POWER EQUIPMENT INSTRUCTOR: ROBERT A. MCLAUGHLIN ZAILI THEO ZHAO

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Vorlesung Informatik 2 Algorithmen und Datenstrukturen (Parallel Algorithms) Robin Pomplun.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
Unit C: Agricultural Power Systems
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Disassemble, Assemble and Perform a Function Check on the M249
USING THE OXYACETYLENE CUTTING TORCH
Fire Protection Systems
1. 2 Earthquake effects on health care facilities 2.
PP Test Review Sections 6-1 to 6-6
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Preventing Equipment Failures
Boiler Operation Procedures
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Boilers Dept. of Mech & Mfg. Engg..
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Jim Haywood (Product Manager for Statutory Returns) Adopted from Care - Spring Release 2014.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Chapter Six Study Guide.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
10/12/ Vacuum Regulator Gas Feed Systems: Theory and Maintenance Thom DiGeronimo OperatorSchool.Com.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Automotive Technology
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
How to create Magic Squares
Watertube Boiler.
Boiler Mountings.
Hydronic Mechanical Controls
3. Boiler Mountings Rajan Bhandari.
Presentation transcript:

POWER EQUIPMENT INSTRUCTOR: ROBERT A. MCLAUGHLIN ZAILI THEO ZHAO 12:36 POWER EQUIPMENT INSTRUCTOR: ROBERT A. MCLAUGHLIN ZAILI THEO ZHAO HIGH PRESSURE FITTINGS WEEK 13

Learning Objectives A boiler and pressure vessel. 12:36 A boiler and pressure vessel. A level 1 boiler and a critical pressure boiler. The various pressure fittings used on boilers. The types of safety valves on boilers. The components of a boiler gauge glass. The proper procedures for removing a boilers gauge glass from service, disassembly of the gauge, inspection and replacement and rebuild of a typical gauge glass.

Boiler 12:36 A steam boiler is a closed pressure vessel in which water is heated to generate saturated steam. The water is heated by the gasses of combustion. A pressure vessel that produces hot water heated by the gasses of combustion is also a boiler.

Boiler - classification 12:36 Boilers can be divided into two pressure related categories: Low pressure – boilers operating at 15 psi and below. High pressure – boilers operating above 15 psi.

Boilers can also be categorized into Level ratings. 12:36 Boilers can also be categorized into Level ratings. A Level 1 boiler is When the temperature and pressure of a boiler equals 1500 or more. All of the components of a level one boiler designed with a safety factor of 5 and are tested and given serial numbers.

WHAT IS THE FACTOR OF SAFETY? 12:36 Ultimate strength divided by allowable working stress or bursting pressure divided by safe working pressure. It can vary between four and seven depending on age, type of construction, and condition. Use five for most calculations

Critical pressure Many boilers operate at pressures 1000 to 3000 psi. 12:36 Many boilers operate at pressures 1000 to 3000 psi. Some operate at critical pressure – 3206 psi and 705.08oF Critical pressure is the pressure at which steam and water at the same density. All critical pressure boilers must have separate a pump to create circulation.

External fittings and connections 12:36 Drains All steam and water sections must have these. The superheater will have drains. The drums and headers will have drains.

External fittings and connections 12:36 Vent high pressure globe valve at high point in the boiler used when filling and emptying the boiler.

External fittings and connections 12:36 Sample connections used for taking boiler water samples. Drains, vents, and sampling connections will all have high pressure rated globe valves attached to the connection.

External fittings and connections 12:36 Feed stop and check valves to manually regulate the flow of water to the drum.

External fittings and connections 12:36 Steam stop valves located at the superheater and desuperheater outlets. Used to cut the boiler in or out of the main steam line.

External fittings and connections 12:36 Safety valve two types (huddling chamber and nozzle reaction type). They are not relief valves. Question What is the difference between the safety and relief valves?

External fittings and connections 12:36 Soot blower Fixed and retractable

Internal fittings 12:36

12:36

External fittings and connections 12:36 Water gage glass – attached directly to the drum, they allow the operator to see the water level in the drum. All boilers operating over 400 psi are required to have two independent means of determining water level. One will be a gauge glass attached directly to the steam drum; one will be a remote water level indicator.

External fittings and connections 12:36 Temperature and pressure gauges Superheated steam flow indicators

the operator control the safe operation of the boilers. 12:36

Gauge Glass Two independent means of indication 12:36 Two independent means of indication These can consist of two gauge glasses attached to the drum, or a single gauge glass, and a remote water level indicator. A gauge is located so that: the lowest visible part of the glass is 2” above the lowest permissible drum water level the upper most visible part of the glass is located 2” below the upper most

Gauge Glass 12:36 Boilers operating at pressures below 250 psi can be fitted with tubular type gauge glasses Above 250psi, flat type gauge glasses are required. Isolation valves are required on each leg of the gauge glass

Gauge Glass 12:36 There are high pressure glass type indicators that can be used instead of flat gauge glasses, for example, bicolor gauge glasses. Figure gauge glasses work on the principle of light refraction

Gauge Glass 12:36 Every gauge glass will have valves to isolate the gauge from the drum pressure for maintenance and emergency situations. The isolation valves are usually of the quick closing type, capable of being closed with ¼ turn of the handles. The handles will be connected by chain pulls so that an operator can pull on the chain and close both valves at the same time from a remote location. The bottom isolation valve will always be fitted with a ball check device to prevent hot water from flowing through a broken gauge glass.

Gauge Glass 12:36 Each gauge glass assemble will be fitted with a blowdown connection to: Insure that the connections between the drum and gauge do not become clogged. To help the operator tell the level in the glass. If you are in doubt of the level in the glass, blow the glass down (open the gauge drain valve). If you blow a glass down, and you see the water level go up through the glass, then the drum level is high. If no level appears, then the level is high.

Gauge Glass 12:36 Leaks above the actual water level will indicate higher than normal levels. Leaks below the actual level will indicate lower than normal levels.

Gauge Glass To blow a glass down for normal maintenance: 12:36 To blow a glass down for normal maintenance: Disconnect the pull chains Close the top valve and open the drain valve (blowdown valve). Let it drain for a few seconds. Open the top isolation valve and close the bottom isolation valve. Leave the drain open for a few more seconds. Close the drain valve. Open the bottom isolation valve and reattach the chains.

Flat type of Gauge glass construction 12:36 BODY FLAT GUAGE GLASS MICA SHEET ASBESTOS GASKETS ASBESTOS CUSHIONS COVERPLATES STUDS NUTS 

Gauge Glasses and Try Cocks 12:36 Both the water column and gauge glass must blowdown daily Prevent sludge accumulations from blocking lines Observe the level when it is blown. When the valve is opened, the water should drop out of the glass rapidly. When the valve is closed, it should return rapidly to its previous level. If the glass water drains slowly This is an indication of clogging up. The situation must be corrected as quickly as possible, even if the coiler has to be shut down.

There is one adjustment on the muddling chamber type safety valve 12:36 There is one adjustment on the muddling chamber type safety valve Adjusting ring Question Who can adjust the boiler safety setting pressure?

There are two adjustments 12:36 There are two adjustments Adjusting ring Nozzle ring Question How to increase the blowdown pressure?

The wires for remote releasing safety valve 12:36

Gate valve rise stem 12:36

Globe valve 12:36

Swing check valve 12:36

Ball valve 12:36

Butterfly valve 12:36

Marine boiler example what are these fittings? 12:36 1 - Gauge Glass or Water Column 2 - Main Steam, Safety, Auxilary Steam Valves 3 - Pressure Gauge 4 - Surface Blow 5 - Skin Valve (through ship's side) 6 - Bottom Blow 7 - Hydrokineter (to increase water circulation) 8 – Furnaces 9 - Fire-Tube bundles 10 - Main Feed Valve 11 - Auxiliary Feed Valve 12 - Deep Blue sea

12:36

12:36 THANK YOU