Status and New Developments of ALBA RF Systems

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
SESAME Storage Ring RF-System
13 th ESLS RF meeting, DESY, 30/09 – 01/10/2009J. Jacob: Status of the RF Upgrade at the ESRF1 13 th ESLS RF Meeting 2009 DESY, 30 th September – 1 st.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
SPX High Level RF and RF Interlock Systems WBS U Doug Horan RF Systems Engineer Accelerator Systems Division/RF Group DOE Lehman CD-2 Review.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
STATUS OF THE SOLEIL RF SYSTEM
February 2010 ALBA Synchrotron Light Source Francis Perez.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Other Utilities of ALBA LLRF
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Solid State Amplifier Circuit Design Student: Branko Popovic Advisor: Geoff Waldschmidt.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Operation Status of the RF Systems and Taiwan Photon Source
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
High Power RF Solid State Amplifiers at FREIA
Status of the ELETTRA RF Plants
Report Technical Director Storage-Ring-Installation Completed
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Status of BESSY II and bERLinPro
Status of RF operation and RF upgrade
Communication 40 GHz Anurag Nigam.
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Solid State Amplifier Development at PSI
High Energy Proton Synchrotrons
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
Status and New Developments of RF Systems of ALBA
Status of the ALS and APEX RF Systems at LBNL
RF interlocks for higher intensities (LMC 15 June)
Developments of High CW RF Power Solid State Amplifiers at SOLEIL
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
12 GHz High Power RF components requirements for CEA activities
BEPCII RF POWER SOURCE AND INPUT COUPLER
CEPC RF Power Sources System
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status of the ASTRID2 RF systems
CEPC RF Power Source System
RF introduction Anders Sunesson RF group leader
Status and New Developments of ALBA RF Systems
IOT operation in the SPS Long term experience TWC 800 MHz
SOLEIL Long Term SSPA Operational Experience
Presentation transcript:

Status and New Developments of ALBA RF Systems ESLS RF Meeting – Soleil – Nov 2018 Angela Salom on behalf of RF team: Francis Perez, Bea Bravo, Jesus Ocampo, Pol Solans and Zahra Hazami (PhD)

Outline ALBA RF Overview 2018 Operation RF upgrades Statistics Main operation issues of RF systems RF upgrades 50kW SSPA for Booster Fiber optics of cavities HW of LLRF New developments and future upgrades 3rd Harmonic Active Cavity with transdampers 1.5GHz SSA transmitter Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

ALBA RF Overview Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

RF at ALBA Overview Linac Booster SR Booster RF Linac 2 Klystrons + WG system + travelling wave cavities at 3GHz 90keV to 100MeV Booster 50kW SSPA + WG System + 5-cell cavity @ 500MHz 100MeV to 3GeV SR 12 IOTs + WG system + 6 cavities @ 500MHz Beam stored @ 3GeV Storage Ring RF LINAC RF Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Service Area: RF amplifier + Auxiliaries BOOSTER RF SSPA Amp IOT Amp WG + Aux WG + AUX IOT HVPS Service Area: RF amplifier + Auxiliaries Tunnel: 5Cell Cavity – 500MHz Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018 5

Tunnel: Dampy Cavities Service Area: RF amplifier + Auxiliaries SR RF WG + AUX IOT Amp IOT Amp IOT Amp IOT Amp IOT HVPS Tunnel: Dampy Cavities 1Cell – 500MHz Service Area: RF amplifier + Auxiliaries Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018 6

Operation Statistics Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

RF Statistics of 6 years operation Until june 2018 - Top-up 180mA From june 2018 on - 150mA to avoid quenches in SC Wiggler 2.3MV of RF Voltage RF ITCK Types 2013 2014 2015 2016 2017 2018 IOTs 147 84 49 36 52 Arcs cavity 158 99 87 58 61 12 Cooling 81 9 8 45 13 1 Other 107 89 66 88 56 Total RF interlocks 493 281 210 227 187 105 Beam Downtime due to RF (h) 38 43 23 11.2 12.3 10.64 Interlocks number reduced Only 15% of RF interlocks produce beam dumps Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Beam dumps due to RF interlocks Electrical noise produced by IOTs discharges (73%) Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

HVPS-I measurement of partner IOT after BCI in next plant Electrical noise induced by Body Current Interlocks Body current interlock in an IOT produce electrical noise in HVPS current measurement of partner IOTs IOT Amp Noise in HVPS-I meas. BCI in IOT 4 IOTs in Service Area HVPS-I measurement of partner IOT after BCI in next plant Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Provisional solutions Earth improvement IOTs and HVPS connected to earth using 60cm wide plates Earths of IOTs isolated from earth of neighbor IOT Analogue filter added to affected control signals Noise level reduced but not completely removed. IOT Trolley earth connection improved Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

IOTs Performance ALBA IOTs: At present 12 IOTs installed in SR from L3 and Thales Thales TH-794 kept as spare (started operation in 2012) Thales TH-795 in operation since 2015 L3 L4444C in operation since 2015 Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

RF Upgrades Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Booster IOT Tx replaced by SSPA IOT Amp WG + Aux IOT HVPS Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

50kW SSPA for Booster New SSPA Tx in Booster SAT problems No High Voltage, no vacuum, no ceramics Modularity: 12 modules with 8 transistors each. Only 10 modules required for operation at 35kW Hot Swap of modules possible in operation at full power SAT problems Noise induced in LLRF Drive by power supplies of SSPA  Optical link installed between LLRF and SSPA to isolate earths Already 3 modules replaced Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

General Parameters of 50kW SSPA 96 transistors – 50V – 600W 12 modules – water cooled 500MHz CW, 48kW @ 2dB compression Gain > 78dB, Effiencieny > 60% Hot swap Tx Electrical Scheme Module Electrical Scheme Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Technology of 50kW SSPA for Booster No pre-driver needed 12 Modules combined in Groups of 4 using Gysel Topology Basic Module with 8 transistors grouped in pairs: 3 Power Supply Sets per module – 3000W (only 2 needed) 4 Different pre-programmed Drain Voltages: 41V, 43V, 48V and 50V P Out = 4200W per module Basic unit with 2 transistors – 600W @ 50V Coaxial baluns for push-pull structure Gate voltage adjustable by potentiometer Main lines of the 4-way combiner Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Other upgrades Cavities fiber optics replaced inside tunnel Fibers inside tunnel got darkened due to radiation 30m fibers replaced by 25m fiber outside tunnel + 5m of disposable fiber inside tunnel joint by a splice LLRF HW Motherboard being replaced Present LLRF HW based on Windows XP drivers FPGA board being replaced by stand-alone system based on Linux drivers: picodigitizer Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Future Upgrades and New Developments Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

1.5GHz RF System CLIC Collaboration to develop 1.5GHz System between CELLS and CERN To be used as an RF accelerator system in CLIC To be used as third harmonic cavity in CELLS Characteristics of 1.5GHz for ALBA 4 x SSA Tx: 25kW – 1.5GHz 4 x Third Harmonic Cavities: 200kV Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

1.5GHz HOM Active Cavity Cavity CST Simulaions Cavity: 1/3 Direct scale of Dampy Rs = 1.5MΩ Q = 17000 Fr = 1499MHz V = 215kV New design of dampers EM design and Mechanical design finished Tender to be published by the end of the year Commissioning expected in 2020 Thanks Bea for all the work!!! Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Transdampers Coaxial damper transition to waveguide No ferrites required External load to dissipate power of HOM Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

1.5GHz SSA SSA 250W module based on GaN CREE CGH14250 Input and output matching done with stubs No baluns and no trimmers water cooling VGG DC feed VDD Copper base plate GND DC block DC block Transistor support Thermal inspections Input matching Output matching transistor 3rd PA module design under test Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

1.5GHz SSA: Power tests of 4 modules Values at 37.5dBm input Board Gain [dB] Power [W] Efficiency [%] J tem [ºC] C temp [ºC] AM/PM [ºC] PCB1 16.58 256.00 71.11 53 109 -32.40 PCB2 16.62 258.00 71.67 57 122 -38.34 PCB3 16.51 252.00 73.04 54 113 -32.94 PCB4 16.43 254.00 68.65 50 130 - Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

1.5GHz SSA 1kW tests 1 kW Next step 4:1 combiner 250 W PA 1:4 divider Circulator Coupler Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Conclusions RF Operation: Future RF Upgrades: 1 or 2 RF interlocks per week, but “only” 1 beam dump every 1 or 2 months Main Interlock sources: Electrical noise New SSPA installed in Booster Future RF Upgrades: 3rd Harmonic Cavity prototype 1.5GHz SSPA Tx Status & New Developments of ALBA RF Systems - ESLS-RF Meeting - Nov 2018

Thanks for your attention Questions?