Genuine Reconciliation

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Are Monopolies Desirable?
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Chapter 6 Supply, Demand and Government Policies
Comments on “Has the Labour Share Declined? It Depends”
Rolling AQ – Initial Calculation
CUSC Panel – 19th July 2016 Binoy dharsi
UNC Modification Proposal 0202 National Grid Distribution
Modification Proposal 255 – LSP Objection Rates 2nd Sample Report
Options for Mod 640 Replacement
SSP/LSP and Market Sector Code
Rebecca Knight Mod 644 UIG Analysis.
Review Group 178 SSP as Domestic only.
Incentives 26 September 2018.
Modification th July 2008.
CSEPs Reconciliation Proposals
Rolling AQ Review Group 177.
Richard Fairholme Transmission Workstream, 2nd October 2008
Modification 0117 – Additional Considerations
Project Nexus Workgroup
Consideration of issues raised by UNC Modification Proposal 0244
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Modification 0333A – implementation info
Mod Proposal 0268 : AQ Backstop Date
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
AUG Query Responses 21st November 2013.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
UNC Transmission Workstream 15th June 2005
Project Nexus Workgroup
Modification proposal 330
Consideration of issues raised by UNC Modification Proposal 0244
Entry Overrun Calculation
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
Reconciliation Volume Impacts 25 January 2008
Review Group 208 / Development Modification Group 194
Commercial Arrangements For Gas Quality Service – Introduction
Nexus Workgroup Read Validation Scenarios
Transmission Workstream, 1 Mar 07
Modification Proposal 136
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
PN UNC Workgroup (AQ topic)
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Genuine Reconciliation Distribution Workstream 23rd October 2008

Background Modification Proposal 228 Raised on 8th October Contains element of ‘Genuine Reconciliation’ Reflects fact that LSP AQs are reducing at a faster rate than SSP AQs

AQ impact on reconciliation Initial Allocation of Gas is based on AQ values, scaled to match the total consumed. If AQs were all accurate then no reconciliation would take place If AQs are equally inaccurate then no reconciliation would take place If AQs in one market are more or less accurate than the other then reconciliation will occur.

Site by Site Reconciliation At a site level AQs will be higher or lower and this will always generate reconciliations. However, these reconciliations should ‘net-off’ if the aggregate AQ was correct in the first allocation.

Change between 06/07 and 07/08 Modification 0081 data shows that; LSP AQs reduced from 156.6TWh to 147.46TWh between the two gas years SSP AQs reduced from 553.7TWh to 527.5TWh during the same period Therefore LSP AQs are dropping at a faster rate

Methodology

Worked Example (27.956% - 28.283%) x 527.5 TWh = - 1.72 TWh.