Wirebonding UCSB FNAL Machines

Slides:



Advertisements
Similar presentations
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Advertisements

Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
Module 7A Presentation of ideas Estimated time: 5 minutes per idea.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
 $10.65 x 40 = $  $ x 50 = $21,
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Warm-Up Oct.27 Solve the following: Find 20% of 320.
A Breakthrough… Time Machine Evidence. Overview… VISIT TODAYVISIT TODAYVISIT.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Parts of the Clock Click on the minute hand. Click on the clock’s face.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Three Minute Timer Two Minute Timer One Minute Timer
UCSB Hybrid Bonding & Testing
FNAL Production Experience
Hybrid & Module Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Project Status Review Purpose: To anticipate prototype performance
Job Costing, Overhead Calculation and Flow of Costs
Discoloration of Passitivation
A B A B C D C D A B A B C D C D A B A B C D C D A B A B C D C D
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Hybrid & Module Electrical Testing
OGP Surveying & DB Entry
Accounting for Inventory
مديريت موثر جلسات Running a Meeting that Works
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Accounting for Inventory
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
2 Hours Minutes Seconds Insert Text Here.
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
2 Hours Minutes Seconds Insert Text Here.
Presentation transcript:

Wirebonding UCSB FNAL Machines K&S wirebonders: Currently 3 at FNAL and 1 at UCSB – Model 8090’s USCB purchasing an 8060 for hybrids: smaller, much cheaper Timing: FNAL regained the record from UCSB! Estimates with 2 persons working (1 operator + 1 support tech.) Modules: <10 minutes each Hybrids: <7 minutes each

Recent Example of Actual Times UCSB Production of 10 modules (2003 ST sensors) 4 plates run in 5 hours (3 x 3 + 1 x 1) Wirebonded in < 2.5 hours (one person) Tested in 4 hours (one person)