Summer Projects Patrick Willoughby Maintenance Engineering.

Slides:



Advertisements
Similar presentations
HVAC 11a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

VINSON ECO ENERGY (INDIA) PVT. LTD
Energy Efficient Steam Systems
Trane Voyager™ rooftop units
ENERGY SURVEYING Please Click through this presentation.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Source One Source One Network and Building Solutions.
Overview Payback Analysis NPV
Technological Research Centre of West Macedonia Grigoriadis Nick BEng MSc Civil Engineer.
Coastal Region Tornado Damage March 15, Plant McIntosh Steam Damage Notes verbatim from steam plant log book Bad lighting strike on unit. Mw’s dropped.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
“ Where Quality & Safety Are An Integral Part Of The Total Solution To Your Maintenance & Service Requirements ”
The art of Engineering
RETScreen® Energy Efficiency Projects
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
POWER PLANT.
Mammoth Product Training
Diesel Power Plant Mr.B.Ramesh, M.E.,(Ph.D) By
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Co-op Presentation Patrick Willoughby Three Rotations with Bayer Corporation: First – New Martinsville Plant, West Virginia Second and Third – Innovative.
ENGM 661 Engineering Economics Replacement Analysis.
Lockout/tagout Authorized employees
Snowmaking Systems “Snowmaking is an art.” Three Types of Snowmaking Systems:  Internal Mix  External Mix  Air/Water/Fan Air/water/fan snow gun Waterstick.
Elizabeth Wilmoth Period 2.  Identify problems that can occur if hardware is not properly maintained.  Identify routine maintenance that can be performed.
Green Building Demonstration Project Adam Saling City of San Diego.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Selling Fire Sentry Products in the Oil, Gas, and Petrochemical Markets.
Desuperheaters on Residential Air-Source Heat Pumps
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Practical Energy Conservation Tips for Steam Propulsion Ships.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
International Newspaper Group 2008 Gannett’s Green Campaign.
The Importance of Distribution. Manifold Position And Vapor Trail.
IMPROVING COOLING SYSTEM EFFICIENCY WITH PRE-COOLING AJ Schutte 15 August 2012.
PRESENTED BY: J.MIKE TYSON S.RAVIKUMAR S.SAKTHI M.SATHISHKUMAR.
Unit 2 -Gas And Diesel Power Plants
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Facilities Engineering *1 st draft By: Saha. Development options ProposalDevelopment OptionEstimated Cost (Mil) A FPSO converted to Tanker Hull 300 kbo.
By: Jack Quigley Caolán McCafferty Darren Gallagher Daniel Roddy 9.D.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
Facilities Management and Design Chapter 7 HVAC Systems.
NiSource Natural Gas STAR Workshop Introduction to Online Tools Presented by: Heather Wright ERG June 3, 2003 Merrillville, Indiana.
AP Environmental Science Net Energy & Energy Efficiency © Brooks/Cole Publishing Company / ITP.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Production Sector Workshop Introduction to Online Tools Presented by: Heather Wright ERG June 19, 2003 Natural Gas STAR Technology Transfer Workshop New.
Energy Conservation Building Upgrades Alma School District.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Technology & Curriculum Building & Grounds January 8, 2015.
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS
By:- Aliza Ibrahim RRIMT,Lko.. Low-temperature Solar Heat is Ideal for Many Industrial Processes. American Solar’s heating designs meet America’s largest.
Solar Water heating System information card
 II THE ADVANTAGES OF ELECTRICITY
Energy Savings Projects
Engineering Technology Division
Gas Power Plant - Layout and Operation
Eastern Pennsylvania Laboratory Facility
BASIC MECHANICAL ENGINEERING
Biobehavioral Health Building, University Park, PA
SoCalGas Energy Efficiency Incentive Programs,
Maintenance at ALBA facility: Strategy for the conventional services
HAZOP Guidewords Base Set
Proposed Replacement of 8800PPH Steam Boiler ( )
Chapter 13 Building Systems.
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Summer Projects Patrick Willoughby Maintenance Engineering

Project One: Equipment Manuals n Developed a set of manuals with drawings, parts lists and information for machinery n Equipment: Pumps, Compressors, etc.

Project Two: Plant Air Analysis n Did a redesign of the compressed air system n Read literature on how to perform a system audit n Developed a list of problems with the system and possible solutions

Compressed Air System Audit

Examples of Problems & Solutions n Compressor Control System n Current System: Old, inaccurate pneumatic system n Proposed System: Networked digital system with a controlling computer n Could provide payback in one year and savings of $100,000 or more per year afterwards n Add Useful Storage to System n Current System: Very little storage is present and it is useless n Proposed System: Several options are available including critical user storage or a load shaping system n Savings could be large, especially if a compressor could be shutdown

Vendors n Worked with vendors to get price quotes for new equipment n Developed a list of advantages and disadvantages for each equipment alternative Vendors included: Ingersoll-Rand Elliot Company Joy Turbocompressors ProTech Controls Compressor Controls Corporation

Project Three: Drawings Corrections n Updated drawings and equipment numbers for the following areas: –Fire Protection –Plant Air –Plant Water –Steam Plant n Specifically dealt with General Layout Drawings

Project Four: Bearing Isolators n Devices that are installed on boiler draft fans for protection from dust and particles in the air n Worked with Sales Representative to get bearing dimensions and price quotes

Project Five: Firewater Pump Rebuild n #4 Firewater Pump is in bad condition and requires repairs n Rebuild would involve various techniques to return pump to the original dimensions and tolerances n The company doing the rebuild specializes in a ceramic composite coating that lengthens the lifetime

Project Six: Fuel Oil Pump Replacement n The pumps that supply #2 Boilerhouse with fuel oil are obsolete n Project will replace two pairs of pumps with a new pair and redesign piping system with one supply line to the boilers