Portfolio Committee on Energy

Slides:



Advertisements
Similar presentations
Protection of the Poor through the implementation of the Social Electricity Tariffs: The South African Experience Author & Presenter: S D Salvoldi, B Comm,
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
OECD WORKSHOP ON COMPETITIVE CITIES AND CLIMATE CHANGE: CHALLENGES AND OPPORTUNITIES International Energy Agency, Paris - 30 November 2007 Ivana Capozza,
1 Alignment to the Local Government Turn Around Strategy (LGTAS)
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
REGULATION OF THE WATER SECTOR IN SOUTH AFRICA: DEALING WITH THE REALITIES OF POVERTY AND INEQUALITY Mr. Silas Mbedzi Chief Director Institutional Oversight.
 Local government is a constitutional sphere of government. The legal framework for local government is contained in Chapter 7 of the Constitution of.
CENTLEC (SOC) LTD (Addressing EDI Service Delivery Challenges) Centlec Delegation (SOC) LTD Joint Hearing between PC on Energy & PC on Cooperative Governance.
1 Presentation By: Mr.O. Aphane Acting Deputy Director General: Electricity, Nuclear and Clean Energy (on behalf of the Director General, Ms N Magubane)
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
COMMENTS ON THE APPROPRIATION BILL 2011 STANDING COMMITTEE OF APPROPRIATIONS 13 A PRIL 2011 For an Equitable Sharing of National Revenue.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
1 PRESENTATION TO PORTFOLIO COMMITTEE ON ENERGY ON MUNICIPAL ENERGY EFFICIENCY PROGRAMMES 31 January 2013 Linda Manyuchi Technical Specialist:
1 Addressing the dual regulatory system between NERSA and Municipalities on supply and distribution of electricity - the role and contribution.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Slide 1 Portfolio Committee on Energy – Briefing on the Electricity Distribution Industry (EDI) 25 July 2012.
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
DEPARTMENT OF MINERALS AND ENERGY Parliamentary Portfolio Committee Briefing in respect of ELECTRICITY BASIC SERVICES SUPPORT TARIFF (EBSST) 06 SEPTEMBER.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Portfolio Committee on Energy Briefing on the Approach to Distribution Asset Management (ADAM) Pilot Project 01 November 2013.
1 ELECTRICITY REGULATION AMENDMENT BILL. 2 BACKGROUND Industry structure Electricity value chain Consequences of unregulated “reticulation” History in.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Presentation to the Portfolio Committee on Provincial & Local Government Branch: Free Basic Services and Infrastructure Mr Yusuf Patel 19 ~ 20 February.
1 Select Committee on Economic Development Progress relating to the implementation of Integrated National Electrification Programme (INEP)
PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON PUBLIC WORKS 18 Feb 2004 CAPE TOWN PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON PUBLIC.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Presentation to the Portfolio Committee on Energy
Municipal Water Infrastructure Grant (MWIG)
ELECTRICITY DISTRIBUTION INDUSTRY DECISION
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Department of Cooperative Governance
NATIONAL RED PUBLIC HEARINGS
Michael Maphosa and Patrick Mabuza
ELECTRICITY REGULATION AMENDMENT BILL
Parliament and the National Budget Process
Danube Water Conference, Vienna, May 2017
Content Overview of the Regulatory Environment Regarding The Electricity Distribution Industry in South Africa Who is NERSA? Regulatory Principles The.
MAINSTREAMING OF WOMEN, CHILDREN AND PEOPLE WITH DISABILITIES’ CONSIDERATIONS IN RELATION TO THE ENERGY SECTOR Presentation to the Joint Meeting of the.
FREE BASIC ELECTRICITY/FREE BASIC ALTERNATIVE ENERGY
NERSA presentation at the PPC meeting held on 24 May 2006
COMMENTS ON THE DEBT OWED BY MUNICIPALITIES TO WATER BOARDS SALGA INPUT 20 MARCH 2007 BY WILLIAM MORAKA.
Your partner in service delivery and development
City of Cape Town Submission on EDIR
Briefing to the Portfolio Committee on Energy
Translating political objectives into sound policy proposals
Portfolio Committee On Sports and Recreation 7 November 2017
Parliamentary Portfolio Committee on Energy
FFC Briefing to the Portfolio Committee on Energy
Single Integrated Approach to Municipal Revenue Management
REVENUE MANAGEMENT MASTER CLASS
ADB’s experience with financing renewable energy projects
Scope of Coverage Economic Regulation of Transmission;
FFC’S RESPONSE TO THE MTBPS
Topic: Possible Restructuring of the Electricity Distribution Industry
MUNICIPAL ENERGY EFFICIENCY PROGRAMMES MEETING OF THE SELECT COMMITTEE ON ECONOMIC DEVELOPMENT, 7 AUGUST 2012 Linda Manyuchi Technical Specialist: Energy.
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
The Electricity Distribution Industry
Director-General: Mr. E Africa
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
OUTLINE Legislative context, NERSA vision and NERSA mission
Synergies between NDCs & SDGs; Integration into National Planning
SALGA Comments on the 2011 MTBPS Standing Committee on Appropriations
VOTE 31: HUMAN SETTLEMENTS BUDGET ANAYLYSIS 2014/15
Presentation transcript:

Portfolio Committee on Energy 31 May 2011 The Electricity Distribution Industry: from a municipal perspective

Restructuring of the EDI sector In 2009 LG at a SALGA NMA took a decision to recommit to the restructuring of the electricity distribution industry in order to address the following challenges among others: Misalignment between the EDI and the current architecture of the local government fiscal framework (very important, from a local government perspective) High inefficiency of the industry owing to fragmentation Inability to leverage economies of scale in respect of investing in assets, sharing of facilities, services, people development Inequitable treatment of consumers across the country

Restructuring of the EDI sector In terms of the current architecture of the local government fiscal framework, municipalities are expected to primarily rely on local revenue (property rates and service charges linked to their tradable services functions) in order to finance the performance of their constitutional mandate. Electricity distribution income and property rates are currently the key sources of local revenue for municipalities – water services and solid waste management services operated at break-even or deficit) Electricity distribution income is a key contributor to municipal revenue without which municipalities will not be able to meet their obligations.

Restructuring of the EDI sector A significant portion of EDI income accrues to a national entity, Eskom, from which local government draws no financial benefit. Eskom services key industrial customers as well as households and businesses in the medium and smaller size municipalities that are not licensed to be distributors. Smaller and medium size municipalities do not get any financial benefit from EDI in the areas of where Eskom is providing distribution services.

Restructuring of the EDI sector Income from the provision services to key industrial customers does not accrue to local government at all. This undermines the current architecture of the local government fiscal framework and contributes to financial viability challenges of some municipalities Municipality are not able to exercise the function of being the service authority over Eskom – they are not able to set service delivery expectations or determine investment priorities in their areas (typically leading to disarticulations between IDPs and Eskom Infrastructure investment Eskom refuses to sign SLAs with municipalities where it is a distributor. It sees itself as a service authority in its own right, only accountable to NERSA and not municipalities This constitutes a critical element of the problem statement that SALGA believed needed to be resolved as part of the EDIR process. This and other elements of the EDI restructuring issues remain unresolved

Investment in infrastructure During the long period of uncertainty regarding future ownership of distribution assets there has been a significant underinvestment in infrastructure This added to inherited maintenance backlogs that also accumulated as a result of the country prioritization of extension of infrastructure to the unserved rather than focusing on maintaining infrastructure that served a minority Study done by EDIH in 2008 estimated that the backlog was R27billion growing at R2,5 billion per annum Costs of uptake of new capacity There is a need for SALGA, DoE and NT to work together to develop a strategy to address this challenge as part of developing a way forward in respect of creating a sustainable industry

Distribution price regulation issues The various consecutive high Eskom electricity price increases have given rise to a debate about protection of the poor against high electricity cost In February 2010 NERSA required that Eskom rolls out IBT to conventionally metered domestic customers and later required the same for all domestic customers (conventional and prepaid meters) supplied by Eskom and municipalities The NERSA approach to the implementation of IBTs has raised problems in the industry.

Distribution price regulation issues While NERSA is commended on its efforts to provide relief for the low usage customers, unfortunately there are many shortcomings with its IBT version. E.g. Eskom data was used to develop a national tariff structure. This data is not relevant to individual municipalities and also does not adequately segment residential customers. The basis of a good tariff design is to use the customer data of the particular utility.

Distribution price regulation issues The NERSA IBT structure removed the previous capacity related signals included in existing tariffs. The IBT structure introduced a revenue risk by removing fixed charges Many non-poor customers will benefit from the tariff structure It does not take into account regulatory and EPP requirements regarding higher consumption customers paying fixed charges and time-of use rates.

Distribution price regulation issues The basis for determining the blocks, the rates and the increases to the rates appears arbitrary and difficult to justify on a national scale. The structure is based on REDs areas rather than income distribution characteristics of consumers in groupings of comparable municipalities The NERSA forced IBT application by Eskom on its conventionally metered customers has had a massive negative financial implication. This has caused the tariff to the rest of Eskom’s customer base to increase by a further 4.6% over and above the average increase granted by NERSA.

Distribution price regulation issues When Eskom applies the NERSA IBT it can hedge the impact on the non-domestic customers despite the fact that this impact is unsustainable. The impact on municipalities, even more so for the smaller ones, is just not viable. Typical results from the application of the NERSA IBT for municipalities are as follows: Loss of domestic revenue: about 25%. Loss as percentage of total revenue: about 10% Loss as a percentage of non-domestic revenue: about 25%

Distribution price regulation issues Despite various efforts by Eskom, SALGA and its member municipalities, NERSA has not been positive in entertaining any debate about alternatives to its version of IBT SALGA will, during 2011/12, continue to engage NERSA regarding the principles, design and implementation of IBT It will also support of individual municipalities that have applied for a deviation from the NERSA benchmarks

Curbing electricity theft LG experiences huge revenue loss due to electricity theft. E.g. in the last year the Cities of Cape Town and Joburg lost about R121 million R250 million worth of electricity due to illegal connections respectively. The impact of electricity theft is devastating for smaller distributing municipalities. Unfortunately despite its impact (financial, economic, loss of life, sustainability, quality and stability of electricity supply and future economic growth) electricity theft is still perceived as a minor offence In October 2010, SALGA partnered with Eskom, PRIMEDIA, Proudly SA, BUSA, Business Against Crime and Crime Line to launch of Operation Khanyisa (An anti electricity theft campaign aimed raising awareness about the criminal nature of this act establish mechanisms for the public top report and distributors to act on these reports). During 2011/12, SALGA will, with support from Eskom, strengthen its coordination of this campaign among municipalities

INEP The Integrated National Electrification Program is implemented through Eskom (where Eskom is a distributor) and municipalities in their areas of distribution There are cases where municipalities implement INEP projects in Eskom areas of distribution The electrification program is also an important means of curbing illegal connections Its has come to the attention of SALGA that some municipalities are slow in spending their INEP allocations There are also cases where municipalities do not have qualified electricity managers and depend entirely on self-interested consultants to apply and secure funding from INEP and MIG – no review of the appropriateness of proposed investments and quality of works – need some centralized capacity to provide technical support to undercapacited municipalities y

Restructuring of the EDI sector In SALGA’s view, all the above matters constitute elements of the EDI structural deficiencies In 2010 at a SALGA NMA Local government noted that, LG as a sphere of government whose performance of the Electricity Distribution function and whose revenues depends on the success of the service providers, have the most to lose if the outcome of the EDIR process was: unviable electricity distribution service providers (the REDs at the time); or Viable electricity distribution service providers but severely compromised municipalities And committed that local government should therefore play a leading role in shaping this outcome.

Restructuring of the EDI sector On the 8th of December 2010 Cabinet took a decision to discontinue EDI restructuring At the time of this decision: 154 of the 175 municipalities licensed to distribute electricity had signed the accession to the co-operative agreement 56 ring fenced electricity business But LG had identified 25 key deal issues that needed to be resolved towards the restructuring of the industry SALGA has not been favoured with the reasons for the Cabinet decision However, during 2011/12 SALGA wishes to partner with DoE in facilitating a session of LG and energy practitioners and leaders to propose a way forward in respect of creating a sustainable EDI

Energy efficiency program With support from SDC, SALGA is facilitating the implementation of the Energy Efficiency Program in Local government starting with 5 pilot municipalities that are considered secondary regional of economic development after the major cities (these are Rustenburg, Mbombela, Sol Plaatje, King Sabata Dalindyebo, Polokwane) This is both a climate change mitigation project and a response to the infrastructure capacity constraints in these municipalities. Implemented in collaboration with DoE, to achieve effective national, provincial and local government policy frameworks and tools for implementing and monitoring energy efficiency in particular the building sector During 2011/12 SALGA will complete the State of Energy reports in the affected municipalities and thereafter facilitate the development of Energy Efficiency Strategies, and business plans for specific projects. The projects may include solar water heating projects

Proposed priorities for the sector Research alternatives to the establishment of REDs as national government entities and convene a session of LG and energy practitioners and leaders to propose a way forward in respect of creating a sustainable EDI That agenda should, among others, deal with issues such as: Structural efficiencies Financing the backlog and future investment needs Pricing In areas such as Free State municipalities are exploring possibilities of establishing a province-wide municipal owned electricity services delivery vehicle –debates need to take into account issues of viability as well as ongoing debates about the future role of provinces and therefore the significance of provincial boundaries as development planning and management spaces Upscaling of the energy efficiency programmer and investment in alternative energy as a substitute to coal based energy in areas such as water heating Intensification of the fight against electricity theft Capacitating of new councilors

Thank You