Low Level RF Design Outline Scope Requirements Options considered

Slides:



Advertisements
Similar presentations
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Advertisements

Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
Linac 4 LL RF Hardware Architecture and Design Status
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
By: Eric Backman Advisor: Dr. Malinowski.  Introduction  Goals  Project Overview and Changes  Work Completed  Updated Schedule.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
EPICS EPICS Limitations Bob Dalesio Marty Kraimer.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
RCE Project Update and Plans Matt Weaver, July 14, 2015 SLAC Technology Innovation Directorate Advanced Data Systems Department.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
LLRF development of SSRF RF Group and Linac Group
BSA 375 Week 3 DQ 2 What are issues to consider when deciding to build software in-house or purchase commercial off-the-shelf software (COTS)? If you were.
Software Overview Sonja Vrcic
David Ho Mentor: Professor H. Jafarkhani Professor H. Yousefi’zadeh
Current Status of IPM-Linac Control System
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ILC LLRF Status Ruben Carcagno, Brian Chase
Second SPL Collaboration Meeting, Vancouver May 2009
New xTCA Developments at SLAC
AIP /02 P Bellomo - QE Magnet Power System Upgrade
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
Local Oscillator Generation - Internal.
Anne Pratoomtong ECE734, Spring2002
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Timing Outline Scope The order of things
UITF MPS system requirements
Low Level RF Status Outline LLRF controls system overview
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
LLRF Control System Outline Scope Requirements Design Considerations
Modern Systems Analysis and Design Third Edition
LCLS Timing Outline Scope The order of things
Low Level RF Status Outline LLRF controls system overview
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Modern Systems Analysis and Design Third Edition
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
Linac LLP Outline LINAC Long Lead Procurements
Command and Data Handling
Modern Systems Analysis and Design Third Edition
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
Breakout Session SC3 – Undulator
Presentation transcript:

Low Level RF Design Outline Scope Requirements Options considered Evaluation System drawings Conclusions

Scope This document summarizes the evolution of the LLRF control system design from its original distributed VME chassis (1 per klystron) to the current design

Requirements Meet phase/amp noise levels Achieve 120 Hz feedback to maintain phase/amp stability Adhere to LCLS Controls Group standards: RTEMS, EPICS, Channel Access protocol Begin RF processing of high-powered structures May, 2006

Options considered Originally, various solutions were evaluated, from 100% COTS modules to hybrids of in- house designed boards. See Low Level RF Controls Design, LCLS Week, 25-27 Jan 2005 Later, the options were narrowed down to two: an Off-the-shelf solution and an in- house solution. See Low Level RF, Lehman Review, 10-12 May 2005

Evaluation The Off-the-shelf solution is: The in-house solution is: Expensive ($25K per instance * 10 instances) Noisy. ADCs are up to 150’ from what they measure so analog noise levels and ground loop problems would need to be dealt with The in-house solution is: Possibly longer to develop due to board design and fabrication time.

Evaluation (2) Characteristics of the Off-the-shelf solution were seen as requiring more effort than those of the in- house solution Potential offered by the lower cost of the in-house solution to replace 250 klystron controllers in the remainder of the LINAC is attractive Hardware people were available as of 22aug2005 to work on board design if µcontroller was decided Turned to the EPICS community for ideas and chose a µcontroller

Evaluation (3) Lower cost alternatives to the $15K VME chassis and IOC were discussed in the session on hardware at the EPICS Collaboration Meeting. April 27-29, 2005 Of the options available, only the Coldfire uCdimm 5282 processor had the communication speed and power to meet our data requirements. Cost is $150 per processor plus the development of the board it sits on

Evaluation (4) By choosing the Coldfire processor, we are able to make use of the port of the operating system, RTEMS, which has already been done. RTEMS is the standard for the real-time operating system chosen for LCLS by the Controls Group EPICS, the standard for the control system software for LCLS runs on RTEMS With these choices, the LLRF control system will be fully integrated into the rest of the LCLS EPICS control system and can speak to other devices and applications such as control panels, alarm handlers and data archivers, using Channel Access protocol, the standard communication protocol for this project.

Conclusions This solution: meets the spec for speed and noise avoids signal noise problems avoids ground loop problems meets LCLS control system requirments and standards running EPICS on RTEMS provides a low cost path for future upgrade in the rest of the LINAC when the rest of the klystron control is replaced