WRAP Regional Haze Planning Schedule of Communication

Slides:



Advertisements
Similar presentations
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Advertisements

1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
CBP BMP Verification Program Development: Requests for Decisions on Panel Membership and Revised Schedule CBP Partnership Management Board September 13,
Regional Haze Update & Current Results Michele Notarianni Brenda Johnson EPA Region 4.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September , 2002.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Summer Flounder Amendment August 13, 2014 Washington, DC Review of Revised Draft Scoping Document.
1 Update on the STIP-II Project & Draft Model SIP Brian Finneran Oregon Department of Environmental Quality WRAP Meeting Portland, OR April 3, 2003.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Title V: The Big Picture
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
1 The SIP Process: A case study in political reality and interpretation of bureaucratic language Presented by Scott Weir Air Quality Coordinator Kickapoo.
Ozone and NOx in the West WRAP November 11, 2009 Santa Fe, New Mexico Don Arkell Regional Haze Implementation.
Semester Conversion CPP Academic Senate March 12 th by F.A.Neto Semester Conversion Director 3/12/20141FAN.
DISTRICT IMPROVEMENT PLAN Technology Domain Annual Progress Report Lakewood School District # 306.
Update on the STIP-II Project: Draft Model SIP Brian Finneran Oregon Department of Environmental Quality WRAP Air Manager’s Committee Santa Fe, NM March.
1. Perimeter Approach to Plant Protection Presentation to RCC Stakeholder Dialogue Session January 2014 Canadian Food Inspection Agency Steve Côté
Wrap Up GNC Partner Meeting 17 th – 18 th March 2015 Geneva, Switzerland.
Western Emissions Budget (WEB) Trading Program: Model Rule, Model SIP/TIP, MOU Bob Lebens, WESTAR Council Air Managers Committee March 19, 2003.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Review of the revised EMEP/Corinair Emission Inventory Guidebook On behalf of EMEP, EEA and the EC (co-leaders of the advisory editorial group)
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
Summary of STIP Project Workplan Development of A Model SIP/TIP for Section Brian Finneran, Oregon DEQ WESTAR Fall Technical Conference September.
DRAFT USEPA Office of Compliance Update: 90 CWA Action Plan, State Review Framework, & OECA National Priority Selection Presentation to NACAA Chris Knopes.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
Update on the WRAP STIP-2 Project Brian Finneran Oregon Department of Environmental Quality WRAP Board Meeting, Tempe AZ November 13, 2002.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting September 12, 2011.
Virgil Dupuis, George Godfrey, John Phillips and Susan Ratcliffe
Submittal And Review Of New And Revised Water Quality Standards
Summary Report Project Name: Interface Library Project (ILP)
Tribal Hazard Mitigation Planning
Proposed Bay TMDL Schedule
By: Project Manager Date: dd mmm yyyy
Visibility Coordinator Regional Haze
WRAP Charter Revisions, Board of Directors and Funding
Southern Sierra IRWMP Update
Arizona Regional Haze State Implementation Plan
Webinar: ESSA Improvement Planning Requirements
C&T Rule Implementation
Monthly Update on WRAP Workplan
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Strategic Plan Implementation July 18, 2018
International Comparison Program 2011 Round
Submitting & Adopting a Tribal Implementation Plan
Implementing 8-Hour Ozone, PM2.5, and Regional Haze Standards
Tribal Data WG Fire and Smoke WG Oil and Gas WG
HLC TEAMS Work Plan Expectations Important Dates
Dana Williamson, Director Texas Health and Human Services Commission
Region Your name.
The Strategic Outcomes & Local Delivery Plan
Reporting Dashboard of WGITA
Market Trading Forum Update
Water Scarcity & Droughts Policy in the EU Gap Analysis
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Regional Haze SIP Status Report
Next Steps on the §309 Regional Technical Support Document April 2003
Project Kick-off <Customer Name> <Project Name>
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Workshop Technical and Policy Studies to Support the Annex
Semester Conversion CPP Academic Senate March 12th by F. A
Market Trading Forum Update
Regional Haze Regulatory Developments
Spring 2007 due dates March 1st - Immigrant count
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Presentation transcript:

WRAP Regional Haze Planning Schedule of Communication D R A F T Spring Begin regular stakeholder engagement on source screening and control measures Summer Continue regular stakeholder engagement on source screening and control measures 2019 Fall Host meeting with stakeholders to discuss steps taken to date, process moving forward, proposed control measures, projected visibility improvement State-tribal coordination through EPA and for sources requiring controls on tribal lands Winter Spring Continue stakeholder engagement on draft control plan 2020 Summer State-tribal coordination on draft SIPs/TIPs Fall Begin formal comment period Winter Indicates Significant Tribal C&C Milestone Respond to comments, revise plan as necessary Spring 2021 Timeline includes selected items from the WRAP Schedule of Communication described in the Consultation and Coordination Framework, with important tribal consultation and coordination milestones added Submit final SIP/TIP to EPA Summer EPA consultation with tribes before acting on SIPs/TIPs Fall