PICKERING A UNIT 4 BOILER 6 HOT SOURCE Scott Cameron Pickering B RPM.

Slides:



Advertisements
Similar presentations
Module 1: BLOCK 1 / MAIN MENU
Advertisements

PROJECTIONS OF STRAIGHT LINES.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Physical principles related to operation
Skin cancer prevention: information, resources and environmental changes Implementing NICE guidance 2011 NICE public health guidance 32.
Applicable for Persons Registered under Article 10
Module Floor Systems.
2014 Egg Industry Issues Forum. Building Excellence for over 90 years PREPARING FOR THE FUTURE!
1 NatQuery 3/05 An End-User Perspective On Using NatQuery To Extract Data From ADABAS Presented by Treehouse Software, Inc.
Force & Motion review.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Old Kelleys IGA 200 Irwin Ave. Produced By: Lt. Ryan Christen Ocean City-Wright Fire Control District This presentation is a simple guide to area agencies.
Pole Vault. Creating a Safe Pole Vault Environment provide the proper instruction provide the proper progression skills warn athletes and parents of the.
Patea Freezing Works Asbestos Overview of Quantities and Locations February 2009.
Pythagorean theorem PROBLEM SOLVING.
HOT & COLD WATER SYSTEMS
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
eQuest Quick Energy Simulation Tool
CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007.
Hazard Recognition and Risk Analysis
GEtServices Services Training For Suppliers Requests/Proposals.
SDG&E ® Multi-Family Proposed Whole Building Performance Pilot Nathan Bruner Residential Customer Programs San Diego Gas & Electric ® October 21, 2011.
Equal or Not. Equal or Not
Slippery Slope
Automotive Technology
CON 4003 Construction Estimating Prof R. V. Locurcio.
Page 1 of 34 The Search Agreements functionality in Transfers enables you to find existing agreements pertaining to registered interests. Using the search.
Conservative and non-conservative Forces Conservative forces – have the following properties: 1.Work done by a conservative force on a particle moving.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Ss Hefei, China July 19, 2011 Nuclear, Plasma, and Radiological Engineering Center for Plasma-Material Interactions Contact: Flowing.
Subpart R Steel Erection
PErforM for work teams Insert presenters names and titles.
Radiation Safety Reminders During Nuc. Med. Procedures ALARA Practices By Aggie Barlow, CHP, MBA, MS.
DO NOT PLACE ANY TEXT OR GRAPHICS ABOVE THE GUIDELINE SHOWN DO NOT PLACE ANY TEXT OR GRAPHICS BELOW THE GUIDELINE SHOWN TO EDIT GRAPHICS IN THE MASTER.
Chapter 9 Review Solving Triangles.
Pipe Supports and Restraints
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
Hydronic Mechanical Controls
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
SOLAR CHILL SOUTHWEST SOLAR PUMP POWER IN FAN MOTOR PAD MEDIA PUMP BOARD.
OSHA’s Fall Prevention Campaign
Contact with a Stored Energy Source 1 Feb 2012 Summary of events Contributing factors Moving forward, What did we learn and do.
EXAMPLE – Quality Control Plan For Consultants
New format which merges with IGAP (Individual Growth Action Plan) My Learning Plan.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Scott Cameron Manager Radiation Protection 2008 International ALARA Symposium ALARA Performance at OPG.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
EQ: What is the relationship between the 3 sides in a right triangle?
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
0Presentation Title – November 12, 2008 (optional) Ladder SPI Q&A.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
BACK SAFETY & SAFE LIFTING 1PPT Bureau of Workers’ Compensation PA Training for Health & Safety (PATHS)
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT.
Changes in Dimensions. 5 ft 8 ft EX1)Suppose the dimensions of the rectangle are doubled. What effect would this have on the perimeter? On the Area? P=
Project Management Essentials Connecting PI to PM
Goodyear Napanee Contractor Safety
PES 1000 – Physics in Everyday Life
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
1. What Google app created this assessment?
Global Safety Standard Orientation Line and Equipment Opening
ACTION VERBS.
Cryogenics – The Basics
By: Kory Hildebrand PPE.
Presentation transcript:

PICKERING A UNIT 4 BOILER 6 HOT SOURCE Scott Cameron Pickering B RPM

OUR GOAL The Elimination or Control of this Hazard will allow P941 Outage work to proceed safely while minimizing extra dose to workers.

PROBLEM STATEMENT High Energy Source Identified in the Cold Leg Drain Line of Unit 4, Boiler 6 >450,000 rem/h ESTIMATED CONTACT GAMMA DOSE 1cm 18,000 5cm cm 350 rem/h JUST BELOW HOT LEG DRAIN LINE Hot Leg Drain Line Cold Leg Drain Line manway Archived Photo Without Insulation On This is Boiler 12 Not Boiler 6

AREA THAT SOURCE AFFECTS 40 top of stairs 27 btm strs 29 WPW wall 26 top strs to feeders 35 BO12-BO6 18 to flange drain line 12 danceflr 2900 mrem/h 450 mrem/h 2500 mrem/h 225 mrem/h 4500 mrem/h 200 mrem/h

CLICK HERE TO RETURN TO PREVIOUS SLIDE >450,000 1cm On Boiler Drain Line Elbow cm Boiler Base Pedestals BOILER to 3 of insulation to get to drain line

PICTURES OF AREA Drain Line Valve Under PHT Pumps Along HT Catwalk, Flanged Off.

Perimeter Walk Way 200 mrem/h

PICTURES OF AREA Dance Floor 2.5 rem/h at Surveyor Position

CATWALK DANCE FLOOR TRIM VALVE PLATFORM PERIMETER WALK WAY

OPTIONS 1.FLUSH AND CAPTURE 2.IF FLUSH AND CAPTURE FAILS: 1) SHIELD BOILER 6 (USING LONG HANDLED TOOLS, ROPES) 2) RUN PARALLEL PLAN TO DO WORK ON EAST SIDE, DEVELOP PLAN FOR CUT OUT DURING P1041 OUTAGE OR 3. DEVELOP PLAN FOR CUT OUT DURING THIS OUTAGE IF TIME PERMITS.

OPTION DETAILS (contd) 1.FLUSH AND CAPTURE OPERATIONAL METHOD: Forced drain to a shielded catch container (particle will progress in drain line/drain hose to two IX Columns in parallel. Risk-particle doesnt move Contingency- See Option 2 Above Risk- Particle becomes lodged on route in steel line drain line before reaching tygon hose. Contingency- Shield (depending on location). Continue with boiler campaign on west side, develop plan for next outage to cut out.

DRAWING OF FLUSH AND CAPTURE OPTION 2 In Station Flasks With IX Column Inside Ice Plug Here For Double Isolation Drain Manifold Flanged Drain Valve V11 Drain Line - 18ft CRANE 311 B/R North TOTE Hot Spot Cold Leg Drain Line TOTE SIDE VIEW BOILER 6

PREREQUISITE ACTIVITIES 1.Draft Work Plan 2.Address assessing requirements 3.Develop and procure tooling 4.Set up mock up 5.Acquire resources 6.Train 7.Transfer of Particle Issues 8.Target Dates 9.Approval of Back-Up Schedule and Implementation

RISKS a) Resources b) Timeline c) Cost d) Dose Assignment e) If particle has changed locations and no longer where we think it is

OPTIONS FLOWSHEET FLUSH AND CAPTURE PARTICLE YES IS CAPTURE SUCCESSFUL? PROCEED WITH REGULAR OUTAGE SCOPE NO SHIELD BOILER 6 AS BEST AS POSSIBLE. MOVE TO EAST BOILERS AND LEAVE FOR NEXT OUTAGE 1041 OR CUT OUT IN PARALLEL ON 941.