RAD Evolution Workshop Outcome

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Draft Concept of Operations (CONOPS) for CS#1- FAS Centralised service on Flight Plan and Airport Slot Consistency (FAS) Matthis Birenheide Project Manager.
Hans Koolen NMOC/CFMU Network Operations Services
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Free Route Airspace in DK/SE FAB
Traffic Management and FUA integration
Peter Matern Head of ADM Unit 30/01/2014
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002 NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
PROPOSALS THE REVIEW OF THE 1958 AGREEMENT AND THE INTRODUCTION OF INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA) IWVTA Informal Group WP th Session.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
18 March th meeting of the Evaluation Expert Committie 1 Thematic Working Group „Ex post Evaluation Guidelines” State of play Jela Tvrdonova.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Learning More About Oregon’s ESEA Waiver Plan January 23, 2013.
GCE Software Systems Development A2 Agreement Trial Implementing Solutions October 2015.
BUDGET 4Distribution of budget per phases of the project; 4Itemization of budget; 4Division of budget per source of contribution; 4Division of budget between:
1 Package on food improvement agents Food additives Food enzymes Flavourings Common procedure Developments since earlier consultation.
Stages of Research and Development
OICA „Certification of automated Vehicles“
WP4 Models and Contents Quality Assessment
POST APPROVAL CHANGE MANAGEMENT PROTOCOLS IN THE EUROPEAN UNION
GCE Software Systems Development
Collaborative Decision Making (CDM) Saulo Da Silva
Public Consultation : main conclusions (1/2)
American Institutes for Research
NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES
Introduction of TBO within OptiFrame
Digital NOTAM Towards a concept of operations
Transforming Grading Robert Marzano
Supplementary Document
Alignment of Part 4B with ISAE 3000
Software Measurement Process ISO/IEC
FUA Restrictions Flight Plan Buffer Zones
ICAO AFI Plan African ANSP Presented by: ESAF Regional Office
Transmitted by the expert
Publication specialties and how to flight plan
USOAP Continuous Monitoring Approach (CMA) Workshop
Supplementary Document
RAD evolutions workshop 2018
CFSP’s view on the current RAD
Legal framework of territorial classifications and typologies for European statistics – state of play NUAC meeting, Brussels June 2015 Gorja Bartsch.
RAD in DFS – information for external stakeholders
SAS & RAD Jens Albek Operative Route Analyst
RAD Evolution Workshop Network Approach to the RAD - DP/4
Alignment of Part 4B with ISAE 3000
AIM Global Strategy Air Navigation Procedures for AIM Seminar
RAD Evolution Workshop Purpose of the RAD and evolutions to-date
Item 7.5 (2012-ETS-16) – Statistics on Special Needs Education
IAESB Meeting IFAC Headquarters, New York July , 2018
RAD Evolution Workshop RAD Purpose and evolutions to-date - IP/1
RAD Evolution Workshop Current RAD status
IMPROVING PUBLIC INFORMATION
RAD Evolution Workshop Current RAD status - DP/2
Updating the Article 6 guide Outline of envisaged changes
RAD Evolution Workshop
Supplementary Document
RAD Evolution Workshop
RAD Evolution Workshop Network approach to the RAD - DP/3
Welcome to the CSBM operational workshop:
AICT5 – eProject Project Planning for ICT
Assessing Students With Disabilities: IDEA and NCLB Working Together
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

RAD Evolution Workshop Outcome RAD WS 12 - 13 DEC 2018, Brussels, Belgium

RAD Evolution Workshop Outcome Detailed evolutions - Operational and technical RAD WS 12 - 13 DEC 2018, Brussels, Belgium

RAD Evolution Workshop Content and Structure Appendix 3: Change as from RAD1902 splitting the Column “City Pair” into 3 new Columns. Appendix 5: Further adaptation and publication of the general limits via new xls file, for non-B2B users Appendix 7: Continuation of adaptation of data between RAD and CACD. Next report expected in FEB 2019. Restriction Structure: CFSPs and AOs are encourage to report difficulties on restrictions definition to be structurally resolved; Reminded that introduction of FRA via RAD is based on volume, point and border referenced restrictions. CFSPs were requested by AOs to accelerate implementation on volume based restrictions in their systems. Re-consideration, simplification and harmonisation of the restrictions structure rules and expresssion definition of the restrictions Restriction Content / Length: CFSPs and AOs are encourage to report difficulties in case of complicated and long restrictions to be structurally resolved; addressing of those issues to progress through regular RAD CDM processes. Dependent Applicability: CFSPs and AOs are encourage to report difficulties in case of “problematic” multiple or single dependent applicability in order to be structurally resolved. addressing of those issues to progress through regular RAD CDM processes. Re-consideration of the processes related to RAD restrictions defined as “mandatory when available” pushing flights into areas made available for civil use through UUP and resulting in a loss of the ATFM slot RFL Use and Processing: Consider the inclusion of a “flight type” definition that would not be subject to RAD restrictions; Reference to any issue related to RFL explanation - NM Flight Planning Requirements - Guidelines.

RAD Evolution Workshop Suggestions for possible NM System improvements “Vertical” Dependent Applicability Purpose is to accommodate FUA and FRA adequately and handle FL sensitive dependent applicability based on multiple FL activations. Restrictions on intermediate SID/STAR connecting point Currently no way of encoding such connecting point to be only available for certain traffic routeing only. Group Points Group of points concept, similar to the way in which group of airfields is done in RAD; Possibility of several significant points to be classified into a single group; Currently considered by (in old CR) as part of TV model. Possible incorporation in RAD requires discussions and approval by RMG. Point Usage (non-FRA) Ability to automatically encode points dependent upon their usage. RAD Analyses Tool Analysis of RAD restrictions - to have a means of gauging the ‘hit rate’ of various RAD restrictions to assess whether they are still required (it may be this is already possible). All suggestions will be further considered and studied by the NM and relevant reports will be provided.

RAD Evolution Workshop Other Suggestions RAD Improvement / Reduction - be possible by ANSPs in case of appropriate and improved flight planning (no turns, sectors…..). PTRs - if are optional for the AOs to be considered they shall only be applied after validation of the trajectory. RAD WS be followed up by a series of smaller workshops to develop best-practices and blue prints between RAD experts from ANSPs and algorithm specialists from CFSPs under facilitation of NM.

RAD Evolution Workshop Outcome Process Evolutions RAD WS 12 - 13 DEC 2018, Brussels, Belgium

Outcome Re-define the CDM process on the acceptance of proposed RAD restrictions in accordance with the justification, assessment results and objective goal of the proposed RAD restrictions; Assess the need, the effect and traffic impacted by the request to have new RAD restrictions introduced; Define a new process for the “Last minute” changes: Perform assessment of the proposed RAD restrictions and subsequently proposed “Last minute” changes; Allow exemptions in the “Last minute” changes eligibility criteria. NM/ States / FABs / ANSPs to establish a post-ops process to continuously re-evaluate the existing RAD restrictions and if additional justification not provided to ask for that RAD restrictions suppression; Propose simplification of the RAD restrictions: Collapse multiple RAD restrictions in one network RAD restrictions with the same effect; Evaluate and propose suppression of RAD restrictions constantly not respected on ATC; Define network oriented RAD restrictions together with concerned States / FABs / ANSPs, after the provision of clear objective goal and justification for RAD restriction implementation; Propose structural airspace changes to eliminate the need for RAD restrictions; The final content of any amendment to the RAD shall be positively agreed between the NM RAD Team and State / FAB / ANSP concerned; Define the requirements and gradually implement an enhanced pre-validation process supported by automation to allow better validation and flight planning processes; The new RAD CDM processes defined shall take fully into account the new technical support being implemented through AURA@n-CONECT as from 2019; Define enhanced promulgation processes for the RAD relaxation; Aim to define and implement the new RAD process through the NM CDM Processes before the Summer 2019.