Are they really Equal? VS CAMUS

Slides:



Advertisements
Similar presentations
Residential Gas – Honeywell Valve - Thermopile Powered Series 300/301
Advertisements

Trystar Generator Docking Stations & Portable Power Cable
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Fired And Unfired Pressure Vessels
HVAC523 Heat Sources.
Trane Voyager™ rooftop units
VF™ Series Boiler.
Pre Sales Dept. HERCULES Solar 26 1 A Condensing floor-standing boilers with built-in solar circuit.
Customer Service – International dept. STAR 24 3 E.
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
“Enerpak” Units » Propeller Type Fan » Size 100 – 400 MBH » 80% Thermal Efficiency » Natural or LP Gas » 10 Year Warranty on Heat Exchanger, Burners,
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
AC-SSC-1 Installation and operation manual
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
TG-EL-D5 Preferred Instruments Multi-Tank Gauge D5 Overview.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Heating Control Devices
1 Direct Fired Gas Heating Presented by Jim Jagers of Applied Air.
Introduction to the BRYAN 1. 2 Quality Construction Features Standard Operating Parameters ­Maximum Boiler Design Pressure  All Models – 160 Psig ­Maximum.
Futera III Wiring Diagram Presentation G.
Engineered Products Make-Up Air for Heating and Cooling.
S8910U1000 Universal Electronic Ignition Modules Training Module
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
Engineer Presentation
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Hydrotherm’s NEW KN Series
Pioneer Church Solon, Ohio
Westbrook Apartments BOILER REPLACEMENT ASSESSMENT AND PROPOSAL AUGUST 2007.
AccuMax Multi-Point Injection Mechanics
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Charleston Towers West Virginia BOILER REPLACEMENT ASSESSMENT AND PROPOSAL AUGUST 2007.
HYDRONIC HEATING AQUASTATS
Mestek History Founded in Westfield, MA in 1946 as Sterling Radiator by John E. Reed 4 employees in a rented garage Produced only hydronic finned-tube.
Clearing the Air about the Hydrotherm KN Boiler
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
BOILERS WATER HEATERS POOL HEATERS. RBI Futera III Modulation.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
Baldwin Wallace College (Berea, Ohio). Two KN20 boilers installed to replace old atmospheric cast iron boilers. KN boilers are true cast iron sectional.
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
CUE – Make Any Pump an E-Pump
World Leaders in Combustion Management Solutions New Product Developments Autoflame Sales Meeting 2011 New Product Developments.
Burner Pull 69” 30” 92” 30” 4000 MBH Really Equal? Min. Gas Pressure –RBI – 4” WC –Them – 11” WC Ignition –RBI – TurboPilot –Them – Hot surface ign Flame.
Service Section Technical Training December 2005.
World Leaders in Combustion Management Solutions End User Guide Lockout Codes Pressure Sensors Error Codes Flame Safeguard UV.
4.0 Equipment Installation Aspects (Section 4.5 On-Rate for Fuel-Fired Equipment)
We apply 120 VAC to the HM Unit (Remember to check polarity!) Our primary step down T/X provides power to terminal “X” and “COM” on the ignition control.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
Central Processing Unit 0500 with ECO
WSHP Systems 1.
Exhaust Heat Recovery Systems
Unit 7 Gas Heat: Natural and LP
Introducing the Bradford White ICON System™ and Accessory Packages
Presented By: Jim Lombardo Herbert & Conway, Inc.
Heat-Timer Control Options
Roof Top Unit Overview (MAGNUM)
XP PLUS Intro High Efficiency Circulating Water Heater
S8910U1000 Universal Electronic Ignition Modules Training Module
Universal Interrupted Electronic Oil Primary R7184U Training Module
Presented by Mike Zacharias
Presentation transcript:

Are they really Equal? VS CAMUS It can be a little grey if you don’t have all the information. RBI has worked hard to develop a worry free INDUSTRIAL boiler design. Are you’re equals truly keeping up?

On the ‘outside’ it would seem so: CAMUS DYNAFLAME RBI FUTERA FUSION COPPER FIN DESIGN DOWN-FIRED CONCEPT FULL MODULATION STAINLESS STEEL CABINETS EFFICIENCY FROM 88% TO 92% PLUS MANTLE TYPE BURNER SMALL ‘FOOTPRINT’

A closer look though…. RBI FUTERA FUSION CAMUS DYNAFLAME THE IGNITION SYSTEM: The ignition system shall be a commercial / industrial design utilizing an interrupted spark ignition system independent of the main burner. The system shall provide UV flame monitoring (sensor eye) with 100% shut off upon failure during the trial for ignition period. The use of glow coil ignition systems shall not be permitted. CAMUS DYNAFLAME

A closer look though…. RBI FUTERA FUSION CAMUS DYNAFLAME Flame safeguard Control: The boiler shall be equipped with a Honeywell RM7800 series commercial / industrial flame safeguard system independent of the boiler sequencing controls. The flame safeguard shall be a solid state digital diagnostic control with a removable display screen. Control shall monitor run hours, faults, fault timing, and keep a minimum of the last 5 faults in history. Control shall continually monitor and display boiler status, and flame signal on a multi line LCD screen. RBI FUTERA FUSION CAMUS DYNAFLAME

Complete Management ‘system’ on board! Modulation and Reset: The boiler shall be fully equipped with boiler management controls equal to HeatNet (A Mestek Company). Controls shall… networkable Outdoor reset, stand alone, network, 4-10ma or 0-10vdc signal acceptable Operate multiple boiler modulation on the highest efficiency curve (intercommunication required) Not third party Log running errors and conditions continually. Firmware updateable through USB port and internet download. Communicate LonWorks, BacNet, and Modbus. Basic Tekmar single boiler modulation is not acceptable. Have hybrid technology to control various volume and efficiency type boilers. RBI FUTERA FUSION CAMUS DYNAFLAME Not equal. No network. Simple Tekmar control cut into panel. Third party control, limited input. No point reporting outputs. Complete Management ‘system’ on board!

RBI FUTERA FUSION Monitor Safeties Analog Inputs Digital Input Separating RBI as an Equal is critical if these items are important to you! Monitor Safeties Analog Inputs RBI FUTERA FUSION Digital Input VFD Signal Heat Net Link Hand Shake Relay Outputs Control Inputs

RBI FUTERA FUSION Domestic Hot Water Priority Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSION Mestek Made – Mestek Supported Manufactured in Westfield, MA Domestic Hot Water Priority On board HeatNet and Modbus connections Low Fire Hold Switch ‘U’ Shaped Socket for direct mounted protocessor module Support for Dual Fuel Option Flash Drive Updateable Control Pro Compatible Set point signal control (reduce points and external requirements). On board outdoor reset and night set back. Digital or Analog Local AND system pump coordination control. Combustion air damper Sequencing. Multi-boiler efficiency maximization.

RBI FUTERA FUSION SET POINT CONTROL OPTIONS INCLUDE: Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSION Mestek Made – Mestek Supported Manufactured in Westfield, MA SET POINT CONTROL OPTIONS INCLUDE: Boiler to Boiler Communication – Heat Net Multiple Heat Bands Add Boiler Delay Timing Shed Boiler Delay Timing Adaptive Modulation – prevents short cycling Modulate Delay Time (Low Fire Hold) Mod Max – ‘till last boiler fire’ Promote True Rotation (Sequencing) CONDITION MEMORIZATION BMS full integration

Separating RBI as an Equal is critical if these items are important to you! RBI FUTERA FUSION Min/Max VFD – Load Match (low fire); Input Adjustment (Elevation, Direct Vent) Log Entry – Troubleshoot and Diagnostic Tool Records major activity Monitor Min Return Temp Heat Exchanger Delta T (Limits to half fire) Fail Safe Mode – Member Boilers First Boiler mode – Set up to optimize proper Venting Min Boiler Off Time

Camus THIRD PARTY, NOT SELF MANUFACTURED NOR SELF SUPPORTED. Separating RBI as an Equal is critical if these items are important to you! Camus THIRD PARTY, NOT SELF MANUFACTURED NOR SELF SUPPORTED. BOILER TO BOILER CANNOT MAXIMIZE MODULATION EFFICIENCY DOES NOT COMPLETELY INTEGRATE WITH BMS. VERY LIMITED INPUT/OUTPUT ABILITY. SIMILAR CONTROL USED ON OUR BASIC 85% HORIZONTAL DOMINATOR BOILER (APPRX. 50% OF THE COST OF A FUSION.) LONWORKS AND BACNET VERY DIFFICULT TO APPLY, CONDITION, WIRE AND INTEGRATE.

Still thinking “equal”? CAMUS DYNAFLAME RBI FUTERA FUSION

CONSTRUCTION - RBI FUTERA FUSION Condensing “Package”: The boiler shall be completely packaged and tested as a package by the factory. Boiler shall have the boiler ‘package’ listed and tested as per UL/CSA and ASME section IV standards. Each boiler shall be fire-tested as a package in the factory prior to shipment. Test report shall show all combustion settings at various points of modulation, as well as corresponding delta T. A single primary pump shall be supplied, sized, piped and wired within the manufacturers control sequence by the manufacturer. A three way tempering valve shall be piped and wired to allow for return temperatures as low as 40F directly to a single water inlet. The use of independent secondary heat exchangers and/or economizers will not be permitted.

CONSTRUCTION & DESIGN - RBI FUTERA FUSION Fully packaged, means : Three way bypass valve keeps the primary heat exchanger at the required 140F (copper). Flow Switch (ILO LWCO) Primary pump sized for both the primary/secondary hX. ASME relief valve for ‘both’ primary/secondary HX. Approved T & P gauge. Vessel drain valves as required by OHIO code. “all factory provided, mounted, wired, and tested”

CONSTRUCTION & DESIGN - RBI FUTERA FUSION Non-electric bypass valve set and mounted. All stainless steel jackets (no plastic tops) Single System inlet/outlet Single Primary pump mounted and wired Complete ‘quick latch’ access to all heat exchangers. HeatNet on board and ready to go Pallet jack fork lift ready!

CONSTRUCTION & DESIGN – Dynaflame Camus Can one boiler be everything to everybody? You do the math.. Stack Economizer Dynaflame Modulation Non-Condensing boiler Dynaflame Fully condensing boiler

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! All the ‘packaged’ items on the RBI already handle that so the boiler can be put in, and simply hooked up!

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! Rbi includes the non-electric thermostatic valve in their design.

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! Does this sound like a true condensing design? Let’s see Non-condensing can return 115F but condensing 130F?????

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! Absolutely untrue. We represent Cat. II and IV boilers that have NO minimum and some that have a 60F limit. It’s about design, not ‘official’ listing!

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! So, they give us the CHRM separate and ‘we’ have to protect it (flow and temp), shed the load with it, monitor temperatures and be responsible for any misapplication? Again, not a ‘packaged’ condensing boiler!

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! Finally, a drawing! Of course, this is typical.. Since you have to design and pipe it, I guess you can do it however you want. Bottom line is, you need to pipe both HX, and control the primary temperature. If you don’t.. Warranty is void!

CONSTRUCTION & DESIGN – Dynaflame Camus Experience Knows Better!

CONSTRUCTION & DESIGN – Dynaflame Camus Step one: Read the manual! Secondary HX in vent. add the flow switch, valves, and a second pump. Be sure to get the GPM from this HX and size the pump for it. Also add temp controls and sequencing. Below 140F, you better use a three way bypass system. Of course you need to design it and have it installed. Primary HX separate. Don’t forget 140F, 130F, 120F, or 115F… not sure which they really want but it’s up to you to keep it warm! Oh, and another primary pump!

Still thinking “equal”? CAMUS DYNAFLAME RBI FUTERA FUSION

So far we have some serious cost differences making your equal a ‘sure bet’! CAMUS DYNAFLAME RBI FUTERA FUSION Honeywell RM7800 series with screen vs Fenwell control: Three way thermostatic bypass valve installed and designed: Heat net management vs. Tekmar Primary pump installed, sized, wired and controlled. Turbo pilot with UV scanner, ignition transformer vs. glow coil. Access panels with quick release latches: If you are the contractor, you have no choice! $1000.00 cost $1148.00 cost $ 760.00 cost $1378.00 cost $ 496.00 cost $ 297.00 cost $5079.00 additional cost per boiler

Still, you’ll find some of the math won’t add up. Why? CAMUS DYNAFLAME RBI FUTERA FUSION Still, you’ll find some of the math won’t add up. Why? Well, there will be a realization that all the equal products are far more expensive. Camus then had a ‘cap’ to bid up to. This is the result of the last 2000MBH condensing boiler design we bid vs Camus: $39.800.00 For two boilers including freight, start up, they did NOT include factory labor warranty. $46.500.00 For two boilers including freight, start up, warranty labor. NOTE THAT ‘COSTS’ ARE CALCULATED BEFORE ANY MARGINS REQUIRED BY THE REP, DISTRIBUTOR, OR WHOLESALER.

CAMUS DYNAFLAME RBI FUTERA FUSION On the ‘outside’ the contractor seemed to have saved $6,700.00. Had he not used this price on bid day, he could have lost the project. That’s only $3,350.00 per boiler. Problem is, the END USER sacraficed $5,079.00 per boiler in equipment, trim and features or a total of $10,158.00 over all. Was the investment wise? Additionally, chances are the contractor was not aware he had additional cost in piping, pumping, design work, trim and safety controls. That closes the gap very quickly. If the contractor didn’t know it, as an engineer you must know it because these items can easily slip by the submittal if you are not careful. The end user actually suffers from the very competition we think is healthy!

B: Lochinvar Intellifin RBI FUTERA FUSION The ‘real’ Equals “The basis of design shall be the RBI Fusion series packaged condensing boiler. Sizes, quantities and capacities as listed on the drawings. Acceptable equal manufacturers shall still meet the performance and intent of this specification completely. Installation must completed in accordance to the requirements of the manufacturer. Any additional cost incurred by using one of the following approved manufacturers shall be that of the installing contractor. This includes, but is not limited to venting, piping, electrical, and/or any needed as built drawings. In accordance with the above, you may provide a product equal to the requirements of this specification as manufactured by:” A: Aerco Benchmark B: Lochinvar Intellifin C: Laars Rihos

RBI FUTERA FUSION The ‘real’ Equals Allowing the Camus Dynaflame to be an acceptable equal to a packaged condensing boiler opens the door for the following: Any copper boiler manufacturer should be permitted to provide his ‘base’ boiler design with a separately shipped stack economizer. Base boilers should be allowed a light commercial residential flame safeguard and ignition system. Any form of boiler controls become acceptable because of the limitations of this equal product.