Steering Committee Webinar March 25, 2016

Slides:



Advertisements
Similar presentations
Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
Advertisements

Green Building Ordinance Transportation and Environment Committee
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
1 WGA Clean and Diversified Energy Advisory Committee Briefing Brian Horii Energy and Environmental Economics, Inc
Project Title Project Investigators Project Duration: (E.g., 3 years; currently in year 2, or x months if this is a better representation of project time)
California Integrated Waste Management Board 1 Consideration Of Approval Of Allocations For Contract Concepts From The RMDZ Revolving Loan Account For.
Proposed EA Assessment Framework 2.0 Chief Architect’s Forum (CAF) Dick Burk Chief Architect and Director of Federal Enterprise Architecture Program, OMB.
The OMII Perspective on Grid and Web Services At the University of Southampton.
Project Initiation Document (PID) Strategic Plan June 25, 2012.
UNCTAD ICT and E-Business Branch 9/17/2015 / 1 Joint UNCTAD-ITU-UNESCAP Workshop Information Society Measurements in Asia-Pacific Bangkok, July 2006.
Project Initiation Document (PID) Strategic Plan PID Committee Meeting - November 5, 2012.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Census Quality: another dimension! Paper for Q2008 conference, Rome Louisa Blackwell Quality Assurance Manager, 2011 Census.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
M&E requirements for grant signing: M&E Plan Workshop on effective Global Fund Grant negotiation and implementation planning January 2008 Manila,
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Best of Region and Northwest Benchmark Standard (NWBEST) for the.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
Development of Fish and Wildlife Program Amendments.
Item #11 Alternative Approaches for Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Road Impact Fee Update Discussion Item June 21, 2011 Transportation Impact Fee Update Discussion Item June 21, 2011.
Sixth Power Plan A Public Utility Point of View Bill Gaines, Director, Tacoma Public Utilities Craig Smith, Assistant General Manager, Snohomish PUD Northwest.
Northwest Resource Adequacy Implementation – Update ---- DRAFT ---- NW Adequacy Forum Technical Committee May 31, 2006.
Driving towards Impact through Development Goals Washington, DC 04/13/2011.
FY 13 BENEFITS REALIZATION AND PROJECT REVIEW March 12, 2013.
Community Redevelopment for Eastside Report on Advisory Committee Input and Request for Board Direction June 26, 2012.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Presentation to the Finance and Administration Advisory Group ▸Implementing a New Space Request Process ▸Process for requesting additional space.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
RTF Implementation of the Seventh Plan Jennifer Light and Charlies Grist RTF Policy Advisory Committee February 19, 2016.
1 Earthquake Response Cooperation Program for Energy Supply Systems (Phase 2) Proposed by Chinese Taipei May 18, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration Energy Efficiency Emerging Technologies (E3T) Program Introduction.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Update for the Citizens Advisory Committee February 22, 2017
LNBA Subgroup: Avoided Transmission Value
VTPBiS Classroom Behavior Practice Coaching: Focus on Coaching
Break-out group discussion
Region 15 Regional Healthcare Partnership 8th Public Meeting
Queen Anne’s County Commissioners FY2018 Proposed Budget April 24, 25, 26, 2017 Gregg A. Todd, County Administrator Jonathan R. Seeman, Director,
Demand Response in the 7th Power Plan
Implementing the Transportation/Land Use Connection Program
Draft Chapter 12: Bonneville Obligations
Steering Committee Webinar March 25, 2016
Mulberry Watershed Management Plan
Sixth Power Plan Setting Conservation Targets and Implementation Strategies Jill Steiner, Snohomish Public Utility District Northwest Power and Conservation.
Management Discussion Items
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Student Support Services
Water Quality Trading Advisory Committee MDA Headquarters
Project Definition of Bulk Electric System
Water Quality Trading Advisory Committee MDA Headquarters
Economic Adequacy Standard
Pacific Northwest Resource Adequacy Assessment
Innovations in Tracking, Managing, & Reporting SNAP-Ed Impact Data
Draft Chapter 12: Bonneville Obligations
CGBN Co-ordination Group for Biodiversity and Nature
2021 Adequacy Assessment Status Report
Jeremy Phillips Director of Research Road Safety GB
Technical Committee Meeting March 18, 2016
Future Strategy and Work Plan
Technical Committee Meeting March 18, 2016
Steering Committee Webinar March 25, 2016
District and School Accountability System: Proposed Modifications
APHA Regional Club Advisory Committee
Status of the Resource Adequacy Forum
Resource Adequacy Technical Committee Meeting April 22, 2010
Presentation transcript:

Steering Committee Webinar March 25, 2016 2021 Adequacy Assessment Power Plan vs. Adequacy Assessment Resource Adequacy Advisory Committee Steering Committee Webinar March 25, 2016

Next Adequacy Assessment Seventh Plan was adopted Feb 10, 2016 2016 Adequacy Assessment is anticipated June 14-15 Action Items COUN-3 to COUN-6 address review of Adequacy Assessment Assumptions and Methods in 7th Plan

GENESYS Redevelopment FY16 – Develop expanded methodology FY17 – Code and Test FY18 – First potential adequacy assessment with redeveloped model

Action Item Res-3 Develop and implement methods to identify system specific least-cost resources to maintain resource adequacy […] Assess the individual positions of Bonneville or the utility with regard to the contribution to individual and regional reliability. Beyond Red-Yellow-Green Assessment

Previous Adequacy Assessments Adequacy assessments between the 6th and 7th plans used conservation consistent with 6th plan targets Loads were as discussed in the last RAAC Technical meeting Generally, adequacy assessments were based on 6th plan framework

Future Adequacy Assessments The 7th Plan establishes a closer tie between adequacy assessment and power plan More consistency with Power Plan is desirable Adequacy standards in turn drive Power Plan resource strategies

Adequacy Assessment in the 7th Plan Baseline for the 2016 adequacy assessment will be consistent with 7th plan setup, so you’ll see in the next agenda items…