UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.

Slides:



Advertisements
Similar presentations
Text Chiller Plant Optimization that Reduces Energy Consumption 20-50%
Advertisements

A CASE STUDY in actual energy conservation
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
PG&Es Incentive Programs Don Fantz P.E. Energy Solutions Manager Agriculture and Food Processing Customer Energy Solutions PG&E May 2011.
Facilities: A Sampling of Sustainability Efforts Guaranteed Energy Savings Agreement (GESA) Geothermal LEED Building Construction Natural Gas Vehicles.
Federal Reserve Bank of Boston Case Study
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
1 1 BASICS OF ENERGY MANAGEMENT Section A - Energy Basics.
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
A Brief History 1889 – District energy comes to Philadelphia
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Use of renewable energy in the Provinces of Treviso headquarters Maurizio Tufaro Treviso Paving the way for self – sufficient regional Energy supply based.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Overview of Collected Integrated Chiller Retrofit Case Studies Dr. Lisa Gartland (510) ,
ENERGY PERFORMANCE CONTRACTING PROGRAM For Equipment, Design, &Installation of “Energy and Water Upgrades” at University of Massachusetts Lowell Lowell,
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Santa Rita Jail Going off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Integrated Retrofits for Federal Projects Dr. Lisa Gartland.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Oakland Schools 2010/2011 Energy Report October 28, 2011.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Name of Building(s) or Project Speaker(s) Organization(s)
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Marriott Corporate Headquarters
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
Facilities Management and Design Chapter 7 HVAC Systems.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Energy Conservation Building Upgrades Alma School District.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Cogeneration at UC March 09, Welcome Central Utility Plant.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Sustainability Best Practices
The Data Center Challenge
Lecture Objectives: Discuss Final Project
Energy Savings Projects
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Thermal Energy Storage
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Energy Efficiency in District Coiling System
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Presentation transcript:

UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego

UCSD Medical Center Former county hospital which became part of UCSD in the late 1960s 17 buildings of varying age 870,000 square feet total 490,000 square feet in main hospital

UCSD Medical Center Original HVAC Equipment Four chillers, 2380 tons capacity –Two 760 ton centrifugal chillers, 1975, R-11 –160 ton air cooled unit, 1982, R-22 –700 ton 2-stage absorption unit, 1991 Three cooling towers Primary chilled water distribution system Four boilers –3 can only operate at 60% of rated capacity –Unreliable and unsafe

UCSD Medical Center Original Electricity Consumption

UCSD Medical Center Original Gas Consumption

UCSD Medical Center Project Scenario High utility costs –Consumed ~31 million kWh/year and 1.5 million therms, $2.8 million per year Lack of sufficient cooling capacity to meet load requirements Unreliable and unsafe boilers working at low capacity Unused thermal storage facility

UCSD Medical Center Major Project Challenges Selling project and finding financing –hospital finances very tight –project had to pay for itself Keeping hospital operational –night and off-hour work –use of temporary chillers –transition from old to new controls

UCSD Medical Center Project Solutions Load reductions Distribution system improvements New central plant equipment New control system Recommissioned systems

UCSD Medical Center Load Reductions Lighting improvements coincident with project –High efficiency T-8 lamps with electronic ballasts –Changed over 15,000 fixtures –Light levels maintained Reactivated an old, unused thermal energy storage system –3,500 ton/hr system –500 tons cooling capacity

UCSD Medical Center Distribution System Improvements Air handling unit replacement –replaced several selected supply and exhaust units Replaced AHU components –cooling coils & control valves Chilled water system –converted to primary/secondary –changed to 2-way valves

UCSD Medical Center Central Plant Equipment Removed two oldest R ton chillers –installed two new 750 ton R-123 chillers Removed 3 older boilers –replaced with 2 new low NOx dual fuel boilers Upgraded all chilled water and steam system plant auxillary systems

UCSD Medical Center Control Systems & Commissioning Upgraded entire control system to direct digital control Energy conservation strategies implemented –night-time AHU discharge temperature resets –discriminator controls set discharge temperatures to meet worst zone conditions Recommissioned all HVAC systems and steam distribution system

UCSD Medical Center Integrated Economics

UCSD Medical Center Financing Structure University financed for a 10-year term Low interest rate (7.75%) on external financing Tax-exempt financing Positive cash flow of ~ $400,000 annually –~ $1,300,000 annual energy and O&M savings –~ $900,000 annual loan payment

UCSD Medical Center Project Timeline 28 months to complete project

UCSD Medical Center Project Results 10 million kWh/year reduction in electricity usage for the complex (30%) Cooling load reduced 500 tons (17%) Gas consumption down 600,000 therms/yr (40%) Utility savings of $950,000 annually (33%) Maintenance savings of $340,000 annually Improved building comfort from better balancing Better system reliability and controllability