Hybrid & Module Testing Status

Slides:



Advertisements
Similar presentations
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Advertisements

1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
UCSB Hybrid Bonding & Testing
Hybrid & Module Testing Status
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hamburg Bonding Report
Results from module testing
US Module Production Quality
Vienna Module Production
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
UCSB Qualification Module Grading
Module Production in Brussels
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Module Testing Status Week of 6/14-6/20.
Noise in TOB modules and sensor quality
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Status of 44 ARCS tested TOB modules, June 24, 2004
FNAL Hybrid Testing Status
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Hybrid & Module Testing Status Week of 5/2-5/6

UCSB Hybrid Testing Status Weekly Cumulative   Pass Fail % Pass L12pd 0.00% L34p 368 5 98.66% L56p 19 385 98.72% R5N 9 1 74 3 96.10% R5S 41 88 96.70% R6 87 98.86% R7 Total 69 4 1002 17 98.62% Failing Hybrids Over-counted

UCSB Hybrid Testing Failures This Week 4 with shorts in PA Lithography errors-fixable Cumulative 7 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds 2 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 2 with unknown failure

UCSB Hybrid Testing Issues Need to finish validation of new software Bruno contacted about bugs/features Need to add automatic upload of data to new software Hybrids with shorts need repairing Once repaired need to keep bookkeeping straight

UCSB ARCS Testing Status Weekly Cumulative   A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 85 1 98.86% L56p 54 331 2 99.40% R5N 38 97.50% R5S 17 100.00% R6 20 88 R7 Total 91 560 3 4 99.29%

UCSB ARCS Testing Failures This Week None Fixed 1 module Found the problem with another Fixable Cumulative 1 with >2% Bad Channels Debris on sensor 1 Bad DCU Fixable, soldering problem 1 HV Shorted to CF Frame FIXED!! 2 with >20 mA Bias Current 1 leaky pinhole 1 scratched sensor

UCSB ARCS Testing Issues Need to confirm cuts on TEC modules Getting some confusion between 1SO/2SO Have not produced TEC R6 modules in a year Still need to validate ARCS 8.0 Currently using ARCS 7.2bugfix

UCSB LT Testing Status Weekly Cumulative Pass Fail % Pass L12pu 0.00%   Pass Fail % Pass L12pu 0.00% L12pd L12su L12sd L34p 84 100.00% L56p 59 318 R5N 1 40 R5S R6 45 88 R7 Total 105 530