Development of vibration isolation systems for LCGT VII

Slides:



Advertisements
Similar presentations
ET-meeting, 22 th Oct N. KIMURA/KEK The Latest Status of the KAGRA Cryogenics N. KIMURA A, D. CHEN B, T. KUME A, S. KOIKE A, Y. SAKAKIBARA B, T.
Advertisements

Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
9 th /July/2013 Amaldi 10 C3 15:24~15:42 N.KIMURA/KEK Progress on the Cryogenic System for the Interferometric Cryogenic Gravitational Wave Telescope,
11 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Current status (Experiments in Toshiba, Susupension model, Sapphire fibers,
Rahul Kumar1, T. Takayuki1, K. Yamamoto2, H. Tanaka2,T. Miyamoto2, T
Vibration Isolation R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR), H. Ishizaki (NAOJ), A. Takamori (ERI), R. DeSalvo.
11 K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. Akutsu A, H. Ishizaki.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Cryo-payload Kazuhiro Yamamoto Institute for Cosmic Ray Research
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research (ICRR) the University of Tokyo KAGRA face to face meeting University of Toyama, Toyama, Japan 1 August.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Australia-Italy Australia 6, October 2005 LCGT project Kazuaki Kuroda LCGT Collaboration Cryogenics for LCGT.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Current status (ELiTES and Geometry of payload) KAGRA(LCGT) cryogenic payload.
Ryutaro Takahashi (National Astronomical Observatory of Japan) Vibrtion isolation system for KAGRA The 6th Korea-Japan workshop on KAGRA NAOJ, June,
ICRR Seminar 2009/07/24 Cryogenics in CLIO Masatake Ohashi and the LCGT collaboration.
T Akutsu 1, S Telada 2, T Uchiyama 1, S Miyoki 1, K Yamamoto 1, M Ohashi 1, K Kuroda 1, N Kanda 3 and CLIO Collaboration. 1 ICRR, Univ. of Tokyo, 2 AIST,
111 K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, E. Hirose, T. Uchiyama, S. Miyoki, M. Ohashi, T. Akutsu.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research (ICRR) the University of Tokyo ELiTES first collaboration meeting Sanjo conference hall, the University.
11111 K. Yamamoto, R. Takahashi A, H. Tanaka, T. Miyamoto, K. Ono, T. Sekiguchi, Y. Sakakibara, M. Kamiizumi, E. Hirose, A. Khalaidovski, R. Kumar, T.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research (ICRR) the University of Tokyo KAGRA face to face meeting Institute for Cosmic Ray Research, Kashiwa,
Simulation for KAGRA cryogenic payload: vibration via heat links and thermal noise Univ. Tokyo, D1 Takanori Sekiguchi.
1 K. Yamamoto, R. Takahashi, T. Sekiguchi, T. Uchiyama, H. Ishizaki A, A. Takamori B, R. DeSalvo C, E. Majorana D, LCGT collaboration ICRR, NAO A,ERI B,
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research (ICRR) the University of Tokyo KAGRA face to face meeting University of Toyama, Toyama, Japan 1 August.
External forces from heat links in cryogenic suspensions D1, ICRR, Univ. Tokyo Takanori Sekiguchi GWADW in Hawaii.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Current status KAGRA(LCGT) cryogenic payload meeting 8 February 2012.
1111 K. Yamamoto, R. Takahashi, K. Ono, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, E. Hirose, A. Khalaidovski, T. Uchiyama, S. Miyoki,
11 K. Yamamoto and KAGRA collaboration Institute for Cosmic Ray Research the University of Tokyo Current status of KAGRA Cryogenic 16 May 2012 Gravitational-Wave.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Report from sub-groups Cryogenic Cryogenic payload 4 August 2011.
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Cryogenic Payload Issues
Development of cryogenic payload for KAGRA VI
LCGT f2f meeting/ICRR, 04/Aug./2011 N. KIMURA Status of the Cryogenics Design N. KIMURA A, S. KOIKE B, T. KUME B, T. OHMORI D, Y. SAITO C, Y. SAKAKIBARA.
Vibration Isolation Subsystem KAGRA face to face meeting (31 July, 2012) R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Current status KAGRA(LCGT) cryogenic payload meeting 7 March2012.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The University of Tokyo KAGRA external review (Cryogenic payload) 18 April 2012.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
11 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo Current status (Toshiba, ELiTES, Baffle, Brittleness of Maraging, Cryogenic.
1 Cryogenic payload is not a simple system. We need cryostat to test cryogenic payload performance. 1/4 cryostat will be prepared in Kashiwa campus. 1/4.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research (ICRR) the University of Tokyo KAGRA face to face meeting Institute for Cosmic Ray Research, The.
Vibration measurements at KAGRA site
Cryogenic development in KAGRA
Performance test of KAGRA cryostat at site
Overview of the 20K configuration
Kazuhiro Yamamoto on behalf of KAGRA collaboration
KAGRA用防振装置の開発 VIII Configuration Sensors and Actuators
Performance test of KAGRA cryostat at site
Yuta Michimura Department of Physics, University of Tokyo
LCGT Seismic Attenuation System LCGT-SAS
Radiation shield vibration measurement at KAGRA site
Status of KAGRA Cryogenics II
Kazuaki Kuroda On behalf of LCGT Collaboration
Vibration measurements at KAGRA site
Control of the KAGRA Cryogenic Vibration Isolation System
External forces from heat links in cryogenic suspensions
Vibration Isolation Systems
Institute for Cosmic Ray Research The university of Tokyo
Cryogenic sub group Kazuhiro Yamamoto
Cryo-payload Suspension structure
Institute for Cosmic Ray Research The University of Tokyo
Informal meeting of cryogenic payload
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Report from sub-groups Cryogenic Cryogenic payload
Development of vibration isolation systems for LCGT VI
Development of vibration isolation systems for LCGT VI
Yuta Michimura Department of Physics, University of Tokyo
Presentation transcript:

Development of vibration isolation systems for LCGT VII K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA, H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ, N.A. LockerbieK, LCGT collaboration ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK At first, thank you for giving a chance talk here. In fact, I have been in Trento in 2002, eight years ago. I am happy because I can visit here again. OK, shall we start ? This is the title of my talk of today. Gravitational wave and detectors. 2012 March 24 The meeting of Physical Society of Japan @Kwansei Gakuin University, Nishinomiya, Hyogo

Development of vibration isolation systems for KAGRA VII K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA, H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ, N.A. LockerbieK, LCGT collaboration ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK 2012 March 24 The meeting of Physical Society of Japan @Kwansei Gakuin University, Nishinomiya, Hyogo 2

0. Abstract Progress of development of vibration isolation system, which includes cryogenic payload, for KAGRA in the last half year

Contents Introduction Vibration isolation Cryogenic payload Summary

1. Introduction KAGRA (previously known as: LCGT) 2nd generation interferometric            gravitational wave detector in Japan Key features of KAGRA project Silent underground site (Kamioka) :    Small seismic motion reduced requirements for vibration isolation system. Cryogenic system : Reduction of thermal noise                               and so on

1. Introduction Type-A IP + GASF (5 stage) + Payload (23kg, cryogenic) Type-B IP + GASF (3 stage) + Payload (10kg/20kg) Type-C Stack + Single/Double-pendulum (~1kg)

1. Introduction Type-C Mirror Stack

Type-B Pre-isolator Filter chain Payload Top filter [Filter0] Inverted Pendulum (IP) Filter chain Standard GASF Filter1 (Filter1~3 in Type-A) Bottom Filter (BF) Intermediate Mass (IM) Intermediate Recoil Mass (IRM) Payload Test Mass (TM) Recoil Mass (RM) Optical Bench [Breadboard]

1. Introduction Type A and Cryo payload 14m in height Vibration Isolation (Type A) Cryostat Cryogenic mirror 9

Y. Sakakibara’s talk (in this session) 1. Introduction Cryo payload Shield (8K) Sapphire fiber Sapphire mirror (20K) Y. Sakakibara’s talk (in this session)

1. Introduction Schedule for vibration isolation system of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 - Prototype test (ICRR and NAOJ) : - 2014.3 Pre-isolator : 2011.7 – 2012.9 Type B payload : 2012.7 - 2013.6 Type B : 2013.1 - 2014.3 Assembling (Akeno and Kamioka) : 2012.4 - 2014.9 Standard GASF : 2012.4 – 2012.9 Installation (Kamioka) : 2014.4 - 2016.5 Type B (for iKAGRA) : 2014.4 - 2015.6 Type A and Type B (for bKAGRA) : 2015.5 - 2016.5

1. Introduction Schedule for cryogenic payload of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 - 1/4 cryostat to test payload and R&D : - 2014.9 Design for cryostat and payload : Now 1/4 cryostat installation in ICRR (Kashiwa) : 2013.3 Experiment of 1/4 cryostat : 2013.4 - 2014.9 Procurement : 2014.10 - 2015.6 Installation : 2015.8 - 2016.12

2. Vibration isolation Complete system Prototype test (Pre-isolator) in Kashiwa (ICRR) Complete system Details of experimental test will be reported by T. Sekiguchi (next talk !).

2. Vibration isolation Pre-isolator Prototype test (Pre-isolator) in Kashiwa (ICRR) Pre-isolator Pre-isolator load 14

2. Vibration isolation Standard GASF (prototype) (production) Prototype test (Pre-isolator) in Kashiwa (ICRR) Standard GASF (prototype) (production) 15

2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR) Digital system has already been installed (O. Miyakawa’s talk in this session).

2. Vibration isolation Storage & Assembling Delivered apparatus will be assembled in clean booths and stored in Akeno observatory (ICRR), Yamanashi.

2. Vibration isolation Akeno Lucca (Italy) 19 standard GASF’s from Italy and clean booths arrived. We will start assembling soon. Akeno Lucca (Italy)

3. Cryogenic payload Preparation for 1/4 cryostat Design of 1/4 cryostat is in progress. Preliminary. 19

3. Cryogenic payload Preparation for 1/4 cryostat Design of cryogenic payload is in progress. Preliminary. http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=570 20

3. Cryogenic payload Preparation for 1/4 cryostat Themal and mechanical simulation of payload (S. Koike, Y. Sakakibara, and T. Sekiguchi) 21

3. Cryogenic payload Cryocooler has already arrived at ICRR ! Preparation for 1/4 cryostat (C. Tokoku) Cryocooler has already arrived at ICRR ! 22

3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors

3. Cryogenic payload Test sample (T. Uchiyama) Sapphire fibers to suspend sapphire mirrors Test sample (T. Uchiyama)

3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors Sapphire fibers from MolTech GmbH (Germany) Length = 350 mm diameter = 1.8 mm Almost as needed in bKAGRA. Need to check the quality. 25

3. Cryogenic payload Baffle for the (large angle) scattered light Design from Mike Smith – Caltech (support from LIGO and U.S. National Science Foundation ) Needs suspension inside radiation shield !

3. Cryogenic payload Digital system for temperature monitor Discussion is in progress.

4. Summary Vibration isolation Prototype test in Kashiwa : pre-isolator (Sekiguchi and Miyakawa’ talk) Assembling of Standard GASF in Akeno is started soon. Cryogenics payload Design of the 1/4 cryostat and payload are in progress. Cryocooler for 1/4 cryostat and test samples of sapphire fibers arrived. Baffle in cryostat and digital system are being discussed.

Thank you for your attention !

4. Summary Plan for next half year Vibration isolation Prototype test : pre-isolator and payload Assembling in Akeno : Standard GASF Cryogenics payload Design of the 1/4 cryostat and payload

2. Issues (1)How to assemble Details of construction, clean room …. (2)Strength Tensile strength, development of clamp, … (3)Control system Actuators (what and where), resonant mode (frequency and Q)

2. Issues (4)Cooling Temperature of mirror, initial cooling time, heat resistance … (5)Noise Thermal noise, vibration via heat links …

4. Summary Cryogenic payload : One of key features of LCGT project Cryogenic part of seismic isolation system Cryostat installation in ICRR (Kashiwa) ~2013.3 (Check of cryostat system) Check of cryogenic payload in ICRR Preparation is in progress. (1)Thermal simulation (2)Sapphire fiber-mirror connection (3)Simulation of effect of external vibration (with heat link) (4)Thermal noise

5. Future work (1)How to assemble Details of construction, clean room …. (2)Control system Actuators (what and where), resonant mode (frequency and Q)

Type-B Inverted pendulum Top filter 2-stage GASF Mirror

Schedule along roadmap 1. Introduction Schedule along roadmap 2011 2012 2013 2014 2015 2016 Standard GASF Prototype test in NIKHEF/ICRR Procure Assembling in Akeno Pre-isolator in ICRR Type-B payload in NAOJ in Kamioka Installation Type-A SAS in the site ETM ITM Type-B SAS in TAMA SRM PRM Stack iKAGRA operation

Configuration Type-A: IP + GASF (5 stage) + Payload (23kg, cryogenic) Type-B: IP + GASF (3 stage) + Payload (10kg/20kg, room temp.) Type-C: Stack + Single/Double-pendulum (~1kg) Chamber iKAGRA bKAGRA ITMX, ITMY, ETMX, ETMY Type-A IAOX, IAOY, EAOX, EAOY Type-B Payload on Stack (for ITM/ETM) Type-C (for AO) BS, PR2, PR3 Type-B PRM, SRM, SR2, SR3 MCF, MCE, MMT PD, BRTX, BRTY