News from the Pellet target

Slides:



Advertisements
Similar presentations
Supervisory Control & Data Acquisition DAQ Networking.
Advertisements

Tangent Sterilizer PC Interface System Description System Architecture System Pricing.
Multi Instruments Data Acquisition Software Evolution
Data acquisition and control system for HEDP experiments on FAIR and GSI. A. Kantsyrev 1, D. Varentsov 2, A. Hug 2, S. Udrea 2, L. Shestov 1, V. Turtikov.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Astronomical Array Control & Acquisition System at NAOC Zhaowang Zhao Binxun Ye Research Labs for Astronomy National Astronomical Observatories, Chinese.
FOLLOWER SENSORS AND ACTUATORS EE 552 INTSTRUCTOR :Dr MOHAN KRISNAN BY MOHAMMED KASHIF IQBAL ANESH BODDAPATTI UNIVERSITY OF DETROIT MERCY.
Logic Analyzer and pulse generator ECE 682. The specification Specification was handed out in ECE 582 last quarter. Basics  3 channels – dedicated output.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
Data acquisition system for experiments at GSI HHT experimental area. A. Kantsyrev 1, D. Varentsov 2, A. Hug 2, S. Udrea 2, L. Shestov 1, V. Turtikov 1.
High-Intensity Focused Ultrasound Therapy Array May1005 Alex Apel Stephen Rashid Justin Robinson.
University of Bergen public domain software: SEISLOG Linux, data-acquisition system for standard PC and embedded lowcost, low-power solutions Terje Utheim.
NETWORK CENTRIC COMPUTING (With included EMBEDDED SYSTEMS)
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
A Company Selling Technology and not just a Product.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
How to count PMT pulses Victor Kornilov Sternberg astronomical institute I count photons 25 years.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Implement An Online Management System for PBX Presented by: Bui Phuong Nhung Advisor: Dr. Wei, Chao-Huang.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Presentation: Phidgets for Rapid Pervasive Prototyping Applied Pervasive Computing.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Hardware Introduction – Standard vs Q.i
HIE REX / ISOLDE New Instrumentation electronics - Main functionalities - S.Burger BI-PM
Master Slave Arm System for Telepresence T. Khalil.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Introduction to TwinCAT 3.1 and EtherCAT in the context of VLT Instrumentation Control.
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
Development of a pellet tracking system for PANDA and WASA Goal:  know interaction point with a few 100  m accuracy in 3d(xyz). Method: Track pellets.
Serial / Ethernet Converter - IE-CS-2TX-XRS232/485
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Components of Mechatronic Systems AUE 425 Week 2 Kerem ALTUN October 3, 2016.
O.I.Brovko, A.V.Eliseev, I.N.Meshkov, E.M.Syresin (JINR)
PADME Front-End Electronics
National Centre for Nuclear Research, Poland
P.Fedorets on behalf of the Pellet target group
Novosibirsk, September, 2017
Oleksiy Dolinskyy December 1st, 2014
Status of the pellet target at ITEP
Diagnostic & Control Status
Instrument Control Systems 2014
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
One-Stop Solution for Device Networking
ATF/ATF2 Control System
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
Summary of activities of the pellet target development
Development of the pellet target in ITEP
352MHz Klystron Control for the 3MeV Linac test stand
Data Acquisition Systems
Project Members: M.Premraj ( ) G.Rakesh ( ) J.Rameshwaran ( )
NI-sbRIO BASED PLATFORM FOR REAL TIME SPECTROSCOPY
MVL-supported Virtual Instrument Specifications
Status of the CERN ALIBAVA System
Front-end electronic system for large area photomultipliers readout
AQT90 FLEX Service Training
Status of muon monitor R&D and construction
Advanced Research Electron Accelerator Laboratory
Pellet Target developments
Pellet target developments at ITEP
Pellet Target developments
Automatic operation IR rework system Automatic Component placement 2 x K-type thermocouples IR-pyro sensor RPC-camera.
Presentation transcript:

News from the Pellet target A.Gerasimov, V.Chernetsky, M.Büscher, P.Fedorets, A. Kantsyrev, E. Lushchevskaia, V. Panyushkin, A. Bogdanov, A.Dolgolenko, P.Balanutsa, E.Ladygina, L.Gusev, S.Mineev, I.Tarasenko, V. Demekhin, S.Makagonov, D.Bogachenko, N.Kristi, V.Karasev Institute for Theoretical and Experimental Physics named by A.I. Alikhanov of National Research Centre «Kurchatov Institute» Moscow, Russia PANDA Meeting, Stockholm, June 04-08, 2018

Current activities Advanced data acquisition with PLC Development of the adjustment system Transfer of the first prototype from FZJ to ITEP Preparation of the draft of the TDR

Data acquisition system for target (first version) Gas flow control Remote controlled system via TCP/IP sockets Delphi XE2 language software for Windows PC Local Hard disk data saving Temperatures Heater control Pressure

Data acquisition with Programmable Logic Controller (working prog.) Using of PLC provide stable, autonomous readout and store of pellet target parameters to MySQL database ICPDAS XPAC XP8041 PLC Controller (Windows Embedded (Framework 4.0) + MS Visual Studio 2015) Pressure readout Pfeiffer TPG256 Database on Ubuntu Server MOXA Nport 5450 RS232 to Ethernet converter TCP/IP Sockets protocol SQL request Ethernet C# program One week test (reading repetition rate - 4 sec) with Windows Embedded on PLC . . . . . PHP, WEB interface Other devices

New software for delay and piezo generators Signal generator Rigol DG4202 for piezo rings Delay generator Stanford DG645 for backlighter Ethernet interface Delphi XE2 software Signal amplifier TABOR El. 9100 Signals 10 ns – 1 ms Delphi XE2 software Signal to piezo rings : Amplitude: up to ±100 V Frequency up to 1 MHz Piezzo Ring (installed on to holder of nozzle) Driver for Powerful LED LUXEON V-Star

LED backlighter + multi-pulse mode Parameters MOSFET driver scheme Powerful LED LUXEON V-Star (800mW) Min exposure: 100 ns Power supply 30 V 5 pulses with duration 300 ns each, repetition rate 1 MHz Posibility of visualisation of pellet movement at one image Light signals obtained by Hamamatsu R760 photomultiplier Lenses -Sigma DG APO Macro 180 mm f/ 2.8

Development of the adjustment system Idea: MDC Vacuum BLM-133-1-03 UHV linear actuator (proposed) Movement by stepper motors, 3 µm linear steps Onitex OSM-42R controller

Test of the adjustment system elements System of linear actuator + stepper motor operated via L-CARD E14-140 controller for four axes: 4 stepper motors – already delivered Test with L-Card controller and Delphi prog. – passed Mechanical production – in progress USB L-CARD - controller

Articles preparation In preparation - ”Development of data acquisition and diagnostic system for PANDA pellet target”, Journal: “Instruments and Experimental Techniques” (Scopus) end of 2018 or 2019 year.

Transfer of the first prototype from FZJ to ITEP Truck with the first prototype of the Pellet target arrived ITEP on 28 May.

Transfer of the first prototype from FZJ to ITEP The transfer was succeeded on 28 May 2018 With the parts from the first prototype the configuration of the second prototype will be completed Preparation of the draft of the TDR Writing of the draft of the Pellet target TDR is going on. The prototype is not completed. Some tests for TDR can not be performed. Waiting for transfer from FZJ. R&D studies are not finished. Some results are still absent.