Project Management What is it? The management and control of a group of interrelated tasks required to be completed in an efficient and timely manner.
Advertisements

Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Software Quality Assurance Inspection by Ross Simmerman Software developers follow a method of software quality assurance and try to eliminate bugs prior.
Managing a Project Using an Agile Approach and the PMBOK® Guide
Implementation of Project Governance at the Center Level
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
COMPGZ07 Project Management Presentations Graham Collins, UCL
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
Building Hotel reservation System !!! The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.
Project Post-Mortem University of California Berkeley Extension Copyright © 2008 Patrick McDermott From an AutoContent Wizard 10/27/2007.
SacProNet An Overview of Project Management Techniques.
Project Status Report Presenter Name Presentation Date.
Team Software Process (TSPi) CS4320 Fall TSP Strategy Provide a simple process framework based on the PSP. Use modest, well-defined problems. Develop.
Pre-Project Components
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Project Planning A2 ICT Edexcel. Learning Objective To look at ways of breaking down a project into manageable stages To produce a project plan with suitable.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
10.2 Manage Communications
Project Management.
Continuous Improvement Project (A Guideline For Sponsors)
Project Management Methodology Used in Responding to Publishers’ Surveys Presenters: Jay Johnson, Institutional Research and Planning Liana Crisan-Vandeborne,
Time Management.
Workplace Projects.
Annual Performance Management Cycle Management Training Tutorial
Working in Groups in Canvas
Software Verification and Validation
Presenter Name Presentation Date
TechStambha PMP Certification Training
[Project Name] Post-Mortem
PROJECT NAME POST-MORTEM
Project Implementation Plan
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
INF 337 Enthusiastic Study/snaptutorial.com
Project Charter <Project Name>
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Project Theory and Application
Guidance notes for Project Manager
Self Paced Training Module 3
Project Management.
[Project Name] Project Report
IS&T Project Reviews September 9, 2004.
Lecture # 3 Software Development Project Management
SEM Operations PE - Utilize project-management skills to improve workflow and minimize costs PI – Develop project plan.
Single Event Violations
Chapter 10 Object States and The Statechart Diagram
Engineering Project Project Management Project Management.
Click on the map on the wall to start your tour You need to look carefully at the information and enter your planned tour. Once you are ready click.
Welcome W 15 Introduction to Engineering Design II (IE 202)
CATHCA National Conference 2018
[Project Name] Post-Mortem Presentation Template
Project Name Post-Mortem
X-DIS/XBRL Phase 2 Kick-Off
Chapter # 4 Development and Quality Plans
Studio day : Monday February 4
Astea Mobile App Training
Attendance Codes Deb Palmer Pre-Service 2018
Setting up a project file
Importance of Project Schedules
Fahrig, R. SI Reorg Presentation: DCSI
Chapter 3: Project Integration Management
ECM SERVICES Group Stormwater Monitoring Program
Project Overview.
ISSUE MANAGEMENT PROCESS MONTH DAY, YEAR
Presentation transcript:

Issue Logs I want to implement a project by identifying, tracking and resolving issues Issue Logs

What is it and why should I use it? Issue Owner Date Opened Status Date Closed Resolution It rained for two days resulting in a significant work delay RS – Work Site Manager 11 July 11 July – Rain started in the morning . Workers went home 12 July noon– Rain stopped but workers did not report today 12 July afternoon – Inspected site and determined work could resume on 13th 13 July –Workers arrived & agree to work extra hours 13 July Workers agree to stay 3 extra hours for the next 2 days to make up for the rain delay What is it and why should I use it? This tool can help you track, manage and document issues. Once again this is an example the format, or number of columns, can vary according to a specific projects needs. The first column provides a description, in detail, of the issue at the point that it enters the log. The goal of the project management team is to manage this issue so that it can exit from the issue log without causing the project to get out of control. (this is normally a time cost scope issue) The second column specifies who will own and take the lead in resolving each issue. The date that the issue has been opened the date of resolution, along with a description of the status between those dates, are contained in the next three columns. Finally, the last column is a description of the resolution or solution that allowed this issue to be closed. That's really all that there is to and issues log – it is a relatively simple but powerful management tool. The actual log itself can be kept in a notebook, on a flipchart or recorded on a computer. It is important that the issues log be transparent – that the team members and other stakeholders can see how their complaints are being heard and responded to in a timely and responsible manner.

Reminder: Assumption = A statement (identified in order to complete cause-effect logic – mostly in logframes) Risk = A possibility (identified in order to be managed – using a risk register) Issue = A real problem (identified in order to be controlled –using an issues log) Remind the participants of the list they created earlier outlining What goes wrong in projects? How do you deal with them (think especially about how you deal with delays)? Although crashing and fast tracking can solve scheduling problems, we still need to look at the differences between Assumptions, risks and Issues and how we track and record them throughout the life of a project >>click Remember that there is often a relationship between an issue, a risk and an assumption. from the identification and design module that an assumption is: a statement identified in order to complete the cause – effect logic (or horizontal logic of the logframe). An assumptions is a positive statement that, when made negative, becomes a risk. Almost all of the assumptions in the logframe will become risks in the risk register but not all risks would have been assumptions – this is because some of the risks were not known during the identification and design phase. Reminder: Since risks will change over time, the Risk Register must be updated during implementation An issue, then, is: a happening identified in order to solve real problems. Not every risk will become an issue and issues will arise that were not on the risk register. The tool for managing issues is called an issues log.

Discussion: In your projects, how do you manage problems and changes?

Activity: Prepare an issue log for one of your projects. Issue Owner Date Opened Status Date Closed Resolution Prepare an issue log for one of your projects.