GHG PSD Applicability Exercise. GHG PSD Applicability Exercise - Part 1 Hard Rock, LLC is a manufacturing facility with the following sources of GHGs:

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Cleaner Air Set-Asides (CASA) February 14, 2006 DRAFT Illinois Environmental Protection Agency / Bureau of Air.
New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
NETTING Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013 NETTING.
1 To enable you to view this presentation at your own pace, we created it for manual viewing: To advance these slides, click your mouse or use the forward.
New Source Review (NSR) Program Basics
Heat Recovery Solutions From Fintube Technologies, Inc Date: October, 2008 © United States Steel Corporation.
Healthcare and Air Quality H2E Conference - Dec 6, 2007 K-State Pollution Prevention Institute Ryan Hamel.
GHG Best Performance Standards San Joaquin Valley APCD ASHRAE Meeting Daniel Barber, Ph.D. Dennis Roberts, P.E. November 3, 2011.
Delivering sustainable solutions in a more competitive world Proposed Area and Major Source Boiler NESHAP Overview David Dunn Environmental Resources Management.
Clean Air Act New Source Review (NSR) and Prevention of Significant Deterioration (PSD) Construction Permits Clean Air Program Manager USAG Environmental.
Richard (Rick) Goertz, P. E
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
Revised Draft1 Distributed Generation Interconnections - Group Study Process Option: Voluntary Rolling Window Presented to Massachusetts Distributed.
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
PSD/NNSR Applicability Examples
1 EPRI Funded RGGI Modeling Runs Investigating the Impact of Nuclear Power Plant License Renewal September, 2005 Modeling performed by ICF Consulting for.
1 Year in Review: Climate Change Presented by: Tom Wood Stoel Rives LLP October 8, 2010 EPA Heats Things Up.
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
GHG Applicability Criteria. Introduction to PSD GHG Applicability As stated earlier, Tailoring Rule does not change basic applicability process Incorporation.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2014.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Clean Air Act Section 111(d) Indiana Energy Association September 11, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental Management.
NACAA Permitting Workshop, Chicago June 14, 2011 Raj Rao, NSR Group Leader OAQPS, EPA GHG Permitting – Regulatory Update.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group #13 August 26, 2009 SCAQMD Diamond Bar, California.
Pinal County Air Quality Workshop Casa Grande – January 14, 2014 Kale Walch & Anu Jain – Permit Engineers.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Transitional PSD Applicability Scenarios July 20, 2010 Jay Hofmann President trinityconsultants.com Troutman Sanders/Trinity Consultants PSD and Title.
Environmental Quality Service Council Mint Distilling Operations August 30, 2011 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of.
Since May 2013 Select Clean Air Act Cases. U.S. v. Homer City U.S. v. Midwest Generation, LLC U.S. v. United States Steel CAA Enforcement Cases.
NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Energy Efficiency Plans: Supplemental Information on Performance Incentive Mechanisms Council Consultants MA EEAC Meeting September 11, 2012.
Did the recession impact recent decreases in observed sulfate concentrations? Shao-Hang Chu, US EPA/OAQPS/AQAD October, 2011.
Greenhouse Gas (GHG) Permit Training Region 4 – Atlanta, GA Dec , 2010.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
PRIVILEGED & CONFIDENTIAL Reciprocating Internal Combustion Engine (RICE) Regulatory Update American Public Power Association June 8, 2010.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Clean Air Act Section 111(d) Indiana State Bar Association Utility Law Section September 4, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department.
PREVENTION OF SIGNIFICANT DETERIORATION (PSD) NSR PROGRAM Donald Law U.S. EPA Region 8.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Overview of Air Permitting Fees In Illinois
Greenhouse Gas (GHG) Permit Training PSD Applicability Example Landfill Applicability Examples John Calcagni, EPA Region 4.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
REGULATIONS & LEGISLATION BIG TEN ENVIRONMENTAL STEWARDSHIP GROUP STEVE MARUSZEWSKI – PENN STATE Greenhouse Gases.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Fred P. Osman, P.E. Osman Environmental Solutions Harrisburg, PA April 21, 2011.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
T172 Tutorial 2. Maths Day school for Technology Students Saturday 27 March Regional Centre, Manchester (Details to be sent in post) The day school clashes.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 Public Workshop to Discuss Amendments to the AB 2588 “Hot Spots” Emission Inventory Criteria and Guidelines Regulation California Air Resources Board.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
MPCA Citizens’ Board Meeting: United States Steel Corporation-Keetac Air Emissions Permit Owen Seltz Industrial Division September 13, 2011.
PSD Background Presentation
What is the Boiler NESHAP?
Boiler Sheltered Initiative
Enforcing the NAAQS Case Study Sean Taylor
Kansas Air Quality Seminar March 5, 2008
Presentation transcript:

GHG PSD Applicability Exercise

GHG PSD Applicability Exercise - Part 1 Hard Rock, LLC is a manufacturing facility with the following sources of GHGs: boilers, emergency generators, space heaters, process heaters and thermal oxidizers. Assume the permitting of the proposed modification will be completed after July 1, 2011 and commencement of construction for the proposed modification is August 1, Further, the facilitys current GHG emissions are in excess of 100,000 tpy CO 2 e. Also assume there are no debottlenecking issues associated with the pending modification. Because the dominant component of the GHGs is CO 2, it is reasonable to assume that CO 2 e limits rather than mass-based limits will be controlling. Therefore, this example only deals with CO 2 e emissions. DRAFT2

GHG PSD Applicability Exercise - Part 1 (contd) Hard Rocks modification includes the addition of a new gas-fired boiler with distillate oil back up. Hard Rock proposes to limit backup fuel use to 500 hr/yr or less. Hard Rock is also adding two new diesel- fired emergency generators with their use limited to 500 hours per year. Hard Rock is removing from service a coal-fired stoker boiler. The CO 2 e emissions at the new units are as follows: DRAFT3 UnitHourly Emissions Yearly hrs/yr Yearly 8,260 hrs/yr Yearly 500 hr/yr Boiler on nat. gas 24 TPH210,240 TPY198,240 TPY12,000 TPY Boiler on distillate 33.5 TPH293,460 TPY276,710 TPY16,750 TPY EmGen 116 TPH140,160 TPY132,160 TPY8,000 TPY EmGen 28 TPH70,080 TPY66,080 TPY4,000 TPY

GHG PSD Applicability Exercise - Part 1 (contd) As part of this project, Hard Rock will shut down a stoker boiler, with a maximum capacity of 300 MMBtu/hr and a maximum operating schedule of 24 hr/day, 365 days/yr. In looking back over the last ten years, this boiler operated, on average, 320 days over the two years with the highest usage, at an average rate of 195 MMBtu/hr. The boiler has the following emission rate: DRAFT4 UnitHourly 300 MMBtu/hr Yearly 8,760 hrs/yr Hourly 195 MMBtu/hr Yearly 7,680 hr/yr Stoker Boiler30.8 TPH269,800 TPY20.03 TPH153,830 TPY

GHG PSD Applicability Exercise - Part 1 (contd) Hard Rock believes that PSD review for GHGs is not required for this project since the emissions reductions caused by the shutdown of the stoker boiler will mean that the project has an increase in CO 2 e that is below the significance level. What is your assessment? What other information may be needed? DRAFT5

Math for Part 1 of the Hard Rock Example Unit GHG Emissions (TPY of CO2e) New Boiler – gas use198,240 New Boiler – distillate use16,750 EmGen 18,000 EmGen 24,000 Project Total Prior to Netting226,990 DRAFT6

Key Points of Part 1 of the Hard Rock Example Choose the worst-case scenario. In this case, firing distillate for up to 500 hours per year increases emissions over the level when firing gas only, so the assessment must include 500 hours of distillate use and 8260 hours of gas use. Sum the emissions of units with increases only in the first step. Do not count decreases from emission units until the contemporaneous netting is done. If not provided by the applicant, request information on ALL the emission increases and decreases during the contemporaneous period before you start the netting calculation for those pollutants exceeding the significant emissions thresholds. DRAFT7

GHG PSD Applicability Exercise - Part 2 In response to your request for additional information, Hard Rock submits the following information on previous changes to the facility. Assume beginning of the contemporaneous period is 5 years before construction commences. Also, assume the previous changes have not been relied upon in the past for PSD permitting. DRAFT8 Recent Actual GHG Emissions (CO 2 e basis) Potential GHG Emissions (CO 2 e basis) Process Heater (shutdown July 2007) 17,500 TPY20,000 TPY RTO (shutdown September 2007) 2,550 TPY4,500 TPY Space Heaters in a New Building (added October 2007) 2,000 TPY5,000 TPY

GHG PSD Applicability Exercise - Part 2 (contd) Is Hard Rock subject to PSD for GHGs? DRAFT9

Math for the Hard Rock Example DRAFT10 Netting Analysis GHG Emissions (TPY of CO 2 e) Project Increase226,990 Stoker Boiler SD (Actual)-153,830 New Space Heaters (PTE)5,000 RTO SD (Actual)-2,550 Net Emissions Increase75,610

Changing the Outcome of the Applicability Determination If you determine that PSD applies for GHGs, what are the kinds of changes to the project that Hard Rock could propose that would eliminate PSD applicability to GHG? DRAFT11

Options to Eliminate PSD Applicability Eliminate or greatly reduce the use of distillate for back up with an enforceable limit Enforceable limits on the operating hours or fuel use and emissions of the new boiler Start construction earlier (to bring an earlier reduction into the contemporaneous period) DRAFT12

Key Points of Part 2 of the Hard Rock Example Use the actual emissions from the units being shutdown (as opposed to the potential emissions) when doing the netting calculation. Double-check the dates of all increases and decreases to ensure they are really contemporaneous (i.e., the shutdown of the process heaters in July of 2007 was not in the contemporaneous period and therefore could not be used in the netting calculation). Also confirm whether contemporaneous increases and decreases have been relied upon in a previous PSD permitting action DRAFT13

Key Points of Part 2 of the Hard Rock Example (contd) The permit applicant can take enforceable limit on the emissions of the new or modified units to drop below the significance level. In this case, the applicant could limit the hours of operation of the new boiler, its fuel-firing rate, the hours of distillate used, or a combination of all these actions to reduce the project emissions and successfully net out. DRAFT14