Swaken Port.

Slides:



Advertisements
Similar presentations
A Versatile Tool for Tank Protection
Advertisements

$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
GAME RULES Chose teams One team, picks one case The team opens up six of the remaining 25 cases. The Banker makes an offer. If the team declines they.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
A never-ending source of energy. Relatively high energy content A never ending energy source Almost everyone wants to dispose of it Environmental issue.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Welcome to Who Wants to be a Millionaire
0 SPANISH MARITIME SAFETY AGENCY SASEMAR 8th MCMP, March 2005.
Some Practice Questions in Engineering Economics
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
An Economic Solution to Dry and Densify Ligno-Cellulosic Biomass The BioCompactor Technology The BioCompactor Company, LLC BioBriquet ® Herbaceous Feedstock.
DEVELOPMENT AND APPLICATION OF PROMISING TECHNOLOGIES FOR
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
SHILPA STEEL & POWER LIMITED
Not Just for Bottled Water Any More!
CALDSTEEL PRESENTATION. METALWORK INDUSTRIAL PROJECTS ASSEMBLY INDUSTRIAL.
Storage of Flammable and Combustible Liquids
ORLEN GAZ - LPG market leader
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
Boilers & Thermic Fluid Heaters
Definition of Boilers Boiler
Power Plant Construction and QA/QC Section 2.3– Steam Generators
BOILER TRAINING Mr. Customer – Site specific
Laddomat 21 For accumulation when using a wood-fired boiler Picture 1
VINSON ECO ENERGY (INDIA) PVT. LTD
1 Oil shale – viewed in the light of the Estonian experience.
Buckeye Wood Energy Converting Waste Wood Into Energy.
Saving Energy In Schools Okehampton College - Devon.
ACTIVE LEARNING PROCESS
Energy Efficient Steam Systems
BIOENERGY.
Operating for over 30 years
PRESENTED BY: FELIX A. NEGRON AMERICAN PRECIOUS METAL RECYCLING LLC As of 23 February Mining Projects in 7 Countries.
Building Star and the HVAC Industry David Calabrese, Sr. Vice President, Public Policy.
Drilling Fluid Processing Equipment and Design
Hoovers Biodiesel Programs September, Our Mayor and City Council.
Applications Problem Solving. 6/25/2013 Applications 2 Four-step Method 1. Define variables Name the quantities to be found Write these down Example:
Pressure = force area = 12 N 25 cm 2 = 0.48 N/cm 2.
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Functions of Several Variables OBJECTIVE Find a function value for a function of several variables.
QENERGY Europe Initiating the LNG Bunkering Project LNG as the basic ship fuel.
Farm-scale anaerobic digestion at Walford & North Shropshire College Jon Parry Director of Walford.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Another Presentation © All Rights Reserved.
Another Presentation © All Rights Reserved.
AIA LOGISTICS. Quality Management Policy 1.Delivery cargo on-time, with complete and safety 2.Staff improvement program and encourage to practice quality.
JEBEL ALI 14 th FEBRUARY 2008 OLIVIER ROUSSEAUX AREA SALES MANAGER FLAT STORAGE Jebel Ali – 14/02/08.
GREEN SOLUTION FOR SCRAP TIRES and Plastics 2014.
Sonat Exploration Company Vessel Failure
Cellulose Fiber Evaluation for Asphalt Terminals J.Rettenmaier USA Cellulose Fiber Additive For Asphalt Terminals J. Sullivan Sales LLC.
Larry Behan Construction – Auction Tuesday 14 th September 2010 – Dublin Plant 2 Marini MAP Serial No /99.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
Limited Liability Company 2011 june. 1 Description of the location 2 Main characteristics 3 Capacity and technological process 4 Services 5 Prospects.
Welcome To Our 14 th Annual All Hands Meeting Sal Chiarelli, Director of Physical Plant, 9/16/2014.
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
WASTEWATER RECEPTION FACILITIES AT PORT OF HELSINKI Kaarina Vuorivirta Quality and Environment Manager Port of Helsinki.
1 Acetone, 2-Propanol H 2 Acetone 2-Propanol L2 Acetone, 2-Propanol L201 L101L1 L3 L4 L10 L9 Condenser Reboiler Distillation Column Endothermic Reactor.
Petroleum Production Fire Suppression
Message of the Managing Director EXCELLENT TRANSPORT NETWORK(ETN) is established in 2007 as one of the specialized Services providing company to Oil and.
Allied African Co. Ltd.  We are bulk bitumen traders mainly the bulk bitumen.  Head office is located in Khartoum – Sudan.  Our bulk bitumen terminal.
Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit.
11. 2 Steam Energy Energy that comes from the push of steam.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
West Memphis Terminal Procedures EQU-604-WM Oil Water Separator Alarms Influent to Lift Station #40 08/30/2007 2/25/20161 Oil Water Separator – Influent.
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
PowerfulVersatile. CIVIL PRO Civilpro Pty Ltd have recently added to their Fleet, a number of versatile track vehicles to service and support the construction.
Oil Facility.
Engineering Technology Division
Asphalt Drum Mixing Plant Asphalt drum mix plantAsphalt drum mix plant is one of the road construction machinery.This plant is well suited for the homogenous.
Presentation transcript:

Swaken Port

Receiving bitumen From Vessel

Receiving Pipeline At Allied Africa's Terminal

Storage Tanks (Total Capacity 2,500 M Tons) T1= 2,,000 M TON T2= 500 M TON

Loading Rack 2No.Loading Arms Weight Bridge

(2) No. Boilers

Inlet Heating Valves Outlet Heating Valves

100 No. Of Bitu – trainers each of 20 M TON Capacity +249 155 18 18 25

Bitumen Pumps + Mobile Crane 2 No. Pumps

Loading The Bitumen Into The Bitu-tainers

2 No. 200 KVA Generators + (SGM) Software

The Added Value Of Using Bulk Packed Bitumen

Asphalt Plant

The use of Bulk Bitumen ensures a homogenous Source Of Bitumen

How Much Does It Cost ? What Is The Solution ???

The Solution Is the Use Of Bulk bitumen … Think Green When The Situation Is Black

The use of Bulk Bitumen Reduces the operation cost by eliminating the Waste in Barrels (5 – 10 %).

The use of Bulk Bitumen Reduces the operation cost by eliminating the need of the loader

The use of Bulk Bitumen Reduces the operation cost by eliminating the casual labors

The use of Bulk Bitumen Eliminates the Fire Hazard In The Boiler, Bitumen Tank, Gas oil Tank & The Asphalt Plant

The use of Bulk Bitumen Reduces the Operation Cost & Storage Area

The use of Bulk Bitumen Is more Saver To The Staff & Friendly To The Environment Pollution