A Brief History 1889 – District energy comes to Philadelphia

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

Text Chiller Plant Optimization that Reduces Energy Consumption 20-50%
Approximate efficiency of an average coal-fired power plant
Jubail Industrial City A $45 Billion Super Project
ABENGOA SOLAR Solar Power for a Sustainable World Past, Present, and Future of Solar Thermal Generation Bruce Kelly Abengoa Solar, Incorporated Berkeley,
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
1 Providers Perspective on the Future Bill Levis President, PSEG Power Bill Levis President, PSEG Power.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Introduction to Sustainable Solutions
Technologies 1 CHP (VA Dallas Case Study). Proprietary Information Of Energy 2013 Dallas VA Medical Center A CHP Case Study Design Build Delivery of a.
Facilities: A Sampling of Sustainability Efforts Guaranteed Energy Savings Agreement (GESA) Geothermal LEED Building Construction Natural Gas Vehicles.
University Space Priorities Working Group Status Update University Senate November 7, 2013.
Energy-Efficient Process Cooling
Federal Reserve Bank of Boston Case Study
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
EDISON INTERNATIONAL® SM October 2012 Project Management Technical Services Customer Generation Team SCAP Energy Management Committee Meeting October 23,
1 1 BASICS OF ENERGY MANAGEMENT Section A - Energy Basics.
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
Power Plant Construction and QA/QC Section 2.3– Steam Generators
A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
HVAC 11a CNST 305 Environmental Systems 1 Dr. Berryman
Buckeye Wood Energy Converting Waste Wood Into Energy.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Montpelier District Energy Gwendolyn Hallsmith, Director Planning and Community Development City of Montpelier, Vermont.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
ACTIVE LEARNING PROCESS
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
Energy Security Federal Research Center at White Oak, Silver Spring, MD January 16, 2013.
Use of renewable energy in the Provinces of Treviso headquarters Maurizio Tufaro Treviso Paving the way for self – sufficient regional Energy supply based.
North American Mechanical Inc. School District of Cambridge A Business Relationship Presentation Use our energy to save yours®
COMBUSTION CONTROL IN BOILERS 1 Dept. of Electronics & Instrumentation, Narayana Engineering College, Nellore.
Energy Information System for Kodak Park Utilizing a Large PI Server and SAP iViews Stephen OKeefe & James Breeze Eastman Kodak.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
CREA Energy Innovations Summit Coal Mine Methane Electric Power Generation 1 Julian Huzyk Project Manager Vessels Coal Gas, Inc. 3MW LLC & North Fork Energy.
Gas Distribution Inc INC. Worlds largest liquids pipeline delivering more than 2,000,000 barrels of crude oil /day Inc Corporate Social Responsibility.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
First Solar FuelSmart™: Powering Energy Security
ENERGY SURVEYING Please Click through this presentation.
Equal or Not. Equal or Not
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Sustainability in the Finger Lakes Geothermal at Hunt Country Vineyards.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Franklin County Technical School Performance Contract Project.
Generating electricity from natural gas: The way forward for Nigeria A presentation by: NNPC FSTP Class E, study group 3.
COGENERATION Allison M. Selk 12/8/04 CBE 562.
GPAEE November 20, 2014 Combined Heat and Power Overview & CHP Technical Assistance Bill Valentine DOE Mid Atlantic CHP Technical Assistance Partnership.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Central PA Chapter: Association of Energy Engineers Americas Operation Services: CCHP Presentation & Tour March 26, 2015 Doug Ferguson.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
Cogeneration at UC March 09, Welcome Central Utility Plant.
Caspian Company مجری پروژه های نیروگاهی ، احداث مولد های مقیاس کوچک و سیستم های CCHP & CHP ohen staufen ring-20- koln – germany.
UMCP Learning Objectives
Presentation on Cogeneration and District Cooling Plant
campus carbon footprint
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Energy Conservation CERD /12/2017
Presentation transcript:

A Brief History 1889 – District energy comes to Philadelphia April 1, 2017 1889 – District energy comes to Philadelphia 1903 - Electricity is first generated at Schuylkill Station 1938 - Boiler #23 and #24 were installed. 1972 - Boiler #26 was installed 1987 - Philadelphia district energy system purchased from investor owned utility 1993 – Trigen Energy acquires assets of United Thermal Corporation 1992 – PPA & Steam purchase agreements executed for Grays Ferry Cogeneration Partnership 1996 – GFCP financing closes 1998 - Grays Ferry Cogeneration Project commences commercial operation

A Brief History April 1, 2017 2005 – Thermal North America Inc. acquires assets of The Trigen Companies 2005 – Energy Services Agreement executed for new Chilled Water Plant at Edison Station for benefit of Thomas Jefferson University 2007 – Edison Chilled Water Plant commences commercial operation 2007 – Veolia Energy North America acquires assets of Thermal North America Inc.

Veolia Energy’s Operations in Philadelphia

Veolia Energy’s Philadelphia Operations Veolia Energy owns and operates two district energy systems in the City of Philadelphia: Steam System serving Center City and West Philadelphia Edison Station Central Chilled Water Plant

Veolia Energy’s Philadelphia Steam System

Veolia Energy’s Philadelphia System (Cont’d) Approximately 300 Customers Serve approximately 500+ buildings representing 100 million square feet of commercial, institutional, residential and governmental buildings Two steam generation plants Schuylkill Station and Edison Station Total steam capacity of approximately 2.6 million pounds per hour Cogeneration Plant - Grays Ferry Cogeneration Plant 170-megawatts Total steam capacity of 1.4 million pounds per hour Fuel diversity to customers, using natural gas, #6 fuel oil, and purchased steam from cogeneration plant 30 miles of steam distribution piping 470 manholes Two steam pressures – 165 psig and 205 psig

Schuylkill Station #23 and #24 Boilers 800 MMbtu (235 MWth) # 6 Oil fired Circa 1939 #26 Boiler 760 MMbtu (225 MWth) Natural Gas & # 6 Oil fired Circa 1972

Edison Station #1 and #2 Boilers 200 MMbtu (60 MWth) # 6 Oil fired Circa 1957 #3 and #4 Boilers 250 MMbtu (75 MWth) Circa 1963

Grays Ferry Cogeneration Project Westinghouse 501D5A combustion turbine Excellent match for steam load MHI controlled extraction / induction / condensing steam turbine generator Nooter / Eriksen heat recovery steam generator Cerrey auxiliary boiler-dual fueled boiler-nominal capacity of 500,000 lbs/hr

Edison Station Central Chilled Water System Four (4) 1,750 dual compressor McQuay Electric Centrifugal Chillers Four (4) custom cooling towers to match chiller capacity New controls, new chilled water pumps, new condenser water pumps, new electric switchgear Approximately 2,000 feet distribution system

TJU Campus Aerial View with CHW Service

Customer Profile More than 300 Customers Served 500+ buildings, approx. 100 million square feet 3.6 million Mlbs sales annually

Recent Veolia Philadelphia Customer Additions Comcast Center 1.2 million square foot Class A commercial office building First LEED certified high rise in country Utilizes steam for radiant heating, domestic hot water, cooking, snow melting, and as part of hybrid cooling plant (1,000 ton absorption chiller with two electric centrifugal chillers) 20 year agreement Residences at the Ritz-Carlton 628,000 square foot, 46-story, 289 condominiums Steam for heating and domestic hot water Symphony House Condominiums 642,000 square foot, 31-story condominium building 400 seat theater (Philadelphia Theater Company) Murano Condominium 440,000 square foot, 42-story, 302 condominiums

Future Growth, Expansion and New Equipment Continued investment in expansion of steam infrastructure to serve new construction/conversion from other energy sources Chilled water plant-potential expansion to serve new buildings on TJU campus (3,000 to 8,000 tons additional-850,000 sf of space) Talking with current customers about potential sustainable energy projects such as bio-fueled plant using municipal waste and renewable fuels (wood waste) to generate electricity and steam

Future Growth, Expansion and New Equipment (Cont’d) Offering of services “beyond the meter”. Recognized as energy experts, natural transition is to provide services on customer equipment ranging from mechanical repairs, steam trap surveys and repair/replacements, operations and maintenance contracts, recycling, etc. Provide an array of services across the spectrum of purchasing/managing energy commodity, operations and maintenance of major energy producing equipment, assisting customers manage their energy operations and efficiency, and providing the services to allow customers to focus on their core business.

Veolia Energy North America Questions?