Pre-contract risk- based assessment of contractors

Slides:



Advertisements
Similar presentations
Background Presenters Work done in preparation for WHS changes
Advertisements

Contents Introduction and Background The Objective Recommendations
Legal Liability and the Manufacturer: The duty to inform Jaco Swartz 24 October 2012.
11 Invitation For Bids (IFBs) – (Non-Rolling Stock) – (Rolling Stock) Offer of a Usable Property Term Sale –Government determines property.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
Contractor Safety Management
Abbreviations COP Code of Practise FOP
Risk management. Berliner Energieagentur GmbH Risks of EPC Equipment transfered into the property of building owner at the moment of installation and/or.
Safety and Environment Management Plans for Construction Contractors Daryl Browne – Senior Project Manager Duncan Cross – WHS Manager Darwin Convention.
UKAS Key facts National Accreditation Body in the UK Self-funding private company limited by guarantee (Non-profit distributing) 180 full time staff.
Itemized Cost Estimates ©2002 Dr. Bradley C. Paul.
LEGAL ASPECTS OF GLOBAL BUSINESS: PROTECTING YOUR BUSINESS INTERESTS Tyler T. Ray, Esq. Duffy & Sweeney, LTD
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
K RIEL C OLLIERY Anglo Coal Contractor Management.
Road safety audits on mining operations Damir Vagaja Manager Mining and Resources ARRB Group.
Managing Your Energy Portfolio In A Greener World January 18 &19, 2007.
ISO Registration Common Areas of Nonconformances.
Table of Contents glencoe.com EXIT. Chapter 1 What Is Entrepreneurship? HOME EXIT Chapter 2 Your Potential as an Entrepreneur Chapter 3 Recognizing Opportunity.
Atayat Adedamola Pascal David. Overview What is chevron History About chevron Risks faced by chevron The management Conclusion Questions.
Common Challenges in Project Delivery. A Note on Terminology… Owner / Client – The buyer, purchaser, receiver of services – Includes: Procurement Operations.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
MINING FOR THE NATION CONTRACTOR MANAGEMENT. MINING FOR THE NATION MATLA COLLIERY NEW CLYDESDALE COLLIERY ARNOT COLLIERY GLISA COLLIERY.
W LTI Final report Shipyard Mokpo Korea / 2013 Steel Plate Dropped Incident Investigation.
PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.
Clarification Meeting: Drifling and Testing of boreholes and Water Reticulation design and Construction for the relocated communities at Kusile Power Station.
1 Supply Chain Network Fenland District Council Workshop 1 “Winning contracts with your EMS” >Funded By>Delivered by>Partnered by.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
MANAGING HSE IN CONTRACTS 2016 GU140 (C9). 01 PR1171 PART I & PR1171 PART II Contract HSE Management – Mandatory for CH and Contractor 03 PR1997 Contractor.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
California Water-Conserving Plumbing Fixtures Law
St. Lawrence Fluorspar Project St
Business Services Marketplace Update
Principles of Information Systems Eighth Edition
Subrecipient Monitoring
Start Why ISO In WWM CRC?.
Wisconsin Weatherization Program
Danske Maritime Medlemsmøde
Administration of a FIDIC Contract - Pre-Contract Phase -
Administrivia Settings Controls Attendees Record
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
AMT Toolkit for MCM Sales
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Developing a Business Plan for your Agricultural Operation
Life Saving Rules-Do it Right!
Workshop ESF and tendering 11 October 2006, Brussels Directive 2004/18/EC Tendering of public contracts Robert Wein, European Commission Disclaimer:
Contractor Control system
Pre-contract risk- based assessment of contractors
Contractor Control system
Engineering Project Tendering.
General Contract Management Structure
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
Japan’s proposal for security regulation
Energy Conservation Program Update
Red and Yellow Card System
Contractor Control system
Red and Yellow Card System
THE EMPLOYER Right, of access to the site.
General Contract Management Structure
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Best Practices: Administrative Controls
The project´s specifications, and the connection between the contract´s different specifications.
General Contract Management Structure
ERUPT Lennard de Klerk Moscow, 27 May 2004
Evaluation by Best Value for Money Methodology
Welcome to the Contractors Management Workshop
Due Diligence In Waste Service Procurement Greg Freeman.
1. Why Marketing Research?
Competitive Dialogue/Competitive Procedure with Negotiation
HVAC Marketing | Elite HVAC Contractors
Welcome to the Contractors Management Workshop
Presentation transcript:

Pre-contract risk- based assessment of contractors Reg de la Hunt

Pre-contract risk- based assessment of contractors CONTENT Background / reasons for pre-contract risk-based assessments Benefits when conducting pre-contract risk-based assessments Methods and processes for pre-contract risk-based assessments Energy Coal – Ingwe Collieries Ltd 17/04/2019

Pre-contract risk- based assessment of contractors The why SOME OF THE REASONS FOR ASSESSING CONTRACTORS PRIOR TO CONCLUDING A CONTRACT Selecting the contractor with lowest tender price (usually because they are not fully aware of the mine’s SHEQ, technical and legal requirements) Selecting contractor with most influential sales / marketing person This result in: Contractor arrives on site with equipment and personnel not complying with mine’s SHEQ, technical and legal requirements Contractor must use contract time to get equipment and personnel compliant Contractor becomes a major risk Energy Coal – Ingwe Collieries Ltd 17/04/2019

Pre-contract risk- based assessment of contractors The benefits SOME OF THE BENEFITS FROM ASSESSING A VENDOR / CONTRACTOR PRIOR TO CONCLUDING A CONTRACT Contractors tendering are fully aware of mine’s SHEQ, technical and legal requirements (conduct a self-assessment) Contractors can structure their tenders according to SHEQ, technical and legal requirements Contractors tendering for a specific contract are measured equally Contractor arrives on site with equipment and personnel that comply with mine’s SHEQ, technical and legal requirements Contractor can start immediately Contractor becomes a lower risk Energy Coal – Ingwe Collieries Ltd 17/04/2019

Pre-contract risk- based assessment of contractors Methods / processes (EBMS) Energy Coal – Ingwe Collieries Ltd 17/04/2019

Pre-contract risk- based assessment of contractors On-line vendor accreditation Energy Coal – Ingwe Collieries Ltd 17/04/2019

? Pre-contract risk- based assessment of contractors Energy Coal – Ingwe Collieries Ltd 17/04/2019