Clean Coal Technology Liquid Coal as Coal Water Mixture (CWM) Presented by Sukhdev Singh, Adviser on CWM 1For NTPC.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Emissions Inventory: India & China Assessments P.R. Shukla.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
EuroCondens SGB E.
Worksheets.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Demonstration Problem
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
UNITED NATIONS Shipment Details Report – January 2006.
1 When you see… Find the zeros You think…. 2 To find the zeros...
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
CALENDAR.
1 1  1 =.
5 th - Number Sense. 1. Which is the same as 13? A B. 10 × 3 C D. 1 × 3.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
The 5S numbers game..
World energy economy at a glance Uri Barenholz Weizmann institute of science December, 2011.
Decision Making and Relevant Information
CONTENTS Hedging Tools (slides 2-5) Swap (slides 7-17)
ACC 3200 Chapter 3: Process Costing Process Costing.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Break Time Remaining 10:00.
The basics for simulations
An Impact Analysis of Electrifying Florida’s Public Buses
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
Introduction to Cost Behavior and Cost-Volume Relationships
Buckeye Wood Energy Converting Waste Wood Into Energy.
Carbon Capture & Storage: Why we need a campaign against Longannet Mandy Meikle Scotland Against New Coal Scottish Climate Camp 13 June 2009.
Maximizing Investment Recovery on Power Plant Closures Gregg Epstein Perry Videx. LLC May 10, 2013 New Orleans, LA.
Cost-Volume-Profit Relationships
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Biomass Cogeneration in ASEAN, GHG Mitigation Potential and the Barriers Dr. Ludovic Lacrosse, Arul Joe Mathias EC-ASEAN COGEN Programme UNIDO Expert Group.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sprayer Economics Gary Schnitkey University of Illinois.
Progressive Aerobic Cardiovascular Endurance Run
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Example of a Decision Tree Problem: The Payoff Table
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Numeracy Resources for KS2
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Number bonds to 10,
The Global Village The world is a crowded place. As of today the world’s population is 6,600,000, countries have more that 50 million people. 11.
Managing Economic Exposure And Translation Exposure 12 Chapter South-Western/Thomson Learning © 2003.
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
PSSA Preparation.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Determinants Investment Why Businesses Invest?. Building Capital Investment involves sacrifice (on someone’s part) To invest –We must work more –We must.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Clean Coal Technology Liquid Coal as Coal Water Mixture (CWM) Presented by Sukhdev Singh, Adviser on CWM 1For NTPC

Table of Contents History What is CWM? Making CWM Properties Advantages Making slurry from lignite Disadvantages Facts Vs Facts Comparative Study Live Examples CWM Ball Mill Business potential in India Way Forward 2

History 3 In 1970, world wide oil crisis accelerated the development of CWM as an alternative fuel and many countries researched on CWM. In 1980 CWM technology began to be applied for spectrum of Industries Today there are more than 100 plants based on CWM as fuel and running successfully across the world and producing around 75,000 MW. These are new as well as retrofitted plants. Single units range from 1 to 600 MW China Japan Russia Italy Indonesia Philippines Malaysia South Korea

What is CWM? A mixture of 66-69% micromesh coal plus 30-33% water and 1% additives Rheological properties like oil Stored like oil Stability of days and more Easy to transport in tankers, pipe line & sea vessels 4

Making CWM Wash the Coal Crush Pulverize in Ball Mill, add Water & Surfactants Put in the agitator Filter CWM Slurry Add stabilizer & put in agitator again Put required additives & agitate again Transport to Storage Tanks 5

Properties of CWM Consistency - solids 66±2 % Viscosity - (100S) 1200±200 M Pa.s Average granularity – 4 38 Micron Ash content < 7 % Sulphur content <0.5 % Volatile matter % Calorific value Kcal./Kg Stationary phase days – can be extended 6

Advantage of CWM Environment Friendly- Vs -Coal Environment Friendly- Vs -Coal Nox Levels are reduced by 50% Sox Levels are reduced by 80% SPM Levels are reduced by 40% CO2 Levels are reduced by 15-20% CDM benefits shall be there Compared to coal Compared to coal Combustion efficiency is >99% against combustion efficiency of 90-91% for coal Boiler efficiency is 94 % as compared to 90-91% for coal fired Boilers Damage to Water walls is less Soot formation is less ESP is much smaller Cost of generation of 1KWh is less than Coal selectively Other reasons Other reasons Land required 70-80% less Cost of plant is less as very little coal handling No major ash handling as ash is 6-7% Low O&M cost More fuel inventory possible for emergency Neat and clean plant Completely safe to handle No fear of thefts days or more self life Loading and unloading time is less Lignite can be extensively used for Coal slurry (explained in next slide) 7

88 Making slurry from Lignite

Disadvantage of CWM Uses high CV and Low ash Coal but lignite can be used to make slurry. Since ash content in Lignite is low, the slurry can be of good quality CWM cost is higher than pulverized fuel coal Technology is restricted but available CWM facility needs additional investment but overseas companies can supply CWM like Coal Loss of 200 Kcal on account of water Content 9

Facts Vs Facts 10 ParameterImp. CoalFurnace OilF Grade CoalMix (Imp & F grade) CWM Sale PriceRs 8.5/ kgRs 32/KgRs 0.85/KgRs 4.65/KgRs 7.85/kg FreightRs 1.5/ kgIncludedRs 1.5/KgIncluded Ash Content10%0.5%40%31%7% Heat Value6300 Kcal10,000 Kcal3000 Kcal3320 kcal4800 Kcal Heat Loss (a/c storage etc) 400 Kcal Kcal Coal for CWM0.7 kg---1 kg Station Heat Rate 2300 Kcal Additional cost to make CWM ----Rs 0.85 Cost of 10,000 Kcal Rs 16.90Rs 32.00Rs 9.00Rs 13.40Rs Cost Per UnitRs 3.90Rs 7.3Rs 2.07Rs 3.82Rs 3.92 Savings w.r.t CWM Rs 0.02 Rs % Savings 0.5%46.3%---

Comparative study 11 ParameterImp. CoalFurnace OilF Grade CoalMix (Imp & F grade) CWM Cost Per UnitRs 3.90Rs 7.3Rs 2.05Rs 3.82Rs 3.92 Cost/Kg AshRs 0.15-Rs 0.60Rs 0.46Rs 0.10 Land/MW1 Acre0.3 Acre1 Acre 0.3 Acre PollutionLessLeastMaximumLessLeast O & M CostLessLeastMaximumLessLeast Aux PowerMaximumLeastMaximum Least SafetyLeast Less Maximum CDM BenefitsMay beYesNo Yes Logistics /Convenience LessBestLess Best Heat Efficiency (approx) 37%39%35%36%38-39% What looks better?- Let us think together

Live examples 12 CWM plant in China CWM Storage

CWM Plants in operation 13 CWM Power Plant (1.5 Mt/a for 2×670t/h boilers) – New Plant Power Plant (0.6 Mt/a for 3×230 t/h boilers transformed from burning oil to burning CWM)- the first power plant in China to use single CWM as fuel Power Plant (1.5 Mt/a for 2×220 t/h +2×410 t/h boilers transformed from burning oil to burning CWM)- the demonstration project using the largest CWM preparation and burning system in China

CWM manufacturing Ball Mill 14

Business Potential in India- Captive Power Generation Captive Power plants in India- 20,000 MW Diesel /FO based Power Plants MW CWM required for 7000 MW- 35 Million tonne/annum- (Valued at $170/tonne) Business Volume: $8500 million /Annum Profitability: 10% ( $850 million / Annum) CDM benefits shall be there to end users 15

Proposed Plan – Way forward 16 To introduce use of CWM in national planning in place of OIL and Coal where ever possible as is the case in China To establish R&D on CWM Center in association with reputed companies in the world To create service organizations as JV with technology/ equipment suppliers and laying of slurry pipe lines To make detailed Project Study/Report on CWM & take action accordingly

Thanks 17 Sukhdev Singh-Advisor on CWM Mobile: Questions ?