat: Natural and LP
Subsea 100 Global Services Products Presentation
Flammable and Combustible Liquids
Boiler Safety Valve Regulations
Presentation transcript:

Joel T. Amato Chief Boiler Inspector Construction Codes and Licensing, Boiler Division Boiler Inspection Requirements Joel T. Amato Chief Boiler Inspector

Boiler Division Established in 1881, 133 years old Regulate the Construction, Installation, and Inspection of Boilers and Pressure Vessels Boats for hire Historical Boilers Manufacturers and Repair Firms

Boiler Division 10- Inspectors 78,736- Boilers and Pressure Vessels Approximately 20,000 boilers 242- Historical Boilers 103- Boats 78- ASME / National Board Stampholders

Boilers Steam boilers over 100,000 btu input HWH boilers over 750,000 btu input HWS boilers over 500,000 btu input Built to ASME Code Registered with the National Board Compliance with ASME CSD-1 required All new installations of steam and HWH boilers must be hydrostatically tested after installation is complete and before boiler is put in operation. Test must be witnessed by a State inspector. Hydrostatic test requirements do not apply to HWS.

Pressure Vessels Inspection Required Air storage greater than 5 cubic feet (38 gallons) or 100 psi Air storage greater than 1.5 cubic feet (11.22 gallons) and 600 psi Other tanks over that exceed 210 degrees, 160 psi, or 120 gallons Possible changes to Section VIII, for pressure vessels

Manufacturers and Repair Firms ASME Code Shops National Board “R” Stamp Holders Triennial Audits

Why do we inspect? https://www.youtube.com/watch?v=JsoE4F2Pb20 https://www.youtube.com/watch?v=jbreKn4PoAc

CF-190 Vents, Bleeds, and Relief valve lines Vent Lines: piping or tubing that conveys the release of gases from fuel train components Bleed Lines: piping or tubing that conveys the release of gases from fuel train components, which periodically releases gas pressure to the atmosphere in order to operate properly Relief Valve Lines: piping or tubing that conveys the release of gas from the relief valve

CF-190 Vent Lines Gas-pressure regulators, combination gas controls, pressure interlock switches, and all other fuel train components requiring atmospheric pressure to balance a diaphragm shall have the atmospheric side of the diaphragm connected to a vent line that shall be piped by the installer to the outdoors at a safe point of discharge as determined by the AHJ.

CF-190 Bleed Lines Gas-pressure regulators, combination gas controls, pressure interlock switches, and all other fuel train components that periodically release gas into the atmosphere in order to properly operate shall be connected to a bleed line that shall be piped by the installer to the outdoors at a safe point of discharge as determined by the AHJ.

CF-190 Vent Limiters Gas pressure regulators, combination gas control, pressure interlock switch, or other fuel train components incorporating a vent limiter shall be permitted to vent directly into ambient space.

CF-190 Gas Pressure Relief Lines Outlets of gas pressure relief valves shall be piped by the installer to the outdoors at a safe point of discharge as determined by the AHJ. Piping must be the same size or greater than the outlet connection to the valve Multiple relief lines must be piped independently

CF-190 Vent Valve lines Vent Valve: A normally open, power closed valve piped between the two safety shutoff valves. Must be piped outdoors by installer Piping must be full size for the entire length Multiple lines must be piped seperately

CF-190 Manifolding Lines Must be approved by AHJ Shall have cross sectional area of the largest branch line plus 50% of the additional cross sectional area of additional lines

CF-190 Manifolding lines The following is not permitted Manifolding gas-pressure relief lines Manifolding of vent valve lines with vent lines or bleed lines Manifolding of any vent, bleed, relief, or vent valve lines of one boiler unit to any lines from another boiler

CF-190 Vents, Bleeds, etc. Combination gas control integrating an internal gas bleed line shall be permitted to discharge its bleed line back into the valve body Piping or line point of discharge shall be protected from foreign material, moisture, or insects Bleed or vent lines may discharge to a continuous pilot, not manifolded and point of discharge uses a burner tip

Code Facts, Section IV ASME Certification Mark “H” Designator for shop/field assembled boilers Use of Stainless Steel (HF-201) Limited to 210 degrees Maximum Temperature Safety valve mounting

Section IV Boilers Hamilton Engineering (EVO Boilers)

Section IV Boilers (EVO Boilers)

Section IV Boilers (Viessmann) Must Comply with ANSI Z21.13 or CSD-1 Observation port for burner and main flame Vitodens 200-W

Section IV Boilers (Viessmann) ANSI Z 21.13 1.6.14 Provision shall be made to permit observation of main burner flames during adjustment and under operating conditions. 1.6.15 A flame observation port of a direct vent boiler shall be constructed of heat resistant material and, unless located within the cabinet casing, shall be protected from mechanical damage. Glass, if used, shall be framed and not less than 1/8 in (3.2 mm) thick.

Section IV Boilers (Fulton Pulse) Gems Sensors, Probe type LWCO Does not prove lockout, resets after 60 second test. Under Review by CSD-1 Committee

Section IV Boilers (Aerco) Combustion Air Proving Switch Must be tested by AERCO trained Technician Test performed at start up High Temp Limit Switch New sensors eliminate over temperature prior to shutting off fuel supply to burner

Section IV Boilers (Aerco) Gas Pressure Regulator Cracks

Section IV Boilers, (Aerco)

Section IV Boilers, (Weil Mclain) Lowest visible part of the gage glass shall be at least 1” above the the lowest permissible water level recommended by the manufacturer. HG-603

Section IV Boilers, Patterson Kelley

Section IV Boilers, Patterson Kelley

Section IV Boilers, Patterson Kelley

Important Dates 1957: ASME Code 1982: NBIC 1984: CSD-1, 1982 Edition Steam: 2 LWCO Steam: High Pressure Limit, Manual Reset HWH: LWCO with Manual Reset HWH: High Temp limit with Manual Reset 1993: E-Stop 1994: National Board Registration Current Edition Adopted: 2012

Inspection Reports Electronic Transfer, 75% Violation Tracking Must be written out Each Report must have one of these MNB (State Reg No / Jurisdiction No) NB (National Board Number) Serial No, or Other No

CSD-1, CW-520 Water heater A vessel which is closed except for openings through which water can flow, that includes the apparatus by which heat is generated and on which all controls and safety devices necessary to prevent pressure greater than 160 psig and water temperatures greater than 210 degrees F are provided, in which potable water is heated by the combustion of fuels, electricity or any other heat source withdrawn for external use.

CSD-1, CW-520 Hot water supply boiler ASME Code Section IV A boiler that furnishes hot water to be used externally to itself at a pressure less than or equal to 160 psig or a temperature less than or equal to 250 degrees F at or neat the boiler outlet. ASME Code Section IV Limits Temperature of Water Heaters to 210 degrees F, and 160 psi (HLW stamp)

CSA vs AMSE/NB Capacity http://www.nationalboard.org/SiteDocuments/Bulletins/WI2014.pdf

NB Bulletin, Winter 2014 Which capacity should be used? The answer: match the code of construction with the certified capacity rating. If the valve is protecting an ASME Section IV code-stamped hot water heater, then use the ASME/National Board capacity which is determined by ASME Section IV requirements. If it is not ASME Section IV code stamped, then use the CSA rating.

Commission Continuing Education

Commission Continuing Education

Website http://www.dli.mn.gov/Ccld.asp Email: joel.amato@state.mn.us Phone: 651-284-5137