As to the current status: It seems that the label for boilers and combi systems will be the first to be implemented. This may be a problem.

Slides:



Advertisements
Similar presentations
DG TREN D4 Pirjo-Liisa Koskimäki European policies on energy efficiency EUSEW 2008 – EUFORES EUROPEAN COMMISSION.
Advertisements

ECODESIGN DIRECTIVE Lots1 & 2 Heaters/Water-heaters
The Remeha µ-chp based on a combi boiler with stirling engine Ir. P.Gelderloos Ing. M.J.Bijkerk.
Introduction to Integrated Library Systems
NY ph: CT ph: Visit: Boilers for Home Heating.
SOLAR for HOT WATER and HEATING Here Comes the Sun - London Solar: heat with care.
Tazzy Smith, Akhona Maliwa, Ella van Geuns, Claudia Schulke.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Vehicle Management System. 2 About BMS Company BMS International Systems Development Ltd. BMS develops and implements sophisticated and easy to use “all-in-one”
Supplier Switching in Electricity and Gas Markets Patricia de Suzzoni Chair of ERGEG Customer Focus Group.
Gauss: Generator Status Patrick Robbe, LAL Orsay, 6 Oct 2009.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Transformation of the Electric Power Industry: Value of Regulatory Impact Assessments Greg R. White Commissioner.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
Consultancy for renewable energy in the built environment Reports on SCF projects Gerard van Amerongen vAConsult (The Netherlands) Las Palmas
Construction Work Packaging
Energy Ecodesign and Energy Labelling of Heaters.
1 CAPRI Prague Meeting CAPRI-Dynaspat, 11./12. April 2005 CAPRI-Dynaspat Project Second Project Workshop Prague, 11. and 12.April 2004.
Legal Framework for Upstream Activities in Ukraine Dr. Irina Paliashvili Unconventional Oil & Gas Conference Kyiv 30 October 2013.
Eurostat F - Break-Out Sessions SDMX RI User Group Luxembourg, September 2013.
A worked example for Denmark using the proposed EU Directive rules Senior Adviser Peter Bach Danish Energy Authority EU and eceee expert seminar on measurement.
Active Solar Heating By: Steven and Evie. How It Works:
T Iteration Demo BitPlayers I2 Iteration
RAILROAD COMMISSION OF TEXAS Alan C. Mann Oversight and Safety Division September 2015.
Managing Change 1. Why Do Requirements Change?  External Factors – those change agents over which the project team has little or no control.  Internal.
Entering Contracts in CLIP. CLIP has tools to make Data better  Force people to enter in the information that they are supposed to enter.  Color code.
PRJ566 Project Planning and Management Project Management Concepts 1.
Standards for Electronic Business Transactions in the Restructured Electricity Industry Presented to The Committee on Finance and Technology National Association.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
1 System planning 2013 Lecture L9: Short term planning of thermal systems Chapter Contents: –General about thermal power –Production cost –Start.
A tour of new features introducing POWERPOINT 2010.
PERNOD RICARD WINEMAKERS Sustainable initiatives and engaging supplier support May 2015.
Introduction What is detector simulation? A detector simulation program must provide the possibility of describing accurately an experimental setup (both.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Clean Energy Incentive Program Michigan Energy Optimization Collaborative October 20, PRESENTATION.
Update on Ecodesign vAConsult Gerard van Amerongen SKN meeting Paris October
1 Policy and good practice requirements Time line Disaster/ emergency Emergency shelter Transitional shelter Permanent reconstruction.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
T Project Review WellIT I2 Iteration
PROCUREMENT UNDER THE PROJECT National Electrification Project.
Update on Liaison vAConsult Gerard van Amerongen SKN meeting Paris October
1 CPCP Hisham Khartabil XCON WG IETF 59, Seoul
Project management Topic 8 Configuration Management.
- GDML - ROOT I/O for Geant4 - General Suggestions SFT Program of Work Meeting Witek Pokorski 03/03/2010.
News and Status WLCG Information System Task Force Maria Alandes IT/SDC.
JUNO English CDR Hu Wei. Introduction Tortoise SVN  We use SVN to manage JUNO English CDR.  Advantage: older or the latest CDR version will be preserved.
Vehicle Management System. 2 About BMS Company BMS International Systems Development Ltd. BMS develops and implements sophisticated and easy to use “all-in-one”
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
ITIL Training Observations Rick Kwarciany 12 November 2013.
André Van Varenberg – Tel Aviv , 6 November 2016
Supporting quality devices
the following benefits: documents contained within a PDF Package
LATEST UPDATE IN LATVIA
STATE ENERGY AND WATER REGULATORY COMMISSION
André Van Varenberg – Tel Aviv , 6 November 2016
CEN/TC312’s Liaison to CEN/TC164 Short Update as of October 1st, 2017
Energy labelling: Next steps
Call to Fix Dell Printer Error Code
Gerard van Amerongen Oktober, 2017
Gerard van Amerongen vAConsult
خطوات البحث العلمي.
Label Name Label Name Label Name Label Name Label Name Label Name
Does it have a timer & thermostat? START
MyStatLab Instruction
Working Group on Public Health Statistics Luxembourg, 26 November 2015
Installation of New Officers
Proposed Replacement of 8800PPH Steam Boiler ( )
Thing / Person:____________________ Dates:_________________
Expert Group on Delegated and Implementing Acts for the ESI funds
Presentation transcript:

As to the current status: It seems that the label for boilers and combi systems will be the first to be implemented. This may be a problem since for combi systems you need Lot 2?? In the latest version for boilers, there is a surprising change introduced: a supplier of both solar and a conventional boiler is now allowed to label the package. This was limited to the dealer / installer. Currently we are waiting for the commissioner to make the working documents a formal proposal. The last obstacle is a protest from EHI: Max. label class for gas boiler must be A and the efficiency should be mentioned on the label. The commission seems to move in their direction, but it does not have much consequences for our business. There is no formal new date for the implementation. We are just waiting for Outinger. Best regards, Gerard van Amerongen vAConsult