Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Heat Treating Facilities - Quenching  The purpose of quenching is to control the normal metallurgical transformation that occurs when metal is cooled,
Fluid Mechanics.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
HYDRA-PNEUMATIC HAMMERS. Hydra-Pneumatic Hammer 1 Basic working principles of the Hydra- Pneumatic Hammer 2 Technical Characteristics of the Hydra-Pneumatic.
Vibration Monitoring and Machine Protection Systems 1010 E. Main St., League City, TX Phone: Fax: /
Nick Chumo Addy Hellebusch Matt Kelley Chris Williams.
Coastal Region Tornado Damage March 15, Plant McIntosh Steam Damage Notes verbatim from steam plant log book Bad lighting strike on unit. Mw’s dropped.
Incorporated Administrative Agency Japan Nuclear Energy Safety Organization 1 Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa.
ACADs (08-006) Covered Keywords Components, functions, operation, Auxiliary feedwater, Startup, hot standby, plant cooldown, emergency. Description Supporting.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
ACADs (08-006) Covered Keywords BWR, main steam, piping and instrument drawing, functional operating sketch, flowpath, interrelationships, safety relief.
Connecting to industry 1. 2 Safety Break-away Couplings.
Vibration Monitoring & Machine Protection Systems Copyright 1999, Frank Howard, STI Vibration Monitoring, Inc. League City, Texas USA Reciprocating.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Nuclear Power Dylan Waybright Kendall Caminiti Gina Raimondo Susan Ellington Paige Urbanovsky.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
Worldwide Commercial Energy Production. Nuclear Power Countries.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Nuclear Power Plant Orientation
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Natural Convection as a Passive Safety Design in Nuclear Reactors
Unit 2, Genkai Nuclear Power Plant
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
1 Risks at Komati Water Scheme PED Operations. 2CONTENT  Executive Summary  Pump station layout schematic  KWS Maintenance risks  KWS Operational.
18 MW TURBINE CONTROL PANEL
CONTROL AND SAFETY of Nuclear Steam Supply Systems (NSSS)
Generator Operation. Video of Generator synchronizing.
IN THE NAME OF ALLAH, THE BENEFICENT, THE MERCIFUL
REACTOR PRESSURE VESSEL
BASIC PROFESSIONAL TRAINING COURSE Module XV In-plant accident management Case Studies Version 1.0, May 2015 This material was prepared by.
Chapter 37: Fluid Containment
Unit 13 Oil-Burning Equipment
EP4P03 Nuclear Power Plant Systems and Operation
Diablo Canyon Power Plant: State of the Plant Update
AUTOMOTIVE COOLING SYSTEMS
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Unit 37: Fluid containment Dr
- Condensate pump and feed pump trip!
Fukushima Daiichi Jourdan Robbins 12/6/ /16/16.
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
TURBINE CRANES NEA36 Turbine Crane.
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Date of download: 11/7/2017 Copyright © ASME. All rights reserved.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
T. Steinrötter, M. Kowalik, H. Löffler, M. Sonnenkalb, I. Bakalov
Electrical Gas Plumbing Heating & Cooling
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Nuclear Disaster: Chernobyl, Ukraine
Unit 37: Fluid containment Dr
BASIC MECHANICAL ENGINEERING
Reactor Experiments Instructor: Prof. Kune Y. Suh T/A : Sang Hyuk Yoon
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Compact Nuclear Simulation Analysis
- Condensate pump and feed pump trip!
HAZOP Guidewords Base Set
Group 1 Best Group.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Confidential Oilfree Scroll Compressor   Simplex/Multiplex SRL kW   Troubleshooting Hitachi Industrial Equipment Systems Co., Ltd. Air Compressor.
New Regulatory Requirements in Japan
Presentation transcript:

Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP

Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP Occurrence: July 16, 2007 at 10:13 am JST Earthquake Source: 17km below the seabed off Jo-chuetsu area in Niigata prefecture (37°33.4′North、138°36.5′East) Epicenter Distance: 16km from the NPP Magnitude: 6.8 Situation of the NPP When the earthquake occurred: Unit 2 was in start-up Unit 3, 4 and 7 were in normal operation Unit 1, 5 and 6 were out of operation for the periodic inspections Units 2, 3, 4 and 7 were automatically shut down following the high seismic acceleration trip signals Kashiwazaki-Kariwa NPP Niigata city Epicenter

Rx. Coolant Temp. Rx. Water Level Unit 2 under Stat up 19:40 <100℃ Unit 3 100% Power 23:07 <100℃ Unit 4 100% Power 7/17 6:54 <100℃ Unit 7 100% Power 7/17 1:15 <100℃

Unit 1 RPV Inspection Schedule August September October November December Phase 1 Phase 2 Phase 3 8/21 8/23 Visual inspection using under water TV camera

Unit 1 : Phase 1 Inspection Flange Upper Grid Guide Rod Feed Water Sparger Core Shroud Core Spray Pipe Core Spray Sparger As a result of phase 1 inspection, the abnormality such as the damage / transformation / the falling off was not confirmed.

Unit 1 : Flange Guide Rod Flange

Unit 1 :Guide Rod Guide Rod FW Sparger Core Spray Pipe

Unit 1 :Feed Water Sparger

Unit 1 :Core Spray Pipe

Unit 1 :Core Spray Sparger Core Shroud(upper ring) Core Spray Sparger

Unit 1 :Upper Grid LPRM

Unit 1 : RPV base bolts(A,As)

Unit 1 : Leakage of water into B5 floor Break of Fire Extinguishing Pipe (B,C) B1 Floor B2 Floor B3 Floor B4 Floor B5 Floor Sump Duct Reactor Combination Building Pene Water Flow-in Leakage of water into B5 floor of the reactor combination building (Unit 1)

Unit 1 : Oil Tank (B,C) Land Subsidence

Unit 3 :Fire of House Transformer(1/3) (B,C) As for the duct, 16 - 18cm dropped

Unit 3 :Fire of House Transformer(2/3) Bedrock House Transformer Bus Duct 1 – 3 cm dropped 20 – 25 cm dropped

Unit 3 :Fire of House Transformer(3/3) 2 1 Unit 3 Main Transformer Unit 3 Main Generator House Transformer Start-up Transformer Emergency Bus Normal Bus Fire of House Trans. was not safety related problem

Unit 3 : DG(A,As) Upside Downside

Unit 3 : HCU (A,As)( Hydraulic Control System (CRD))

Unit 3 : MSIV (A,As)

Unit 3 : PLR Pump (A,As)

Unit 3 : RHR Pump (A,As)

Unit 3 : Blow-out Panel came off (B,C)

Unit 3 : Displacement of the main exhaust duct (B,C)

Unit 6 : Leakage of water including radioactive materials (B,C) Leakage of water including radioactive materials into non-controlled area in the reactor building

Unit 6 : Leakage of water including radioactive materials Leakage of water including radioactive materials into non-controlled area in the reactor building

Unit 6 : Damage of the reactor building overhead crane Motor Damaged Damage found on the coupling of the drive axis of the reactor building overhead crane

Unit 7 : Detection of radioactive materials in the main exhaust duct Duct Monitoring House Main Exhaust Duct Filter Reactor Building Turbine Building Reactor Conden-ser Rare Gas Hold -up Equipment Turbine Gland Steam Exhauster Building Ventilation Still Working after Plant Shutdown Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine

Other (B,C)

Solid waste storage warehouse