Undulator Controls Breakout

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Prototype Development of Automated Ring Main Unit System
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Undulator Control Module Facility Advisory Committee Review, October 30th 2007.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Arturo Alarcon FAC, Undulator June 17, 2008 Undulator Control Module Facility Advisory Committee June 17, 2008 SLAC -
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
Interoperability Interconnectivity Remote connection Logical connection Local connection Application Presentation Session Transport Network Data Link Physical.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
End Station Personal Safety Shutter TSC Design Presentation.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
delivered with the compressor
LKr status R. Fantechi.
Overview of Mechanical Design
Integration & Commissioning
ATF2 Magnet Power Supplies
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
2K CB FDR Overview:  Agenda, Charge, Review Process
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
M. Zerlauth, I. Romera 0v1.
LTU/Undulator Installation Status
Undulator Scope, Management, and Organization
Overarching Commissioning Plan
e-Beams Systems Update
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
Payload 2015 Class 8 By Jeff Dunker 5/22/ Beginner Payload.
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Beam Finder Wire (BFW) Status
Undulator Assembly and Installation Planning
Undulator Alignment Plan
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Door Heat Exchanger: Specification
LCLS Undulator Controls Status
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Undulator Controls Breakout 4/13/2019 Undulator Controls Breakout Josh Stein LCLS Undulator Controls CAM/TL Test

UCM Software is 90% complete 4/13/2019 Good Things UCM Software is 90% complete With the talent at SLAC I’m confident that - if we had to - the software could be delivered right now UCMI Translation interlock working EIA design is complete Many components delivered and waiting assembly Blah blah blah - this isn’t important now Test

Worrisome things - UCMI 4/13/2019 Worrisome things - UCMI UCMI Design flaws Motor wiring reversed including power and communications Possible motor damage Breaking news: 3 motor damaged Requires board revision Not that bad as we were going to change the board to accommodate changes recommended by FDR committee These changes prevent us from finalizing design and going out for bid Test

Worrisome things - UCMPS UCMPS Design not complete Initial “it’s an easy thing to do” design not inspiring confidence Uses open-frame supplies for 42V and 24V encased within a 19” rack mount chassis Fuses blowing with no-load Strange “warm start” observed on 24V supply UCMI was pulling too much current on startup - larger capacity supply to replace current one 4 week lead time for internal components Budget has not been approved for this design effort or M&S “Slipped through cracks” after UCM redesign. Current effort is unfunded SLAC engineering assistance?

Worrisome things - VME Crates 4/13/2019 Worrisome things - VME Crates VME Crate delivery schedule Vendor claims first shipment of 12 units will go out mid February with two more deliveries planned over 2 months Need device support and/or documentation for the SLAC supplied unit to allow us remote reboot/power cycling Test

Worrisome things - Rack assemblies Rack preparations A/C power entry needs to be nailed down 3/4” penetration settled on via teleconference New doors ordered Work-flow for populating and testing completed racks has begun but has stalled due to difficulties in LTT What about SLAC installed components in this rack? Network transceiver Console Crating and shipping options needs to be nailed down Probably will re-use a portion of the original shipping containers Delivery options - preference vs. cost savings? One single delivery? 2-3 medium-sized shipments?

Worrisome things - Translation stages 4/13/2019 Worrisome things - Translation stages Motor limit connections need to be specified Right-angle connector on downstream linear potentiometer oriented incorrectly Claimed “skew limit” of 50 microns(!) - need for empirical testing with mechanical engineering assistance UCM FDR review comments for limit switch and actuator design need addressing Alignment/calibration procedure for linear potentiometers needed How to find “home”? Test

Worrisome things - Translation Stages How to adjust limits? Need tolerance numbers Current set-screw method seems cumbersome How to test skew interlock? Calibrated shims Potential flex in actuator?

Worrisome things - Translation Stages

Worrisome things - BFW I have some notes on possibly adding another switch to the BFW actuator position for use by the MPS

Worrisome things - UCM Handoff 4/13/2019 Worrisome things - UCM Handoff UCM Documentation Calibration procedures Linear slides Cam movers BFW RTDs Uncrate checkout Installation checks Run the system in the tunnel Commissioning checks Test

Worrisome things - BLM Vague milestones 4/13/2019 Worrisome things - BLM Vague milestones Budget for APS/CTLS effort not approved - currently working unfunded Test