Pumping Systems and Day Tanks Presented By Ken Still, CB Kramer 1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
Slide 1 Insert your own content. Slide 2 Insert your own content.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
List and Search Grants Chapter 2. List and Search Grants 2-2 Objectives Understand the option My Grants List Grant Screen Viewing a Grant Understand the.
0 - 0.
1 1  1 =.
1  1 =.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
CS4026 Formal Models of Computation Running Haskell Programs – power.
Patterns and sequences We often need to spot a pattern in order to predict what will happen next. In maths, the correct name for a pattern of numbers is.
Welcome to Who Wants to be a Millionaire
ZMQS ZMQS
Year 6/7 mental test 5 second questions
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Confined spaces What all agricultural workers need to know.
Pumping Systems and Day Tanks
O X Click on Number next to person for a question.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Energy & Green Urbanism Markku Lappalainen Aalto University.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
1, 3, 5, 7, 9, … + 2 TermNumbersPattern of Numbers The n-order for the pattern of odd numbers is 2n – 1, for n is natural numbers n ?
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Properties of Exponents
BeginningNext SlideBack End Program AVADAL 1 of 18 SK-16 Main Pumps 4 Pumps Per Strand – Normally 2 running and 2 on standby as back-up. Motor is 60 HP.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
Presentation transcript:

Pumping Systems and Day Tanks Presented By Ken Still, CB Kramer 1

Agenda Introduction Basic System Generator Pump Selection Boiler Pump Selection Pump Types and Limits Day Tanks Day Tank Accessories Pump and Day Tank Control Conclusion 2

Introduction Pump sets and day tanks typically operate as a single system with a common controller. 3

Basic System 4 Monitoring and Control

Generator Pump Selection 7 gph per 100KW = GPH GPH x # gensets = GPH Total GPH total x 4 = transfer pump size 5

6

Boiler Pump Selection 30gph per 100 BHP = GPH GPH x # boilers = GPH total GPH total x 2.5 – 3 to accommodate boiler mounted pump total flow 7 Typical boiler system selection

8

Typical System w Boiler Pumps Boiler Mounted pump limitations Tight pump suction limits; 15hg – 3psi Boiler pump single point of failure Boiler pumps requires times flow rate (sometimes 10-15x more) from transfer pump 9

10 Typical System w Boiler Pumps

Alternative Boiler System

Pump Types Match the pump to the application Suction or pressure type 12 SUCTION PUMP SETPRESSURE (submersible) PUMPS

Pump Sets Submersible Pumps 13 Pro Submerged suction Simple single tank systems Simple installation Con Pressurized in-ground piping Limited sizes Difficult maintenance Unmanned Piping Monitoring Complicated multi-tank redundant systems

14 Submersible Pump Installation

Pressure Pump System 15 Redundancy Each tank must have redundant pumps

Pump Sets Suction Pumps 16 Pro Buried piping under suction Ease of maintenance Simpler multi tank systems Simple installation Con Limited suction ability Additional floor space

Suction Pump System 17 Redundancy A single duplex pump set satisfies redundancy requirement

Suction Pump Set Options High Pressure 100psi Low Pressure <50 psi 18 mechanical pump set pump set with motor starter panel Pump set with motor starter and logic control panels

Suction Pump Set Construction 19 Pump/motor sets Control panel(s) Gauges Priming funnel Relief valves Flow switch Suction strainer(s) Reservoir base w/leak switch

Suction Pump Set Construction Recommend welding of fuel piping over 1. A threaded pipe retains less than ½ of wall thickness

Piping and Valves Vibration Isolation WRONG 21 Flexible Connectors Fixed to Building Fixed to Equipment

Piping and Valves Vibration Isolation CORRECT 22 Flexible Connector Fix to BuildingIsolation Pads or Springs Fix to Equipment

Basic System 23 Monitoring and Control Day Tanks

Built and certified to UL142 Pressure tested to 5 psi Almost always used on generators Stand Alone Belly Tank Sometimes used on boilers 24

Day Tanks Stand Alone Generator Belly Tank 25

Belly Tanks Completely isolate tank from generator 26 Flexible fuel hose Spring isolation

Independent Day Tanks Double Wall Return Pump Option 27

Independent Day Tanks Single Wall Single Wall w/Tub Type Rupture Basin Available w/o rupture basin 28

Day Tank Accessories Automatic fill manifold Multi-tank applications Sized to precisely match required flow 29

Day Tank Accessories Return Pumps Manipulate tank level to test controls Refresh fuel if it overheats Empty day tank in emergency 30

Day Tank Accessories Accessories Vent Caps Level Indication Level Monitoring Temperature Monitoring 31

Day Tank Sizing No rules or regulations requiring minimum sizes. Some regulations limiting maximum sizes IFC limit to 660 gallons in certain installations Generator KW x.07 x hours desired = tank size Often space dependent 32

Day Tank Construction Fittings in top of tank (except drain) Easy access to all fittings Drop tubes on all supply and returns Keep the inflow away from generator suction Inspection and Extra Ports 33

Primary functions Monitor day tank level Start/stop pumps Open/close fill manifolds Secondary functions Leak detection Communications and alarms Auxiliary controls 34 Pump and Day Tank Controls

Safe Design High voltage separate from low voltage Easy serviceability and compliance to NFPA and OSHAE standards 35 High voltage motor control panel Low voltage logic control not to exceed 49 volts

Pump and Day Tank Controls NFPA 70e 36

Conclusion Sizing – 70GPH per MW or 30GPH per 100BHP Oversizing / Hot Oil Return / BLR Requirements Suction or Submersible (Pressure) Pumps Day Tank (Stand Alone – Base Tank) Construction (Double Wall – Rupture Basin – Connections) Flow Control Manifolds Return Pumps We can help with installation and sizing issues! 37

Conclusion 38 Basic System Generator Pump Selection Boiler Pump Selection Pump Types and Limits Day Tanks Day Tank Accessories Pump and Day Tank Control