Outline: Recent CEBAF performance JLAB-TN-022 Energy Reach Plan

Slides:



Advertisements
Similar presentations
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Advertisements

LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
BIA’s Director Review, September Accelerator Improvements FY11-16 Fulvia Pilat.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Operation Status of the RF Systems and Taiwan Photon Source
Science and Technology Briefing Sept
SRF Operating Experience at JLab
Cost Optimization Models for SRF Linacs
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Resource Loaded Schedule and Budget Profile
Jim Fast Pacific Northwest National Laboratory
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
Field Emission Minimization for LCLS-II
Jefferson Lab Overview
FRIB Cryogenic Support
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
CEBAF Accelerator Status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Complementary ISTC Projects #3888, 3889p
Jefferson Lab Reliability Task Force and Initiatives
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
Overview of LERF Status, Plans and Goals
SNS Operational History
CEBAF Accelerator Status
Operational Experience - Field Emission
Regular cryomodule maintenance plans (radiation damage, seals, etc)
Accelerator status after the 12 GeV upgrade
Cryomodule (C20, C50, C100) Field Emission Performance to Date
Cost Optimization Models for SRF Linacs
Introduction to Jefferson Lab
C75 Risk Assessment Geoff Krafft
Operations Department
C75 LLRF Cost and Schedule
Operations Department
Thoughts on Energy Reach
C75 Commissioning Michael Drury SRF Operations Support
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Performance Recovery at CEBAF
A. Freyberg Aug 2016 ECT’16 =>
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Ken Baggett JLab Staytreat, 2017
Extraction Michael Bevins May 17, 2007
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
JLab Users Organization Annual Meeting June 24, 2019
SNS-PPU upgrades the existing accelerator structure
QCM and C50-12 Status Update
Presentation transcript:

12 GeV CEBAF Performance summary and plan to achieve robust reliable operations at the design energy Outline: Recent CEBAF performance JLAB-TN-022 Energy Reach Plan Near Term Long Term Update on gradient degradation Arne Freyberger Monday, April 15, 2019

Recent CEBAF Performance: Summer SAD and 2018-Aug/Sep troubles During Summer2018 shutdown two modules, P1 & F100 moved from LERF to CEBAF Estimated gain to CEBAF: +40 MeV Desired to increase gradient headroom and lower RF trips at 1050 MeV/linac Result: Frozen N2 gas in neighboring module, had to terminate restoration efforts and thermal cycle affected cryomodules. P1 and F100 have not performed as expected in CEBAF Net loss of ~10-30 of MeV <RF trip> barely below 10 trips/h HallC-EnergyReach-CEBAFStatus

Recent CBAF performance: Q1FY19 Post Sept. troubles: Oct/Nov operations at 1050 MeV/linac trippy but productive Decemeber operations at 930 and 805 MeV/linac demonstrate the wisdom of operating with 100 MeV/linac (or more) of gradient headroom. Trip rate dropped as expected Ability to by-pass cavities and even complete cryomodules reduced (eliminated) the need to interrupt the program to fix RF systems. HallC-EnergyReach-CEBAFStatus

Q1FY19 DOE Performance Metric: Accelerator Reliability First quarter in 12 GeV era with reliability > 80 % 930 MeV/linac (first half of December) reliability impacted (in a negative way) by the low current operations to B & D which led to many MPS trips. 805 MeV/linac, last eight days of the run, had reliability > 98% HallC-EnergyReach-CEBAFStatus

CEBAF Energy Reach Plan Goal: Operate CEBAF at design energy, 1090 MeV/linac with 100 MeV of margin in each linac. 100 MeV of margin allows for an entire C100 to be by-passed Emergent problematic cavities and modules can be by-passed without impact to the program (except higher trip rate). In order to achieve this goal, there are two issues: CEBAF energy reach is presently below the 1090 MeV/linac design value (1050 MeV/linac). CEBAF energy reach degrades at a rate of 34 MeV/pass/year (JLAB-TN-022) or 48 MeV/pass/year (preliminary analysis of 2016-2018 operations). We have to catch up, we have to continue to add gradient, and we have to arrest the degradation. HallC-EnergyReach-CEBAFStatus

CEBAF Performance Plan (CPP) (JLAB-TN-17-022) Long term strategy to improve and maintain CEBAF performance through: Identify and purchase Critical Spares to mitigate the impact of single point failures. Replenish consumed hardware spares (I.e. Klystrons) Increase Energy Reach to support the design energy with robust energy margin: C75 Refurbish 8 original C20 modules, includes new cavities and digital controls. C100 Develop and execute C100 refurbishment plan. Particulate Control Clean warm girder regions and upgrade vacuum systems. Upgrade original CEBAF systems to mitigate obsolescence issues in a timely manner (I.e. before reliability degrades) Procure equipment to minimize future maintenance duration (to support up to 34 weeks-per-year of CEBAF operation). 34

CPP: Energy Reach Saw tooth lines represent the energy setting that results in ~ 10 RF trips/h Over 20 years of operational experience with CW SRF operations Analysis of SRF performance over this period has found: ~17 MeV/linac/year of gradient degradation Degradation is not correlated with operating weeks Thermal cycles tend to increase the amount of degradation Recent SRF R&D has found a large amount of particulate on cavities surfaces that have been removed from CEBAF/LERF. Present energy is 4% below design CPP includes improved in-tunnel clean rooms, SRF processing of warm girder sections and NEG pumps In-tunnel vacuum procedure of SRF system has been improved with new mobile clean rooms When degradation is arrested, the Energy Reach plan will be adjusted.

Cryomodule C75-01 Cavity Delays from Vendor Contract awarded in Feb 2018 to vendor based on capability to meet technical requirements at best value After award, original delivery date was agreed to be Aug. 08, 2018 for all (8) cavities In the monthly status meetings, the vendor continually reported delays in delivering In June, delivery delayed to Oct 2018, then delayed to Nov 12, 2018 in August meeting, then to Nov 20, 2018 in Sept meeting Letter of Concern issued in early Sept 2018 Delays were due to fabrication issues encountered during deep drawing and welding of stiffening rings Team lost confidence in vendor’s delivery dates, ability to deliver C75-01 in Summer of 2019 was at risk Decision made in late Sept 2018 to refurbish C100-06 for installation in Summer 2019 Work began in October 2018 to move C100-06 to the Test Lab for disassembly  Latest delivery date for C75 cavities is March 08, 2019

Status and Plans for C100-06R Cryomodule Refurbishment C100-06R Status The cryomodule was removed from the linac as part of the summer down and set aside to “cool down” Disassembly of the cryomodule was completed in November Several cavities have been reprocessed and tested Some cavities have required more than one round of cleaning and testing to eliminate field emission 4 our of 8 cavities meet the requirements and are ready for cavity string assembly C100-06R Plans Complete remainder of cavity qualification by Feb 1, 2019 Build cavity string in February 2019 Complete cryomodule assembly by end of July 2019 Complete cryomodule acceptance test by Labor Day Install and commission in September 2019 The design gradient (108 MeV/module) is 19.3 MV/m. Cavity performance post high pressure rinse is well above the operational limit. All this good work must be retained in the assembly and installation of the module

Update on Cavity Operational Gradient as a function of time Cavity operational gradients change with time Field emitters come (mostly) and go (sometimes) Frozen gases come (unfortunately) and go with thermal cycles Analysis of the CEBAF cavity performance during 2016- 2018 is on-going Results presented here are preliminary CEBAF energy was constant during this period Dataset corresponds to 315 days of CEBAF operation @ 1050 MeV/linac No Helium Processing occurred during this period Sundry unplanned warm-ups did occur (typical) Overall loss of gradient margin has been observed (higher trip rate) while the delivered beam energy has remained constant C20 gradients increased (trip rate increases) to accommodate lower gradients in C50 and C100 cavities. Changes due to issues external to the cavity are not included in this analysis Control system, klystron issues, frozen tuners…

Nov-2015 -> Nov-2018 Gradient Slope (Preliminary) C20 cavity analysis uses the C20 cavity fault models (trip/rate as a function of gradient) to determine the cavity gradients for a ensemble C20 trip rate of 8 trips/h. Five model updates in this period Not all C20 have good models, those cavities slopes are set to zero. Similar to the JLAB-TN-12-049 analysis C50/C100 cavity analysis uses operational gradients during this two-year period CW beam must be present in the machine 2019 (preliminary) (MV/m)/year C20 -0.25 C50 -0.13 C100 -0.24

Update on Cavity Operational Gradient as a function of time CEBAF Performance-Energy Reach Plan uses the 2012 gradient slopes found in JLAB-TN-12-049. These values result in ~-34 MeV/pass per year of lost energy No loss in the C100 is presently accounted for in the Energy Reach Plan 2019 Analysis is a significant increase in data on the C50s and C100s cavities. Stable CEBAF conditions in terms of operating energy allow for a more systematic analysis of C50 performance. 2012 analysis (JLAB-TN-12-049) 2019 (preliminary) (MV/m)/year C20 -0.14 ± 0.05 -0.25 ± 0.04 C50 -0.70 ± 0.08 -0.13 ± 0.10 C100 NA -0.24 ± 0.18 2019 preliminary analysis results in ~-47±12 MeV/pass per year Consistent with the observation of the loss of gradient margin (~120 MeV margin in Fall2016) to near zero margin at present (at linac energy =1050 MeV/linac). C100 loss rate is consistent with observations, although there is large difference in the loss between the North (bad) and South (not so bad) C100s. Gradient Slope Number of Cavities/pass Cavity Length <DE/pass> ((MV/m)/year) (m) (MeV/year) C20 -0.25 ± 0.04 224 0.5 -28 ± 4.5 C50 -0.13 ±0.10 96 -6.2 ± 4.6 C100 -0.24 ± 0.18 80 0.7 -13.3 ± 10.0 Preliminary Energy reach plan will use 34 MeV/pass (2012 value) until 2019 analysis is complete

Energy Reach Chart HallC-EnergyReach-CEBAFStatus

Summary Recent low energy operation (Dec. 2018) has validated the CPP goal for 100 MeV of margin in each linac. C100 refurbishment consisting of a ultra pure high pressure rinse has yielded field emission free cavities beyond the operational limit. First C100 refurbished module, C100-6-R is scheduled for installation in 2019-Sept, will participate in the 2019-Fall run. Analysis of cavity performance during 2016-2018 operations confirms cavity degradation Preliminary value of energy loss of 47 ± 12 MeV/pass/year. The energy reach plan (JLAB-TN-17-022) used the JLAB-TN-12-049 value of 34 MeV/pass/year C75 cavities are delayed and should arrive and be qualified by the end of the year. We continue to adjust the CPP program to optimize against NP schedule, funding, and lab resources. HallC-EnergyReach-CEBAFStatus

Thank You HallC-EnergyReach-CEBAFStatus

Gradient Slope as a function of CEBAF Zone HallC-EnergyReach-CEBAFStatus

Gradient slope by cavity type HallC-EnergyReach-CEBAFStatus