AUG Query Responses 21st November 2013.

Slides:



Advertisements
Similar presentations
AUG Query Responses 19th December Overview AUGE Guidelines require AUGE to report outcome of Query Process to UNCC UNCC to consider AUGE recommendations.
Advertisements

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
PN UNC Workgroup Supply Point Register 25 th October 2011.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Nexus Workgroup CSEP Transition Topic June
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
UNCC 11 November 2013 Request for Clarification on AUG Rules Fiona Cottam.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Options for Mod 640 Replacement
Performance Assurance Framework Risk Register Consultation Summary
Allocation of Unidentified Gas Statement - Update
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Rebecca Knight Mod 644 UIG Analysis.
PAF Risk Register and PARR mapping
DSC Change Committee Summary – 13th June
Modification th July 2008.
Project Nexus Workgroup
CSEPs Reconciliation Proposals
XRN 4695 Supporting Document High Level Plan
Project Nexus Workgroup
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Modification 0429 scenarios v2.0
Project Nexus Workgroup
Mod Proposal 0268 : AQ Backstop Date
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Genuine Reconciliation
Proposed Changes to UNC Section O
Connected System Exit Points - Update
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
CSEPs SPA Rejections November 2007 update
Project Nexus Workgroup
Modification 421 – Updates and Benefits Case
CSEPs SPA Rejections December 2007 update
Modification Proposal 136
Mod 209 – Rolling AQ.
Project Nexus Workgroup
CSEPs SPA Rejections January – August 2007
Further Considerations
Xoserve Draft UIG Incentives Modifications 20 May 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

AUG Query Responses 21st November 2013

Overview AUGE Guidelines require AUGE to report outcome of Query Process to UNCC UNCC to consider AUGE recommendations UNCC to endorse AUGE’s recommended course of action or vote unanimously to reject (see section 8 of the AUGE Guidelines for details) Presentation covers two sets of queries ICoSS response on 23rd October 2013 British Gas response on 13th November 2013 Update on iGT CSEP volume error

ICoSS – Query 1 Modification 410A Response Introduces improvements to handling of unregistered sites and better control of the MPRN creation process Response Changes the way unregistered sites handled – specifically <12 months category Expect to see declining levels of permanent UG for unregistered sites during 2014/15 AUG Methodology requires update to reflect this Impact is material and will reduce permanent UG for these categories Volume and rate tables will need to be updated Query classed under 8.5 as “Material and can be implemented for final AUG table” Subject to previous agenda item regarding mismatch between UNC and AUGE Guidelines 3

ICoSS – Query 2 Mod 431S and SPA MAM 13/002 Mod 431S introduces a portfolio reconciliation between Shippers and Transporters which will help identify potential unregistered sites SPA MAM 13/002 introduces restrictions to stop meters being fitted without a supply contract Neither have been implemented and therefore cannot be incorporated into the methodology or figures for 2014/15 Impact of 431S cannot be assessed until the portfolio reconciliation occurs in any case Query classed under 8.4(a) as “Requiring no action” 4

ICoSS – Query 3 Mod 424 – re-establishment of Supply Points This modification reduces occurrence of shipperless sites The effects of this modification have already been documented in the 2013 AUGS for 2014/15 and included in the calculation of interim rates and volumes Query classified under 8.4(a) as “Requiring no action” 5

ICoSS – Query 4 Impact of data quality ICoSS raised various concerns about data quality and suitability for AUG calculations No specific issue was raised or estimation of impact it would have Response highlighted improvements in 2013 to address data quality issues Data quality issues have been highlighted previously and this is therefore not a new Unidentified Gas issue per se If specific issues are highlighted then we could investigate them Query classed under 8.4(a) as “Requiring no action”

British Gas - Query 1 Allocation issue Discrepancy identified in Allocation totals used in calculation spreadsheets Identified issue with EWCF used when calculating seasonal normal allocations Updated data not included in all calculations This needs to be corrected and volumes/rates table updated accordingly Nearest classification is under 8.5 “Material change that can be implemented for final gas volumes and rates” – it does not require a change to the AUGS

British Gas - Query 2 Concerns the calculation of the forward estimate of UG Query relates to the use of the balancing factor from the historical period rather than calculating it by difference for the forecast year We believe this is a misunderstanding of the process The AUGS could be clearer on how the forward calculation works If calculating by difference for forward years, any UG improvement initiatives only get converted to balancing factor (mainly theft) which would be incorrect Recommend additional clarifications added to AUGS to show how each UG segment is extrapolated from historic to forecast years Query classified as “8.4(b) requires a change to the AUGS but does not have material impact on volumes/rates” Subject to previous agenda item regarding mismatch between UNC and AUGE Guidelines

British Gas - Query 3 Concerns the suspected erroneous inclusion of large sites in Unregistered / Shipperless UG calculations Also queried the 5x multiplier for derivation of temporary UG Misunderstanding of the use of flags in spreadsheets Data not removed, but flagged for investigation. “Remove” flag is used when calculating average LSP AQ to avoid skewing the average The derivation of the 5x factor is also noted in query response and it is a coincidence that it is a whole number More details provided in response Query classed under 8.4(b) as “Requiring no action”

British Gas - Query 4 Concerns exclusion of large sites >58GWh pa when producing AQ scaling factors for shipperless/unregistered sites Response clarifies process and why sites left out as appropriate Noted insufficient evidence to assume that all large sites will always be revised downwards Summarised key process steps for clarification Query classified under 8.4(b) as “Requiring no action”.

British Gas - Query 5 Concerns CSEP consumption not being adjusted for sites with AQ>1 not consuming, resulting in under-estimate of UG We note that there is also the opposite issue of not adjusting consumption for sites where AQ=1 that are consuming resulting in a potential over-estimate of UG CSEPS were adjusted for both situations in an early draft of the AUGS During the year we identified that CSEP EUC bands were based on max AQ CSEP EUC banding therefore unreliable Latest AUGS estimates CSEPs consumption based on average aggregate AQ This is therefore not a new issue and has already been through consultation during the year Query classified under 8.4(b) “Requiring no action” 11

iGT CSEP Volume Issue update A large iGT CSEP has calculated volumes incorrectly This may or may not have a material impact on UG – no data provided to assess We understand the issue has been corrected going forward The effects are inherent in the interim AUG table Likely to be small CSEPS account for a small % of demand This is just one part of that market Issue concerns a subset of the portfolio We understand that we are unlikely to get corrections until after the final AUG table has been prepared 12

Next Steps Deal with any further queries or rejected queries from this meeting Prepare final AUG table for Gas Transporters on or before 1st January 2014 13

Thank you for your attention