4-6 GeV CEBAF Reliability Overview

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Configuration Management
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Making the Case for Metadata at SRS-NSF National Science Foundation Division of Science Resources Statistics Jeri Mulrow, Geetha Srinivasarao, and John.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Emerging Trends in the Technology Job Market.  According to a recent Bureau of Labor Statistics study, eight of the 10 fastest- growing jobs are computer-related.
8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
Swami NatarajanJune 17, 2015 RIT Software Engineering Reliability Engineering.
SE 450 Software Processes & Product Metrics Reliability Engineering.
Configuration Management IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
CS 325: Software Engineering March 26, 2015 Software Quality Assurance Software Metrics Defect Injection Software Quality Lifecycle Measuring Progress.
Configuration Management IACT 418/918 Autumn 2005 Gene Awyzio SITACS University of Wollongong.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
Lean Principles for Managers (1 day) Understand the true purpose of Lean and its application. Includes a simple simulation. Managing a Process (2 days)
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Page # 1 Calculating the Business Value of Information Technology “The ROI of IT” Presented to Healthcare Information & Management Systems Society ME-PI.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Introduction to availability modelling in ELMAS Arto Niemi.
CONFIDENTIAL INFORMATION CONTAINED WITHIN 9200 – J2EE Performance Tuning How-to  Michael J. Rozlog  Chief Technical Architect  Borland Software Corporation.
PLC Workshop at ITER, 4-5 th of December 2014 A. Nordt, ESS, Lund/Sweden.
Web Application for Mobile access to students exam Information.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
Downtime Reduction Ideas for a Symposium Presentation and Training
A Blueprint for Successful Web Sites Information Architecture & Web Design Web June 18, 2003 Beth Bailey Kim Eke Elizabeth Pyatt.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Proton Source Task Force William Pellico Mu2e Working Group Meeting (WGM) on Wednesday, Jul 21.
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
Nikki Tilson – Assessment and Achievement Adviser (Nursery and Primary) Assessment Update September 2015.
U-spin and the Radiative decay of Strange Baryons K. Hicks and D.Keller EM Transition Form Factor Workshop October 13, 2008.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
Obsolescence and Anticipated Upgrades Curt Hovater.
ACC 220 Week 1 Checkpoint Career Opportunities CheckPoint: Career Opportunities Visit the U.S. Department of Labor, Bureau of Labor Statistics at
Configuration Management
Software Metrics and Reliability
Do you believe in Operation Statistics
SNS Status Report Karen S. White 10/15/08.
Dynamic Flow Mapping Status Report 2
Accelerator Reliability and Software
Jefferson Lab Reliability Task Force and Initiatives
Configuration Management
Software Reliability PPT BY:Dr. R. Mall 7/5/2018.
IENG 451 / 452 Stability: Total Productive Maintenance
Hot Checkout System for LERF Resuscitation
Update on Linac4 Status, Reliability Run and Modelling
RF Gradient Data And Reporting Tools
Operations Department
Discussion of Reliability at CEBAF
Discussion of Reliability at CEBAF
Operations Department
Thoughts on Energy Reach
Process and Project Metrics
Performance Recovery at CEBAF
Chapter-5 Traffic Engineering.
AVAILABILITY PERFORMANCE
Update on the JLEIC pCDR
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

4-6 GeV CEBAF Reliability Overview Operations StayTreat 6/28/16 Steve Suhring

Early Challenges at CEBAF New machine From the ground up First large scale application of SRF No ‘statistics’ on system/component performance New People No shared experience New Management Clarity of vision Practices under development HCO, on-call, repair escalation 4/18/2019

Vocabulary Availability / Reliability MTTR, MTBF*, etc. Not cleanly understood Machine? System? Component? MTTR, MTBF*, etc. Theoretically useful Difficult early on when statistics weren’t there *Mean Time To Repair, Mean Time Between Failures 4/18/2019

CEBAF Vocabulary Lost Time: Not doing Physics, for whatever reason New phrase No ‘free ride’ for simultaneous failures Accountability for Beam Studies time Whack-a-Mole: a. An ancient arcade game revolving around a mallet and a mole. b. CEBAF slang for putting effort where effort is due. 4/18/2019

1994 First Beam on Target at JLab

Lost Time Tracking 1st: Dredging through paper logbooks 2nd: Simple web interface for Operations to use Records dumped into an Excel spreadsheet. Labor intensive to edit, parse, use. This effort resulted in a large database used to guide CEBAF improvement efforts, and b. for reliability statistics as new machines were in the planning stages. 4/18/2019

Lost Time Spreadsheet Eye Chart 4/18/2019

Lost Time Spreadsheet Eye Chart 4/18/2019

Lost Time Trending Weekly Reports Lost Time Roll-Up Recent Opportunities for Improvement Comparison to previous week Lost Time Roll-Up Included Availability numbers taken from DOE Metric / Contract definitions 4/18/2019

Weekly Report Example

XX 4/18/2019

Summary from 2002 Accelerator Reliability Workshop We do a good job responding to problems as they arise. BUT Engineering support is needed for expanded early warning (predictive) diagnostics. Detailed analysis of system failures is necessary to raise machine availability to >80%. Maintaining machine availability over the long term will require significant resource commitment. 4/18/2019

4/6GeV Availability Trend 4/18/2019

0L03-2 instability RF Separator Amp Chopper 1Y vacuum interlock

T3 replacement

1L04 Renaissance failure & removal Initial C100s

UPGRADE CAPTION CONTEST THE BAD NEWS IS THAT IT WILL BE BUILT ON THE BACK OF THE OLD 6GeV MACHINE. THE GOOD NEWS IS THAT THE DOE IS GOING TO SPONSOR A 12 GeV UPGRADE. 4/18/2019

Issues and Open Questions How can the machine reliability and availability numbers be improved? 4/18/2019

The Reliability Challenge 4/18/2019

MAM3S03 mismatch MARC4A / RSEP9A regulation Shunt airflow