Session #5 Closing Status November , 2003

Slides:



Advertisements
Similar presentations
November 13, 2003IEEE Albuquerque Plenary Session 1 Moving Forward Robert D.Love LAN Connect Consultants C /113.
Advertisements

Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
March 14, 2005Chair, IEEE Opening March 2005 Plenary Session #13 Jerry Upton- Chair Gang Wu – Procedural Vice Chair.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
Doc.: IEEE Submission November 2004 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
May 16, 2005Chair, IEEE May 16, 2005Chair, IEEE Next Steps & Action Items from March 2005 Plenary Status Review - - May 2005 Interim.
Doc.: IEEE Submission March 2008 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
September 13, 2004Chair, IEEE Joint Opening September 2004 Interim Session #10 Jerry Upton- Chair Gang Wu – Procedural.
Vivek Gupta, Chair WG Closing Plenary IEEE Media Independent Handover Services Session #15 San Diego, California Vivek Gupta
TGn Chair’s Status Update
January Session Supplementary Material
Opening March 2005 Plenary Session #13
Evaluation Criteria and Traffic Models Status Update
IEEE TGa Project Timeline
22 March Agenda Opening comments and attendance
Project: IEEE P Coexistence TAG
Jan Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, January 2003 Date Submitted:
Agenda for IEEE Coexistence SC meeting in Chicago in March 2018
IEEE Task Group G Status Update
Roger Marks (Huawei) capable 5 November 2018
doc.: IEEE /468r0 November 11-15, 2002 Hyatt Regency Kauai
IEEE Task Group G Adopted Agenda for January 2001 Session
Opening May 2005 Interim Session #14
IEEE C /36 Project IEEE Working Group on Mobile Broadband Wireless Access Title Proposed Work Plan.
IEEE Working Group on Mobile Broadband Wireless Access
September 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: f Task Group Closing Report for.
July 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, July 2002 Date Submitted:
Submission Title: [ e Closing Report for November 2015 Session]
Hyatt Regency Albuquerque 330 Tijeras, Albuquerque, NM 87102, USA
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Information on IEEE IG LPWA to ETSI.
Sept 24, 2009 Waikoloa, Hawaii Session #63.5
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w November 2018 Closing Report]
Roger Marks (Huawei) capable 12 September 2018
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA November 2016 Closing Report]
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
IMT-Advanced Closing Report
TGn Closing Report November 2003
February 19 July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4e Closing Report for Denver.
Roger Marks (Huawei) capable 16 January 2019
doc.: IEEE <doc#>
TGn Chair’s Status Update
IEEE 802 EC Privacy Recommendation SG November, 2014, Report to 802 EC
IEEE P Working Group for Wireless Personal Area Networks
Policies, Procedures, and Best Practices IEEE AESS PANELS 2019 Prepared by the Technical Operations Committee Contents: Applying for Panel Approval Forming.
Vertical Applications TAG
IEEE Task Group G Adopted Agenda for January 2001 Session
Roger Marks (Huawei) capable 13 March 2019
Hilton Portland & Executive Tower
November 2001 doc.: IEEE /468r0 July
Roger Marks (Huawei) capable 9 January 2019
Opening Sept Interim Session #16
doc.: IEEE <doc#>
Opening March 2006 Plenary Session #19
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA January 2017 Closing Report] Date.
November 2001 doc.: IEEE /468r0 November
doc.: IEEE /468r0 March 10-14, 2003 Hyatt Regency DFW
Coexistence CG Chair’s Report to the Singapore Meeting
Task Group AY May 2016 Closing Report
Roger Marks (Huawei) capable 15 July 2019
Roger Marks (Huawei) capable 18 July 2019
IEEE WG Policies and Procedures Update
IEEE 802 Opening Plenary Session #7
January Session Supplementary Material
Roger Marks (Huawei) capable 16 September 2019
Presentation transcript:

802.20 Session #5 Closing Status November 10- 13, 2003 IEEE 802.20-03/21 802.20 Session #5 Closing Status November 10- 13, 2003 Jerry Upton- Chair jerry.upton@ieee.org Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice Chair 802.20 11/14/03

802.20 Status and Session #5 Activities Overview Three e-mail Correspondence Groups formed during the May session and a Fourth in the July session: Requirements: stds-80220-requirements@ieee.org Channel and Traffic Models: stds-80220-ch-models@ieee.org Evaluation Criteria: stds-80220-eval-criteria@ieee.org Coexistence Issues: stds-80220-coexistence@ieee.org Session focused on these Correspondence Groups efforts and the progress on their documents. Seven new Contributions were reviewed in addition to CG readouts. Attendance approx. 150 802.20 11/14/03

802.20 Session #5 Activities Overview Requirements Correspondence Group Readout of Progression: Four drafting groups formed for the week Reviewed Documents, new drafts, and arrived at consensus on some Sections Evaluation Criteria CG Readout of Progression: Reviewed Document, and new drafts Channel & Traffic Models CG Readout of Progression: No Updates on Traffic Models; Editor resigned; Eval. Criteria Editor assumed responsibility Reviewed Documents, and new drafts Coexistence CG Recommendation: Proposal for Study Group was not supported 802.20 11/14/03

Proposed Interim Meetings Reviewed – No Objections from Members Next Session Planning-Vancouver Jan. 11-16, 2004 Discussion on Proposed Plan to Increase Progress and Focus Consensus Efforts Given lack of progress on addressing a number of key items in the Correspondence Groups the following plan was agreed : Consensus Efforts should Focus on a Small Number of Key Items 2. Chair and CG Editors will propose a focus list to members on the reflector 3. The Agreed List will become the principle agenda for January 4. Contributions and Proposals for those items will actively be solicited 5. The Correspondence Group will continue work via the email reflector based upon updated documents per this session. 6. Conference calls will continue for the CGs with published schedules May 9-14, Hyatt Anaheim Sept. 12 – 17, Berlin Proposed Interim Meetings Reviewed – No Objections from Members 802.20 11/14/03