NER 300 UK ProjectsPage 1 What is NER 300? Worlds largest CCS funding mechanism. 300 million emission unit allowances (EUAs) Todays value app. 4.5bn –allocated.

Slides:



Advertisements
Similar presentations
Chuck Kutscher National Renewable Energy Laboratory
Advertisements

PRE220_Nick Horler CCS Forum_ th November 2009 Carbon Capture and Storage Forum 2009 Making the UK a world leader in CCS technology Nick Horler,
1 The Changing Fortunes of the EUs Energy Market Antony Froggatt.
Carbon: Problems And Effects IB SL C.C.S: Carbon Capture and Storage.
Technologie czystego węgla w Polsce Clean coal technologies in Poland
1 Carbon Capture and Storage (CCS) in the United States: The Challenges Ahead Carbon Capture and Storage (CCS) in the United States: The Challenges Ahead.
DG Energy and Transport, European Commission Fabrizio Barbaso 16/04/2008 EU ENERGY SECURITY STRATEGIES ARF Energy Security Seminar EUROPEAN COMMISSION.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
CO2 and Clean Coal Future Needs for Energy Research Infrastructure Tony Kaiser June, 2005.
European Commission: Environment Directorate General Slide: 1 The Second European Climate Change Programme Working Group III Carbon Capture and Geological.
| CCS | Wolfgang Dirschauer | Vattenfall Europe 1 Our future of Clean Coal: CO 2 -free power plants Wolfgang Dirschauer Vattenfall Europe.
1 Providers Perspective on the Future Bill Levis President, PSEG Power Bill Levis President, PSEG Power.
Joe Chaisson April 21, Integrated Coal Gasification Combined Cycle (IGCC) Power Plants and Geologic Carbon Sequestration Joe Chaisson.
CCS policy developments
Mathieu Lucquiaud, Hannah Chalmers, Jon Gibbins
UKCCSC Theme A Review 18 th April 2007, Nottingham Adina Bosoaga.
Change Sust Dev Comm 6 Nov Carbon capture and geological storage for Scotland Stuart Haszeldine University of Edinburgh.
Recipient of James Watt Gold Medal for Energy Conservation Keith Tovey ( ) M.A., PhD, CEng, MICE, CEnv Reader Emeritus: University of East Anglia 1 Pathways.
Prime Ministers Strategy Unit 24 April Energy Industries and Technologies Unit 1 The Policy Context The Technology Programme within the innovation.
World energy economy at a glance Uri Barenholz Weizmann institute of science December, 2011.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
HIsarna, a Revolution in Steelmaking February 25, 2013 / Tim Peeters.
Carbon Capture & Storage: Why we need a campaign against Longannet Mandy Meikle Scotland Against New Coal Scottish Climate Camp 13 June 2009.
UK enabling Legislation Renewable Energy Strategy.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
Aston University Bioenergy Research Group (BERG) Dr Daniel J
COMBUSTION CONTROL IN BOILERS 1 Dept. of Electronics & Instrumentation, Narayana Engineering College, Nellore.
SINTEF Energy Research Emerging technologies for decarbonization of natural gas Dr. ing. Ola Maurstad.
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
Nuon Future plan: Magnum Project
CATO 3 & Utilization of CO 2 Can the Utilization of CO 2 enhance the development of CCS?
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
COTES Group. Our Company>>>> Our Team and Resources>>>> References>>>> Engineering of the 21st Century>>>>
First Solar FuelSmart™: Powering Energy Security
New Technologies for Fossil Fuels By: Carlos J. Vicente Mónica Páez Alessandro Di Nápoli José Pablo Alvarado.
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
Translating Climate Change Issues Into Operational Reality David Clarry March 5, 2008.
The Australian Renewable Energy Agency and the New Energy Course Argus Australia Power Generation Fuels 27 February 2013.
10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
Equal or Not. Equal or Not
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Mark Ackiewicz Director, Division of CCS Research U.S. Department of Energy April 22, 2014 Workshop on Technology Pathways Forward for CCS on Natural Gas.
CCS Activities in US and China NARUC Meeting February 13, 2011 Nicholas K. Akins President – American Electric Power.
Carbon Capture and Sequestration Update APPA Energy & Clean Air Task Force April 26, 2010.
CO 2 Capture and Storage (CCS). Contents The Need for CO 2 Capture and Storage 4 Reliance on Fossil Fuels 5 Largest CO 2 Emitters 7 Addressing the Challenge.
Victorian Brown Coal Dale Seymour Deputy Secretary Energy, Resources and Major Projects Department of Primary Industries, Vic.
The UK « Coal Forum » and Carbon Capture and Storage Development Programme European Social Partners’ Conference on Initiatives involving social partners.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
The Energy Crisis: a global perspective Dave Feickert, TUC Energy Adviser Rotherham Town Hall 27October 2006 G8 Primary energy balance 2003 EU members.
John Barton Project Director NEEF February 2010 Renew introduction Current activities A vision for the future.
Coal and Gas Power Generation : Information sources Angela Betts and Sarah Davis.
An Introduction to the Role of Carbon Capture and Storage in Ukraine Keith Whiriskey.
Emerging sustainable energy technologies. Ferrybridge Power Station (Eric De Mare)
PROSPECTS FOR CO 2 CAPTURE AND STORAGE Energy Technology Scenarios Technologies and Costs of CO 2 Sequestration Jacek Podkanski, Dolf Gielen International.
1 CO 2 from capture to storage Gérard FRIES Executive Vice-President Institut Français du Pétrole.
by Mr. V.S. Verma Member (Planning) Central Electricity Authority
Sean Black 15 th June 2009 Developing Solutions for CO 2 Capture MARC Conference Traverse City, MI, POWER SYSTEMS.
International workshop on power generation with CCS in India 22 January 2008 Rachel Crisp Deputy Director, CCS team, Department of Business and Enterprise.
© CO2CRC. All rights reserved. Dr Dennis R Van Puyvelde Technical & International Projects Manager Cooperative Research Centre for Greenhouse Gas Technologies.
1 FUTURE EU ENERGY MIX - WILL COAL PLAY AN IMPORTANT ROLE? International Conference in Gliwice 29 May 2006 Matthias Dürr RWE AG.
UKCCS/003/001 - PRE098 - SEGEC Norway Visit - SP ACC Collaboration - 13 Oct 08.ppt CCS & Technology Development Group Carbon Capture and Storage Scottish.
EU CCS Demonstration Projects Giles Dickson Brussels, 9 February 2009.
UK Government – Delivering Carbon Capture & Storage Louise Barr Head, Outreach and Collaboration Office of CCS, Department of Energy and Climate Change.
Integrated Gasification Combined Cycle
Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008.
Marco Mazzotti – ETH Zurich, Switzerland
Plans for Widescale Deployment and Barriers to Implementation
White Rose CCS Project David Love, Director of Policy & Regulation, Drax. March 2013.
Consumption Production CO2 (Quadrillion BTU’s) rank Germany
Presentation transcript:

NER 300 UK ProjectsPage 1 What is NER 300? Worlds largest CCS funding mechanism. 300 million emission unit allowances (EUAs) Todays value app. 4.5bn –allocated by two calls for proposals for large-scale demonstration projects of CCS 1st call (200 million EUA): Application to MS by the February 9th. MS to European Investment Bank and European Commission by May 9th, nd call (100 million EUA): 2012 (selection: late 2013)

NER 300 UK ProjectsPage 2 NER 300 Overeview Total projects 22 CCS and 131 RES, according to the European Commission: Power generation: pre-combustion 250 MW = 6 projects Power generation: post combustion 250 MW= 8 project Power generation: oxyfuel 250 MW = 4 projects Industrial applications = 4 projects Refineries, with 500 kt/y stored CO2 from one or more sources within the refinery Cement kiln, with 500 kt/y stored CO2 Primary production routes in iron and steel production with 500 kt/y stored CO2 Primary production routes in aluminium production with 500 kt/y stored CO2

NER 300 UK ProjectsPage 3 Projects Per Country 9 in the UK (5 pre-combustion projects, 3 post-combustion projects, 1 oxyfuel project) 4 in the Netherlands (1 oxyfuel, 1 pre-combustion, 1 postcombustion, 1 industrial) 1 in Spain (oxyfuel) 1 in Italy (post-combustion) 1 in France (industrial) 1 in Poland (post-combustion) 1 in Germany (oxyfuel) 1 in Romania (post-combustion)

NER 300 UK ProjectsPage 4 NER 300 CCS Projects in UK 5 pre-combustion projects: Eston Grange (Progressive Energy) Lynemouth project (Alcan, Progressive Energy) Killingholme, (C gen) Two projects in Hatfield (Powerfuel Power Limited) 3 post-combustion projects: Longannet (Scottish Power) Peterhead (Scottish and Southern Energy) Hunterston (AP Ayrshire Power Limited) 1 oxyfuel project: Drax project in Selby E.ON, RWE, EDF Energy say did not enter UK bids

NER 300 UK ProjectsPage 5 UK- Eston Grange Teesside, North-East England Project: new 850 MW IGCC power plant Capture technology: Pre-combustion: Around 85% of CO2 emissions Storage: Offshore approximately 7.5 million tonnes CO2 North Sea. Consortium: Coastal Energy Ltd, a joint venture between Centrica (British Gas) and Progressive Energy Ltd. Project will store CO2 from other power plants and industrial processes in Teesside and the North East. Network developed by COOTS Ltd: joint venture between Centrica and Progressive Energy Ltd- pipeline to account for CO2 from other sources

NER 300 UK ProjectsPage 6 UK - Lynemouth project Northumberland, North England Retrofit the Lynemouth biomass and coal-fired power station (420MW) on one of three units (Most thermally efficient coal-fired power station in the UK). Assumed capture technology: Pre-combustion. Storage: Off shore – salient acquifer – North Sea Project partners: Rio Tinto Alcans and Progressive Energy – may share the CO2 transport pipeline and storage site with Eston Grange. Part of the North East network, being developed with One North East, Project:clusterred with the Eston Grange project Tees Valley Unlimited (TVU), the North East Process Industry Cluster (NEPIC), the Association of North East Councils, RENEW, and major firms including Sabic, Growhow, Lucite International, Rio Tinto Alcan and Progressive Energy

NER 300 UK ProjectsPage 7 UK - Killingholme South of Hamber, North Lincolnshire. Killingholme, C Gen (Belgian company) IGCC plant up to 430MW in size in Killingholmes clean gas project Capture technology: Pre-combustion Storage: North Sea The Humber region is seen as a prime spot to test CCS with its abundance of power plants, oil refineries and steelworks. 4 out of 9 UK bids are from Hamber

NER 300 UK ProjectsPage 8 UK - Hatfield #1 Hatfield, Hertfordshire, England 900MW IGCC plant - new coal power plant Capture technology: Pre-combustion Offshore storage: 5 million tonnes per annun (Mta) of CO2, in saline aquifers or depleted reservoirs beneath North Sea Consortium: Powerfuel Power Limited, Shell, Russia's Kuzbassrazrezugol and National Grid, which has responsibility for the transportation and storage elements. The companies Powerfuel Power Ltd, B9 Coal Ltd and AFC Energy Plc have now signed a Letter of Intent to install up to 300 megawatts(MW) of AFC Energys alkaline fuel cell technology at Hatfield.

NER 300 UK ProjectsPage 9 UK - Hatfield #2 Hatfield, Hertfordshire, England 450MW gas fired Endex NGCC plant in Hatfield Capture technology: pre-combustion Endex Reactor technology, with zero primary energy penalty 10MW pilot project, expected to be up and running in 2011 Commercial scale by the end of Storage technology: Joint venture: Powerfuel Power Limited and Australian firm Calix Announced in November 2010 à Powerfuel PL, the energy company, entered two bids for plants at Hatfield near Doncaster.

NER 300 UK ProjectsPage 10 UK - Longannet Longannet, Scotland Capture technology: retrofit with post-combustion capture technology on twoof the 600 MW units of the 2400 MW coal/biomass turbine. Emission reduction: 90% Offshore Storage: 2 Mta CO2 captured, stored in the North Sea The pilot involves a Mobile Test Unit (MTU), Aker Clean Carbon. App. 1MWin size, processing 1,000m3 of flue gas per hour and can capture up to 200 kgof CO2 per hour. Consortium: Scottish Power and brings in other companies as part of a consortium, including National Grid for the transport aspect, Shell U.K Limited(storage) and Aker Clean Carbon (capture). The consortium is also investigating using a rock formation under the North Sea to store the captured CO2.

NER 300 UK ProjectsPage 11 UK- Peterhead Peterhead, Scotland New gas fired Peterhead power station Capture technology: Post-combustion project on one 385 MW combined cycle gas turbine unit 1Mta of CO2 captured Offshore Storage: existing gas reservoir in the North Sea, operated by Shell First project was cancelled Current consortium: Scottish and Southern Energy (SSE) and Shell and CO2 DeepStore (offshore transport and storage elements)

NER 300 UK ProjectsPage 12 UK - Hunterston Hunterston, North Ayrshire, Scotland New co-fired coal and biomass power plant at Hunterston Approx. 1700MW capacity. Capture technology: Post-combustion. Approx. 100,000tpa of CO2 captured Offshore Storage: East Irish Sea In December 2010, AP Ayrshire Power Limited announced consortium with Doosan Power Systems (capture), Fluor Limited and Petrofac (storage).

NER 300 UK ProjectsPage 13 UK - Drax Power project in Selby Sulby, Northamptonshire, England New 426MW CCS demonstration project, on or near the site of the 4,000MW coal power station. Capture Technology: oxyfuel Offshore storage: North sea Bid partners: Drax Power, Alstom UK, National Grid National Grid will provide the transportation element of the chain with an experienced offshore partner.

NER 300 UK ProjectsPage 14 NER300 CCS projects in the Netherlands There are 4 tenders to the NER 300 in the Netherlands: 1 Post-combustion project in Eemshaven 1 Pre-combustion project in Buggenum, Rotterdam 1 Oxyfuel Corus' CO2 –project 1 Industrial project on a hydrogen Refinery, Air Liquide Storage site undecided yet. Other projects: ROAD in Rotterdam have not applied

NER 300 UK ProjectsPage 15 NL - Eemshaven Northern seaport of Eemshaven in Groningen 1600 MW coal-fired power plant in - based on 10% biomass Capture technology: post-combustion CO2 capture R&D unit. 200,000 ton per year of CO2 (equivalent to 35 MW). Storage site: undecided Operating demo 10 MW plant in Germany (Niederaussem) Project partners: Essent/RWE Power Plans to become operational in 2015.

NER 300 UK ProjectsPage 16 NL - Buggenum Project Buggenum in the Dutch province of Limburg Capture technology: Pre-combustion process on a biomass/coal fired plant Willem Alexander IGCC power plant (233MW,) in operationsince February 2011 Buggenum pilot plant in preparation of Magnum: 1200 MW multi-fuel (coal, biomass, natural gas) power plant based on coal gasification technology Storage: undecided Consortium: Nuon, Vattenfall - working together with leading parties such as ECN, KEMA TNO and Delft University of Technology.

NER 300 UK ProjectsPage 17 NL - Corus CO2-project Location of the capture plant undefined Project: Oxyfuel technology. Was planned on steel manufacture but may have changed. Not many details on this new project are available. Along with HISARNA technology, partially funded through theUltra-Low CO2 Steelmaking (ULCOS) initiative Storage was planned in Ljmuiden The consortium leader: Corus

NER 300 UK ProjectsPage 18 NL - Air Liquide Refinery Botlek area, Rotterdam Industrial project: New hydrogen plant. Capture fitted on to new hydrogen units or retrofitted onto existing units Capture technology: Carbon capture unit called cryogenic purification unit (CPU) that could capture up to 0.55Mta CO2 Air Liquide in co-operation with the Rotterdam Climate Initiative, Air Liquide is also a partner in the joint venture with Vopak, Anthony Veder and Gasunie, for the carbon dioxide hub in Rotterdam

NER 300 UK ProjectsPage 19 NER 300 CCS projects in FRANCE Florange, Northern France Industrial project The Florange steelworks project which is part of the ULCOS project in Northern France Capture technology: Retrofit: post-combustion technology on a steel plant to capture carbon dioxide. Construction could commence 2012/ ,000 t CO CO2 /y to be captured Onshore Storage: Injection could ideally start by 2015, in deep saline formations Consortium: ArcelorMittal & ULCOS (Ultra-Low- CO2 -Steel) Other ongoing CCS projects: CCS demonstration on a gas power plant in Lacq: oxyfuel capture process & storage in depleted natural gas reservoir.

NER 300 UK ProjectsPage 20 NER 300 CCS projects in GERMANY Jänschwalde, Brandenburg in East Germany Oxyfuel project Capture technology: combination of oxyfuel and post-combustion capture technologies on two of the six 250MW boilers units of the lignite fired power plant NER300 project: 250 MW Oxyfuel boiler – Oxyfuel was chosen for its superior capture rates and is the best option to retrofit existing power plants Onshore storage: route undecided Vattenfall should start operations in 2015

NER 300 UK ProjectsPage 21 The Jänschwalde power plant The Jänschwalde project applied to the NER300, it has already received 180mn, provided by European Union Economic Recovery Package

NER 300 UK ProjectsPage 22 NER 300 CCS projects in ITALY Porto Tolle, Northern Italy Capture technology: post-combustion Retrofitting a 660MW coal-fired power-generation with post-combustion technology. 1 Mt/y of CO2 Offshore storage: into an off-shore saline aquifer. Consortium: ENEL - Eni S.p.a. (co-operatioon agreement aimed at developing an integrated pilot CCS project and a feasibility study for the construction of a large-scale integrated demo plant at the Porto Tolle power plant); IFP Energies Nouvelles for the capture (MoU to test the first generation post combustion capture process developed by IFP, on the capture pilot plant in Brindisi) Other ongoing project: ENEL has inaugurated the CCS pilot plant on theFederico II coal plant in Brindisi, early 2011

NER 300 UK ProjectsPage 23 NER 300 CCS projects in POLAND Belchatow, central Poland 858 MW new unit of the existing 4,440 MW Iignite-fired power plant Capture technology: Post-combustion: Carbon Capture Plant (CCP) of equivalent power of >250MW, integrated with the 858 MW unit. CO2 capture efficiency of >80% (Advanced Amine Process (AAP) Onshore storage: saline formations. approx.1.8Mta of CO2 captured Consortium: PGE Group (larger power sector company in Poland) and Alstom (lignite-fired unit currently being built by Alstom for PGE Elektrownia Bełchatów)

NER 300 UK ProjectsPage 24 Belchatow power station The largest thermal power station in Europe, the second largest fossil fuel power station in the world.

NER 300 UK ProjectsPage 25 NER 300 CCS projects in SPAIN Compostilla, North West Spain ENDESA power station Compostilla OXYCFB300 Capture technology: Oxy-combustion plant: 300 Mwe Circulating Fluidised Bed (CFB) technology. Tested first on a new 30 MWth Technology Development Plant (TDP), in Cubillos del Sil. 1.1Mta CO2 captured, transported approximately 120km by onshore pipeline. Onshore Storage: proposed in saline formations. Consortium ENDESA, CIUDEN and Foster Wheeler Energia for the for its CO2 Capture Technology Development Plant

NER 300 UK ProjectsPage 26 NER 300 CCS projects in ROMANIA Turceni, South West Romania Capture technology: Post-combustion on a newly modernised lignite- fired unit of 330MW 1,5Mta of captured CO 85% removal efficiency from flue gases. Onshore storage: deep saline aquifers in the area Consortium: ISPE as the manager of the CCS project together with Turceni Power Plant. Got funds from the Norwegian Grants Agreement

NER 300 UK ProjectsPage 27 Turceni power station The largest electricity producer in Romania, with an installed capacity of 2310MW.