Contact Accident August 8, 2017

Slides:



Advertisements
Similar presentations
Hazards Of Electricity
Advertisements

Accidents: Review & Investigation Basics. It is important that you check with your Comprehensive Loss Control Coordinator, Human Resources, and Supervisor.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Incident Reporting Procedure
Yale Fleet Safety Programs Phil Cundiff Manager of Claims and Loss Control Risk Management July 2012 Phil Cundiff Manager of Claims and Loss Control Risk.
Safety Inspections & Hazard Recognition. Importance of Jobsite Safety Inspections Jobsite Inspections are a method of evaluating the implementation and.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Standing TSA/Addendum Process Importance of TSAs Why are TSAs important? – Planning safety into the job minimizes surprises and slow downs, thereby improving.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
MNM Fatal Slip or Fall of Person Slip or Fall of Person August 21, 2004 (Oregon) August 21, 2004 (Oregon) Sand & Gravel Operation Sand & Gravel.
RTKC 2016 Recordable Injuries Updated as of March 7, 2016.
SAFETY VS RISK. ATTITUDE It’s really all about how you look at the risks associated with your job. It’s really all about how you look at the risks associated.
Utility Service Equipment
“Success in Safety”.
Electrical Safety Equipment
OWEN ELECTRIC COOPERATIVE
High Potential Near Miss
A4 Insulator Changeout.
Electrical Shock (Injury)
SAFE WORK INSTRUCTIONS
Cutting an In-Line Dead-end Single Phase
Voltage Regulator Bypass
Voltage Regulator Bypass
Protective Grounding Three Phase Tangent
A 3 Insulator Changeout with Jib
Lineman Contact.
C 4 Insulator Changeout With Hoists
Electrical Shock (Injury)
Protective Grounding Single Phase Tangent
Emergency Action Plans
Click anywhere to get started…
C5.21L Three Phase Dead End Insulator Changeout
A4 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Cutting in Bells Single Phase
Cutting in Bells Three Phase
C3 Insulator Changeout With Jib
A 3 Insulator Changeout With Hoists
Relocating a Three Phase Transformer Bank
A1 Pole Changeout Energized
URD Radial Feed Transformer Changeout
Helicopter Safety for SAR Operations
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
Voltage Regulator Bypass
A 3 Insulator Changeout with Jib
C3 Insulator Changeout With Jib
C3 Insulator Changeout With Hoists
Line Down Single phase © 2018 Iowa Association of Electric Cooperatives.
Cutting an In-Line Dead-end Single Phase
A1 to A6 Conversion Tangent to Double Dead End
A5 Insulator Change Transformer Pole
A2 Pole Changeout Energized
A1 Pole Changeout Energized
A 3 Insulator Changeout with Jib
Observers of the Month July 2013 Restricted.
Installing a single phase tap on an existing C1.11
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
A1 Insulator Changeout Energized
A4 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
Cutting an In-Line Dead-end Single Phase
Protective Grounding Single Phase Tangent
A5 Insulator Change Transformer Pole
C5.21L Three Phase Dead End Insulator Changeout
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives.
Voltage Regulator Bypass
Wye/Delta 120/240 4 wire Transformer Bank
A2 Insulator Changeout Energized
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Single Phase Pole Mounted
Lineman driving a bucket truck, rolled the truck and was killed
A1 Insulator Changeout Energized
Presentation transcript:

Contact Accident August 8, 2017 Crew: Foreman Mike **** Bucket Operator Justin **** Digger Clint **** Groundman Matt ****

Contact Accident August 8, 2017 Task – remove existing 40-6 pole (A6.7 & R1.1) and install 45-2 pole (VC1.11L & A5.9) Location – just outside of Linn – on Buckendorf Lane Time – approximately 11:05 a.m. Weather – clear and calm, very mild temperature Conditions – pole is located near gravel roadway with a fence running parallel to the roadway – landowner thought to not be cooperative Precautions taken – OCR was set to non-reclose, trucks were grounded

Contact Accident August 8, 2017 Bucket 31 Contact location Digger 26

Contact Accident August 8, 2017

Contact Accident August 8, 2017

Contact Accident August 8, 2017 Overview: Crew removed old conductor from pole (energized) and had it in the jib, held approximately 20’ away from hole where new pole was to be set. Digger operator was using a remote and standing next to the Foreman who was handling the end of the pole, helping to guide it into the hole. Groundman was observing the bucket and watching the wire in the air. Bucket operator checked tension on the wire by pulling back on it – when he released the wire it flew out of the wire-holder on the end of the jib. Wire came back towards the new pole, grazing the pole tongs, and made contact with the new pole. Foreman did not have gloves on. No cover-up on the line. Digger operator was not making contact with the pole. Groundman was in the clear. Foreman felt the shock and got away from the pole.

Contact Accident August 8, 2017 Post-accident: Crew was not immediately aware the Foreman had been shocked. Foreman indicated to digger operator he had been shocked but didn’t think anything was wrong. Crew came back to the Linn building to pick up OCR’s then drove back to the jobsite. At the jobsite the Foreman was complaining of a headache and chest pain. Foreman made a phone call to District Supervisor and asked him to come to the jobsite. Once on site the District Supervisor called Safety Coordinator and reported what had occurred and asked for directions on how to proceed. Foreman was taken to University Hospital burn unit for treatment. Crew was told to stand down and return to building. Road was one lane, trucks had to be moved to get back out of site. Foreman was evaluated and released – no injuries and no treatment needed Jib mounted wire-holder was removed and tagged out of service

Contact Accident August 8, 2017 Investigation: Roger and Bill drove to accident scene and interviewed crew members immediately after the accident was reported. MECIP conducted a comprehensive investigation on August 9, 2017. Investigation included visiting the site and taking pictures/measurements, crew interviews and follow-up. The safety committee participated in the on-site portion of the investigation The following notifications were made post-accident – Federated Rural Insurance, MECIP, AMEC, and **MO Public Service Commission **Mo Public Service Commission only requires notification in case of hospitalization – TREC was allowed to not report.

Contact Accident August 8, 2017 Preliminary investigation findings: Crew failed to recognize the hazard the wire presented if it were to come loose from the wire-holder No cover-up was used on the energized wire or the pole being set No rubber gloves were being worn by the person handling the pole Unwritten working rules are in place that are not in sync with the safety manual Documented job-briefing could not be verified due to crew erasing the board at their next job

Contact Accident August 8, 2017 This is the wire-holder that was in use the day of the accident. Cursory inspection did not show any obvious wear or damage to any part. The truck was fitted with a new wire-holder and this will be sent back to the manufacturer for further evaluation. Operator stated he was not sure the gate was securely latched.

Contact Accident August 8, 2017 Questions…