P09045: Membrane Characteristic Test Stand

Slides:



Advertisements
Similar presentations
Ray Schroeder ET 493 Senior Design I Advisor: Dr. Cris Koutsougeras Spring Semester /5/2014.
Advertisements

Ray Schroeder ET 494 Senior Design II Advisor: Dr. Cris Koutsougeras Fall Semester /5/2014.
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
Christian Seemayer Rob Proetti Tim DeBellis Tim Giguere Will Kelly.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
Fiber Repositioning System NanoDrop December 11, 2006 Chris Czech Charles Dielmann Mark Howe Dana Kimpton Christopher Sherman.
P09311: Interface for Multi-Purpose Driver/Data Acquisition System Adam Van FleetProject Leader, EE DAQ Hardware Development David HoweElectrical Engineer.
Preliminary Design Review The Lone Rangers Brad Alcorn Tim Caldwell Mitch Duggan Kai Gelatt Josh Peifer Capstone – Spring 2007.
Senior Design: Validation of Design December 15, 2008.
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
P07007: Adapted Home Entry Sponsor: National Science Foundation Wenbo Chen Project Manager, EE Tanvir Rasel EE Meklet Kidane EE Faculty Mentors: Dr. Elizabeth.
Optical Stage Redesign Team 4025 Senior Design II – Spring
Full Load Design Review. Outline Original problem statement New problem statement Product specifications New design Features/Cost Benefits/Concerns.
Low Cost Fundus Camera P15590 December 11th, 2014
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
P /30/14 System Level Design Review Reciprocating Friction Tester Tuesday, September 30th, 2014.
Digital Microfluidics Control System II P15610 Complete Detailed Design.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Product Evaluation & Quality Improvement. Overview Objectives Background Materials Procedure Report Closing.
Mark Bradford Kevin Feeley Tony Martinelli Jeff Snyder Jacob Stephens.
Automated Bridge Scour Inspection FSU/FAMU College of Engineering Team 7 Proposal 10/27/2010.
Table of Contents Project Overview (brief explanation of leukodystrophy) Reviewed customer needs Reviewed engineering specs Detailed system lay out Mechanical.
CS-EE 481 Spring Swift-Fox Founder’s Day, 2005 University of Portland School of Engineering Imagine the ability to view and record Up to five different.
Ankle Positioning Device Faculty Advisors: Dr. Bawab & Dr. Ringleb Students: Vasile Grigorita, Dominick Hudson, Jin Hyuk Kim, Bryan Mazac, Christopher.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
Product Evaluation & Quality Improvement. Overview  Objectives  Background  Materials  Procedure  Report  Closing.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
P09311: FPGA Based Multi-Purpose Driver / Data Acquisition System Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Adam Van FleetEEProject Manager/Documentation.
EG1003: Introduction to Engineering and Design Product Evaluation & Quality Improvement.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Systems Level Demo P15010: Arc Wheelchair Swing. Maggie Bates BS/ME Industrial & Systems Engineering Owen Breese BS Mechanical Engineering Elizabeth Cutolo.
P15342 Linear RF Measurement System Kate Gunderson Matt Chauncey Will Tourtillotte.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Camera Motion System Requirement Design Details FEA.
P09045: Membrane Characterization Test Stand 7/5/2016 P09045: Membrane Characterization Test Stand 1 Detailed Customer Needs Customer Need #ImportanceDescriptionComments/Status.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
MOBILE CAMERA CONTROL SYSTEM. Team Members Ruth Ayalon – ME Ruth Ayalon – ME Erin Gillespie -ME Erin Gillespie -ME Claudia Forero –ISE Claudia Forero.
Nano-fluidic Characterization
P07307: Controls for Dynamic Suspension
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
P07203 Dynamometry Laboratory Infrastructure
Motion Stage for Optical Coherence Tomography
Equilibrate System upgrade
Robotic Arm Project Presentation
P08351: Automated Oiling System
P08002-Automated Parallel Bars
HEMODYNAMIC SIMULATOR II P09026
Tigerbot VI Final Detailed Design Review
Collisionless Rimless Wheel (wired)
MSD P15280 RIT HOT WHEELZ TEST BENCH
Tabletop Torsion Device
P15661 Reciprocating Friction Tester Base Subsystem
Membrane Characterization Test Stand
Positioning/ alignment device for ophthalmic scanning laser systems
Product Evaluation & Quality Improvement
Project Review P07442: Thermoelectric Demonstration Test Bed
Product Evaluation & Quality Improvement
BACK UP P09045: Membrane Characterization Test Stand
Electrical System P09045: Membrane Characterization Test Stand
Mechanical System P09045: Membrane Characterization Test Stand
Control System Summary of Changes Since PDR
Project Readiness Review P10029 – Air Muscle Artificial Limb
Definition & Description:
P07122: Autonomous Quadcopter
Final Project Review -Senior Design 2
Feasibility P09045: Membrane Characterization Test Stand 5/4/2019.
Optical Stage Redesign
Presentation transcript:

P09045: Membrane Characteristic Test Stand Joseph Church Design Engineer (ME) Joseph Ferrara Lead Engineer (ME) Jamie Jackson Electronics (EE) Joelle Kirsch Project Manager (ME) Joshua Van Hook LabView Engineer (EE) Sponsor: Dr. Elizabeth DeBartolo Guide: Dr. Risa Robinson

Project Description Create a test machine that can accurately measure load and strain on a material sample Key Level Customer Needs Engineering Specs Collect load data from two load cells Up to 10 Newtons resolution of +/- 0.001 Collect strain data with use of high speed camera and imaging analysis software Up to 100% elongation Resolution of +/- 0.1% Allow for 1000 pictures/test Eliminate edge effects with use of centralized area Cross shape sample, concentrate on central area of 10 mm x 10 mm JOEY

Design Concept CHURCH

Operation Stepper motor, controlled via USB interface, turns gears that turn lead screws, resulting in stretching of the membrane. The 45° angle of the slides ensure equal displacement in the horizontal and vertical directions. LabView signals for a camera to start taking images and collect data. LabView records the voltage output of two load cells. LabView records a synchronization signal from the camera to correlate displacement and load data. The camera records images to be analyzed with ImageJ in order to determine the strain field. The sample is stretched approximately 1 inch, equally, in the horizontal and vertical directions. JOSH

High Level Risk Assessment Load Cell Readings Equal readings in both directions ensure accurate data Mitigation plan Redesign clamping system or add a support system Clamping redesign includes a lighter material, like UHMWPE Fine-tuning the alignment of all linkages Top Plate Binding Movement of the top plate results in no test data Add in ball slides at front corners of the plate for stability JOEY

System Architecture Motor Sample Load Cell Motor Controller Camera DAQ LabVIEW GUI Power Data from DAQ colleted DAQ sends signal to take pictures Moves motor GUI controls motor through controller Load call measures stress on sample Camera takes pictures of sample Lead Screws Provides the Vertical motion to stretch sample JAMIE

LabView Diagram JOSH

Mounting Procedure Sample Creation Clamps Cross-shaped mold created Place mold on hot plate to melt material Sponge placed under mold for even cooling Clamps Slippage prevented Backstop Screw action mechanical vice grips Torque wrench Centering of clamp 2) JOELLE 1)

Demo

Current State of Design Design meets all customer needs Design meets engineering specifications for full system and subsystems Met project budget of $1500 Leftover- $12 Final Step: Convert prototype to final test stand after receiving parts from Brinkman JOELLE

MSD II: P09045: Membrane Characterization Test Stand Questions… Ferrara MSD II: P09045: Membrane Characterization Test Stand