Adjustments to the Air Toxics Standards for Major and Area Source Boilers 40 CFR Part 63, Subparts DDDDD and JJJJJJ Summary of Final Changes, Key Highlights.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

September 17, 2003 Workshop WEBCAST Hank Naour ILLINOIS EPA MACT Standards and Section 112f Residual Risk.
National Emission Standards for Hazardous Air Pollutants: Municipal Solid Waste Landfills.
METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
SUBPART N MACT AMENDMENTS QUESTIONS & ANSWERS 40 CFR PART 63, SUBPART N.
1 Section 112J: The HAMMER Clause & Title V (CAAPP) What has Illinois been doing about the PART 2; May 15, 2003 Deadline???? Hank Naour ILLINOIS EPA.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
Compliance Dates The final rule was published on January 25, 1995,
METAL COIL SURFACE COATING MACT CLOSING METAL COIL SURFACE COATING MACT CLOSING 40 CFR PART 63 SUBPART SSSS May CFR PART 63 SUBPART SSSS May 2006.
HARD CHROME ELECTROPLATING MACT AMENDMENTS CLOSING HARD CHROME ELECTROPLATING MACT AMENDMENTS CLOSING 40 CFR PART 63, SUBPART N.
Clean Smokestacks Act Benefits Update Division of Air Quality March 17, /17/2010.
Oklahomas Toxics Program Proposed Funding Air Quality Council January 19, 2005.
Clean Air Act By: Sophie Netter. Clean Air Act Drafted in 1970 Amended in 1977 and 1990 in order to set new dates for the goals because many areas had.
Adjustments to the Air Toxics Standards for Area Source Boilers Summary of 2012 Adjustments to Requirements Presentation for Annual SBEAP Meeting Chicago,
Sector-Based Pollution Prevention: Toxic Reductions through Energy Efficiency and Conservation Among Industrial Boilers A Presentation to the GLPPR Erie,
Tim Davis NJDEP – Air C&E
IDEM Update June 8, 2011 Office of Pollution Prevention & Technical Assistance.
Impacts of the New Boiler MACT Rules Les Oakes King & Spalding.
MACT Vacaturs & Section 112(j) Plywood MACT Vacatur Boiler MACT Vacatur & Section 112(j) rule Section 112(j) applicability Section 112(j) requirements.
Part 63 Boiler Rule for Area Sources AWMA Conference September 11-14, 2012 Biloxi, MS Lee Page Air Toxics Assessment and Implementation Section U.S. Environmental.
Delivering sustainable solutions in a more competitive world Proposed Area and Major Source Boiler NESHAP Overview David Dunn Environmental Resources Management.
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Environmental Compliance Hot Topics Hardwood Plywood Veneer Association May 25, 2010.
Boiler GACT Update Georgia AWMA Conference
Non-Hazardous Secondary Materials Definition: How it Relates to Boiler MACT and CISWI Rules Biloxi, MS ♦ September 13, 2012 Melissa Hillman Justin Fickas.
Rick Soucy GZA GeoEnvironmental, Inc.
Managing Air Quality Data 101 Presented by: Chris Bellusci (GeoEngineers) & Claire Lund, PE (Sanborn Head) International Conference for Environmental Data.
Harmonization of Parts 60 and 75
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Florida Department of Environmental Protection Hospital/Medical/Infectious Waste Incinerators (HMIWI) Tiffany Miesel & John Glunn Florida DEP, Division.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality July 2013 Environmental Management Commission.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
Overview of the Clean Air Act and the Proposed Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards Public Outreach.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Presentation to Board of Forestry November 29, 2011 Alice Edwards Division of Air Quality Alaska Department of Environmental Conservation
1 Asbestos NESHAP Inspection and Safety Procedures Course Chapter 1 Background Information Version
Integrated Planning Model (IPM) What It Is, Who Uses It, How It Works, What It Can Show You Presentation for For the Clean Air Act Advisory Committee Permits/New.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Particulate Matter Monitoring Required by the Utility MATS Eric Swisher| | ext. 17 August 22, 2012 Presented to ARIPPA.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality Air Toxics Rule Changes Stakeholder Meeting March 20,
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
Recent Tennessee Hazardous Waste Regulatory Amendments In May 2010 the existing Tennessee hazardous waste fees were adjusted for inflation since the date.
Overview What we’ll cover: Key questions Next steps
Inventory Needs and Legal Requirements Martin Johnson Emission Inventory Workshop Air Resources Board March 13, 2006.
1 Potential Impacts of a National SO 2 Program WRAP Forum June 3, 2004.
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
National Workshop on Urban Air Quality and Integrated Traffic Management Karachi, September 13-14, 2006.
Hot Topics in Air Quality NAAQS, Regulations, and Other Developments Jeff Slayback A&WMA Southwest Ohio Chapter August 19, 2010.
Fuels for Schools & Beyond Biomass Boilers Status March 18, 2009.
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
Portland Cement NESHAPs & NSPS, and Related Solid Waste Combustion Rules David L. Jones Eastern Kern APCD November 4, 2011 California Desert Air Working.
Complying with Periodic Emissions Monitoring Requirements
Steve Page Office Director, OAQPS NACAA Spring Meeting 2010
North Carolina Division of Air Quality Mike Abraczinskas
Amendments to N.J.A.C. 6A:5 Regulatory Equivalency and Waiver
What is the Boiler NESHAP?
Georgia Update Jeff Cown Land Protection Branch
Hazardous Air Pollutants under the Clean Air Act
AWMA Georgia Chapter Regulatory Conference
Clean Air Act The Clean Air Act was first passed in 1963
16th annual regulatory update conference November 17, 2017
Travis Felthaus APES -4 Bodas
AWMA Georgia Chapter Regulatory Update Conference EPD Air Protection Overview March 2016.
Hazardous Air Pollutants under the Clean Air Act
Presentation transcript:

Adjustments to the Air Toxics Standards for Major and Area Source Boilers 40 CFR Part 63, Subparts DDDDD and JJJJJJ Summary of Final Changes, Key Highlights Susan Lancey, U.S. EPA Region I Presentation for AWMA New England Chapter April 9, 2013

Regulatory Update Overview Key Highlights Recent Amendments National Emission Standard for Hazardous Air Pollutants (NESHAP) for Major Source Industrial, Commercial, Institutional Boilers and Process Heaters, 40 CFR Part 63 Subpart DDDDD (5D), amendments published 1/31/13 NESHAP for Area Sources: Industrial, Commercial, and Institutional Boilers, 40 CFR Part 63 Subpart JJJJJJ (6J), amendments published 2/1/13 Resources for More Information 2

The Right Standards for the Right Boilers Of 1 The Right Standards for the Right Boilers Of 1.5 million boilers in the U.S., less than 1% will need to meet numerical emission limits <1% (about 2,300) would need to meet numerical emission limits to minimize toxics. Most of these are larger boilers located at industrial facilities. ~197,000 covered by rules 13% (about 197,000) would need to follow work practice standards, such as annual tune ups, to minimize toxics. ~1.3 million boilers not covered by rules 86% are clean and not covered by these rules. Many of these boilers are at places like hospitals, schools and churches. 3

Reduces Toxic Emissions and Protects Human Health Burning biomass, coal, and oil results in emissions of mercury, dioxin, furans, formaldehyde, lead, and hydrochloric acid. The technologies to reduce toxic air pollution have largely been available and in use for decades. Health effects are significant: Mercury can cause adverse effects on children’s developing brains, including effects on IQ, learning and memory. Air toxics can cause cancer and other serious health effects in adults and children. Controlling air toxics will also reduce fine particle pollution and carbon monoxide. Fine particles are linked to serious cardiovascular and respiratory effects, even premature death. Carbon monoxide reduces oxygen delivery to heart and brain, can cause angina and other problems for people with heart disease.

Key Adjustments Area Source Boilers Final Rule Amendments Published in the Federal Register 2/1/2013 Adjusted emission limits Revised Hg and CO emission limit for new and existing large coal-fired boilers Allowing the necessary time to implement the standards Revised the deadline for initial notification for existing area source boilers to January 20, 2014. Sources who already submitted an initial notification do not need to resubmit. Delayed the initial tune-up compliance date by two years for existing boilers until March 21, 2014 Deadline for submitting the notification of compliance status (NOCS) for tune-ups is now July 19, 2014 Compliance date for boilers subject to emission limits and subject to the energy assessment requirement is still March 21, 2014 5

Key Adjustments Area Source Boilers Added to and refined the list of subcategories Added definitions for the following, not covered by the rule: Temporary boilers used temporarily in place of another boiler while that unit is being replaced or repaired, generally over an operational period of less than 12 months, unless an extension is approved. Residential boilers intended primarily for heat or power for a residential unit of up to four families, or a single unit residence that has been converted or subdivided into apartments or condos Electric boilers Revised definition for “boiler” to clarify that process heaters are not covered by the rule Revised definition for “hot water heater” to clarify gas, oil, and biomass hot water boilers (e.g., not generating steam) rated at less than 1.6 million Btu per hour are not covered by the rule Added subcategories for seasonally-operated boilers and limited-use boilers 6

Key Adjustments Area Source Boilers Reduced tune-up frequency for certain boilers Requiring tune-ups every 5 years, instead of every 2 years, for: Seasonal boilers, oil and biomass boilers which undergo a shut down for at least 7 consecutive months each 12-month period due to seasonal conditions, except for period testing (not to exceed 15 days in the 7 month shutdown) Limited-use boilers with a federally enforceable annual average capacity factor of no more than 10 percent Oil-fired boilers with heat input capacity < 5 MMBtu/hr Boilers with oxygen trim systems Initial tune-ups are not required for new boilers 7

Key Adjustments Area Source Boilers Revised energy assessment provisions More clearly defined the scope and clarified the energy assessment is limited to only those energy use systems located on-site associated with the affected boilers Specify that sources that operate under certain energy managements programs, e.g., ISO 50001 energy management system, that include the affected boilers satisfy the energy assessment requirement Added a cap (not to exceed 160 hours) for on-site technical hours for large fuel use facilities 8

Energy Assessments EPA developed a Summary of Energy Assessment Requirements posted at: www.epa.gov/boilercompliance EPA Region I is developing a self-determined list of qualified energy assessors in New England posted at: http://www.epa.gov/boilercompliance/whereyoulive.html#region1 In New England, for questions about energy assessments or to request to be added to the energy assessor list, contact Patrick Bird at (617) 918-1287 or bird.patrick@epa.gov For additional information on energy assessments see the DOE website: http://www1.eere.energy.gov/manufacturing/tech_deployment/energy_assessment.html

Key Adjustments Area Source Boilers Added compliance alternative for PM for certain oil-fired boilers New oil-fired units may combust low sulfur oil* as an alternative method of meeting the PM emission standard (provided the boiler does not use a post-combustion control technology (except a wet scrubber) to reduce PM or sulfur dioxide emissions). Providing continuous compliance alternative for CO emission limit Allowing CO CEMS as compliance alternative *< .5 weight percent sulfur content requirements 10

Key Adjustments Area Source Boilers Reducing fuel sampling and performance testing requirements under certain circumstances Coal boilers demonstrating initial compliance with the Hg emission limit: if Hg constituents in the fuel or fuel mixture are measured to < half of the Hg emission limit, no need to conduct further fuel analysis sampling Boilers demonstrating initial compliance with the PM emission limit: if the performance test results show that the PM emissions are < half of the PM emission limit, no need to conduct further PM emissions testing Revising provisions for dual-fuel fired boilers Existing dual-fuel fired boilers (i.e., commenced construction or reconstruction on or before June 4, 2010) that fuel switch fuels from gas to coal, biomass or oil after June 4, 2010 remain existing sources, as long as the boiler was designed to accommodate the alternate fuel New dual-fuel fired boilers that make such a fuel switch would continue to be considered new sources 11

Key Adjustments Area Source Boilers Electronic Reporting: The final rule added electronic reporting of the notification of compliance status (NOCS) reports using the Compliance and Emissions Data Reporting Interface (CEDRI) through EPA’s Central Data Exchange (www.epa.gov/cdx)   EPA is currently developing and testing a reporting template for the NOCS Report. Upon completion, expected in the fall of 2013, sources will be required to log into CEDRI and submit these reports. Electronic reporting of performance test results still required, for test methods listed on the electronic reporting tool (ERT) website (www.epa.gov/ttn/chief/ert/index.html) 12

Key Adjustments Major Source Boilers Final Rule Amendments Published in the Federal Register 1/31/2013, effective April 1, 2013 Extended the compliance date for existing units to implement the standards Compliance date for existing sources is January 31, 2016 Adjusted emission limits based on new and corrected data New particulate matter (PM) emission limits for biomass fueled boilers New carbon monoxide limits to address variability Added an alternate CO CEMS-based limits for most subcategories Allowing metals emission limits as an alternative to using PM limit as a surrogate for metallic air toxics Replaced dioxin limit with work practice standards – data shows dioxin emissions are below levels that can be accurately measured. Revising definitions, including those for “30-day rolling average” and “daily block average,” “energy assessment” and “qualified energy assessor,” and “startup” and “shutdown.” 13

Key Adjustments Major Source Boilers Added to and refined the list of subcategories Final rule includes 18 subcategories of boilers based on fuel and design Work practices – Tune-up requirement Requirement to optimize CO emissions to manufacturers specifications and also to be consistent with any NOx requirements Allow units with oxygen trim system, and gas and light liquid fuel boilers < 5 MMBtu/hr, to conduct tune-up every 5 years Allow delay of inspections for certain situations Work practices – Startup & Shutdown Revised startup and shutdown definitions based on starting & stopping supplying steam rather than proposal based on operating load Requires clean fuel at startup; and engaging control devices when coal, biomass or heavy oil is fired, except limestone injection in fluidized bed combustion boilers, dry scrubber, fabric filter, SNCR, SCR, which you must start as expeditiously as possible. 14

Key Adjustments Major Source Boilers Revised energy assessment provisions More clearly defined the scope and clarified the energy assessment is limited to only those energy use systems located on-site associated with the affected boilers Specify that sources that operate under certain energy managements programs, e.g., ISO 50001 energy management system, that include the affected boilers satisfy the energy assessment requirement Added a cap (not to exceed 160 hours) for on-site technical hours for large fuel use facilities Revised definition for “hot water heater” to clarify gas, oil, and biomass hot water boilers (e.g., not generating steam) rated at less than 1.6 million Btu per hour are not covered by the rule 15

Key Adjustments Major Source Boilers Compliance monitoring - increased flexibility Removed requirement for large biomass units to install PM CEMS Replaced requirement for large coal units to install PM CEMS with requirement to install a PM CPMS but have option to use PM CEMS Allow the use of SO2 CEMS as operating limit for demonstrating continuous compliance with the HCl limit Continue to allow units burning clean gases to qualify for work practice standards instead of numeric emission limits Removed hydrogen sulfide (H2S) fuel specification from the rule 16

Key Adjustments Major Source Boilers Electronic Reporting: The final rule added electronic reporting of ongoing compliance reports using the Compliance and Emissions Data Reporting Interface (CEDRI) through EPA’s Central Data Exchange (www.epa.gov/cdx), once EPA has developed the specific reporting form.  Electronic reporting of performance test results and CEMS relative accuracy test audit (RATA) data still required, for test methods listed on the electronic reporting tool (ERT) website (www.epa.gov/ttn/chief/ert/index.html) 17

For Additional Information For Sources in New England: Susan Lancey, 617-918-1656 lancey.susan@epa.gov Patrick Bird, 617-918-1287 bird.patrick@epa.gov For area source boilers: http://www.epa.gov/boilercompliance For major source and area source boilers: http://www.epa.gov/ttn/atw/boiler/boilerpg.htm

Appendix

1 An existing dual-fuel fired boiler meeting the definition of gas-fired boiler that meets the applicability requirements of subpart JJJJJJ after June 4, 2010 due to a fuel switch from gaseous fuel to solid fossil fuel, biomass, or liquid fuel is considered to be an existing source under this subpart as long as the boiler was designed to accommodate the alternate fuel.

2 A new or reconstructed dual-fuel gas-fired boiler that meets the applicability criteria of subpart JJJJJJ after June 4, 2010 due to a fuel switch from gaseous fuel to solid fossil fuel, biomass, or liquid fuel is considered to be a new source. 3 New oil-fired boilers that combust only oil with no more than 0.50 weight % sulfur or a mixture of 0.50 weight % sulfur oil with other fuels and that do not use a post-combustion technology (except a wet scrubber) to reduce PM or SO2 emissions are not subject to the PM emission limit.

22

Emission Limits for Existing Major Source Boilers Subcategory #Units Limits in 2011 Final Rule, lb/MMBtu unless noted Limits for Reconsideration Final Rule, lb/MMBtu, unless noted Hg, lb/TBtu HCl PM CO, ppm D/F, ng/dscm (CO CEMS-based) D/F Coal stoker 391 4.6 Solid fuel subcat. 0.035 0.039 270 0.003 5.7 0.022 0.040 160 (340) Work practice Coal fluid. Bed 35 82 0.002 130 (230) Coal PC 190 0.004 (320) Biomass wet stoker—revised subcategory 304 490 0.005 0.037 1,500 (720) Biomass fuel cell 14 690 4 0.020 1,100 Biomass fluid. Bed 24 430 0.02 0.11 470 (310) Biomass dutch oven/pile burner—revised subcategory 0.2 0.28 770 (520) Biomass susp./grate 18 3,500 0.44 2,800 (900) Biomass suspension—revised subcategory 47 0.051 2,400 (2,000) Biomass dry stoker--new subcategory 74 0.32 460 Heavy liquid-new subcategory 320 3.4 0.00033 0.0075 10 2.0 0.0011 0.062 Light liquid-revised subcategory 581 0.0079 Gas 2 129 13 0.0017 0.043 9.0 0.08 7.9 0.0067 Non-cont. liquid 0.78 0.27 New and existing small (<10 MMBtu/hr) units, natural gas-fired units, metal process furnaces, units combusting other clean gases, and limited use units will be subject to work practice standards.

Emission Limits for New Major Source Boilers Subcategory Limits in 2011 Final Rule, lb/MMBtu unless noted Limits for Reconsideration Final Rule, lb/MMBtu, unless noted Hg, lb/TBtu HCl PM CO, ppm D/F, ng/dscm Hg, lb/Tbtu (CO CEMS-Based) D/F Coal stoker 3.5 Solid fuel subcat. 0.0022 0.0011 6 0.003 0.80 0.022 130 (340) Work practice Coal fluid. bed 18 0.002 (230) Coal PC 12 140 (150) Biomass wet stoker—revised subcategory 160 0.005 0.030 620 (390) Biomass fuel cell 470 0.020 910 Biomass fluid. Bed 260 0.02 0.0098 230 (310) Biomass dutch oven/pile burner 0.2 0.0032 330 (520) Biomass susp./grate 1,500 0.026 1,100 (900) Biomass suspension 2,400 (2,000) Biomass dry stoker 460 Heavy liquid 0.21 0.00033 0.0013 3 0.48 0.00044 0.013 Light liquid New gas 2 7.9 0.0017 0.0067 0.08 New non-cont. liquid 0.78 51 0.023 New and existing small (<10 MMBtu/hr) units, natural gas-fired units, metal process furnaces, units combusting other clean gases, and limited use units will be subject to work practice standards.

Emission Limits for Area Source Boilers Subcategory 2011 Final Rule Emission Limits Reconsideration Final Rule Emission Limits Hg, lb/TBtu CO, ppm PM, lb/MMBtu 3% oxygen New Coal ≥ 10 MMBtu/h 4.8 400 0.03 (≥ 30 MMBtu/h) 0.42 (10 to 30 MMBtu/h) 22.0 420 No Change New Biomass - 0.07 (10 to 30 MMBtu/h) New Oil 0.03 Existing Coal (600 units) < 10 MMBtu/h (3,100 units) Existing Biomass (168,000 units) Existing Oil (11,000 units) New and existing small (<10 MMBtu/h) coal-fired boilers, new and existing biomass-fired boilers, and new and existing oil-fired boilers are subject to a biennial tune-up requirement. New and existing seasonal boilers, limited-use boilers, oil-fired boilers with heat input capacity ≤ 5 MMBtu/h, and boilers with an oxygen trim system are subject to a 5-year tune-up requirement. Existing coal-fired, biomass-fired, or oil-fired boilers with heat input capacity ≥ 10 MMBtu/h (not including limited-use boilers) are subject to a one-time energy assessment requirement.

Emission Limits for Existing CISWI Units Pollutant (units) 1 CISWI Subcategories2 Incinerators3 Energy Recovery Units - Liquid/Gas Energy Recovery Units - Liquid/Gas3 Energy Recovery Units - Solids Waste-burning kilns Small, Remote Incinerators3 2011 Final Rule Reconsid. Final HCl (ppmv) 29 14 0.45 0.20 (biomass units) / 13 (coal units) 25 3.0  220 300 CO (ppmv) 36 17 35 490 (biomass units)/59 (coal units) 260 (biomass units) / 95 (coal units) 110 110 (long kilns) / 790 (preheater/precalciner)  20 64 Pb (mg/dscm) 0.0036 0.015 0.096 0.014 (biomass units) / 0.14 (coal units)  0.0026 0.014 2.7 2.1 Cd (mg/dscm) 0.023 0.00051 0.0014 (biomass units) /0.0095 (coal units) 0.00048 0.0014 0.61 0.95 Hg (mg/dscm) 0.0054 0.0048 0.0013 0.0024 0.00033 0.0022 (biomass units) /0.016 coal units 0.0079 0.011 0.0057 0.0053 PM, filterable (mg/dscm) 34 250 11 (biomass units) / 160 (coal units)  6.2 4.6 230 270 Dioxin, Furans, total (ng/dscm) 2.9 0.35 0.52 (biomass units) / 5.1 (coal units)  0.2 1.3 1,200 4400 Dioxin, Furans, TEQ (ng/dscm) 0.13 0.32 0.059 0.12 (biomass units) / 0.075 (coal units)  0.007 0.075 57 180 NOx (ppmv) 53 76 290 (biomass units)/340 (coal units) 290 (biomass units) / 340 (coal units) 540 630 240 190 SO2 (ppmv) 11 720 6.2 (biomass units)/650 (coal units) 7.3 (biomass units) / 650 (coal units) 38 600 420 150 Emission Limits for Existing CISWI Units All emission limits are measured at 7% oxygen. Number of units in each subcategory: 27 incinerators; 6 ERUs-liquid/gas; 22 ERUs-solids (18 biomass/4 coal); 23 waste-burning kilns; and, 28 small, remote incinerators. 3 Emission limits did not change from final to reconsideration proposal for this subcategory. 26

Emission Limits for New CISWI Sources Emission Limits for New CISWI Units Pollutant (units) 1 CISWI Subcategories Incinerators2 Energy Recovery Units - Liquid/Gas Energy Recovery Units - Liquid/Gas2 Energy Recovery Units - Solids Energy Recovery Units - Solids Waste-burning Kilns Small, Remote Incinerators2 2011 Final Rule Reconsid. Final Reconsid. Final 21011 Final Rule Reconsid. FInal  Reconsid. Final HCl (ppmv) 0.091 14 0.45 0.20 (biomass units ) / 13 (coal units) 3.0 200 CO (ppmv) 12 17 36 35 160 (biomass units)/46 (coal units) 240 (biomass units ) / 95 (coal units) 90 90 (long kilns) / 190 (preheater/ precalciner) 13 Pb (mg/dscm) 0.0019 0.015 0.096 0.0031 0.014 (biomass units) / 0.14 (coal units)  0.0026 0.014 0.26 2.0 Cd (mg/dscm) 0.0023 0.023 0.00051 0.0014 (biomass units) / 0.0095 (coal units) 0.00048 0.0014 0.61 0.67 Hg (mg/dscm) 0.00016 0.00084 0.00025 0.00056 0.00033 .0022 (biomass units) / 0.016 (coal units) 0.0062 0.0037 0.0035 PM, filterable (mg/dscm) 18 110 250 5.1 (biomass units) / 160 (coal units) 2.5 2.2 230 270 Dioxin, Furans, total (ng/dscm) 0.052 0.58 (no limit) 0.068 0.52 (biomass units) / 5.1 (coal units)  0.090 0.51 1,200 1,800 Dioxin, Furans, TEQ (ng/dscm) 0.13 0.002 0.093 0.011 0.076 (biomass units) / 0.075 (coal units)  0.0030 0.075 31 NOx (ppmv) 23 76 290 (biomass units)/340 (coal units) 290 (biomass units) / 340 (coal units) 200  78 170 SO2 (ppmv) 11 720 6.2 (biomass units)/650 (coal units) 7.3 (biomass units) / 650 (coal units) 38 28 1.2 Emission Limits for New CISWI Sources All emission limits are measured at 7% oxygen. 2 Emission limits did not change from final to reconsideration proposal for this subcategory. 27