Presentation Deloitte Recommendations Objectives Agreed Changes Three-Block Recovery Approach Strategies Personal Drivers Projection Challenges Medium.

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
Mathieu Lucquiaud, Hannah Chalmers, Jon Gibbins
Technologies 1 CHP (VA Dallas Case Study). Proprietary Information Of Energy 2013 Dallas VA Medical Center A CHP Case Study Design Build Delivery of a.
Todays Topic: Operations The Manufacturing, Logistics and Service functions, and their relationships to technical jobs -or- if you cant produce and deliver.
NextGen Bus Coaches© for Asian Markets
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
3RD GLOBAL NETWORKING CONFRENCE ENERGY AND RECP CASE STUDY IN KAKIRA SUGAR IN UGANDA Presented By: Ludigo James Uganda Cleaner Production Centre
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Global Entrepreneurship and Small Business Management
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
VF Corporation Sourcing in the Americas August 22,
Feasibility Study Fuel Cane Power Generation Project for Barbados Agricultural Management Company, Ltd. Prepared by: Schaffer and Associates International,
The Australian Sugar Industry. Sucrogen – more than sugar We think so!
Belize Sugar: Planning for the Future
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
Activity Based Costing within a collaborative estimating framework Association of Cost Engineers 17 th February 2004 Grahame Jones, UK Manager, PRICE Systems.
Crestmark Bank “We help”…….. “Our primary purpose is to provide cash to businesses when it is not available from traditional banks. Our expert, experienced.
Hilton Maher Selto. 2 Product Costing Systems Concepts and Design Issues McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Beef Contracting: Why Are We Moving That Way, and How Far Will We Go Vern Pierce, Ph.D.
New Zealand’s International Trade Towards an integrated approach February 2011.
Supply Chain Management
Supply Chain Management AG BM 460. Introduction Hanover Foods – 95% of output is produced under contract Contract w/ store or industrial customer or food.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.
Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
“Business applications of E- commerce” Academic Year 2015.
THE SUGAR INDUSTRY AT A GLANCE
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
INTERNATIONAL BUSINESS TODAY Meeting the Needs and Challenges of.
GEF UNFCCC Asia & Pacific Regional Workshop on Transfer of Technology 17 January 2000, Cebu, Philippines Johan Wide, GEF Secretariat.
Source of Funds Roads Implementation Program –Tied Work –Preferred Supplier –Open Market External Market –LGA –Other Government Departments –Utilities.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Learning Goals Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact.
Introduction to Business Chapter 6: Sources of Finances.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
Value and Supply Chain Management. What is Logistics? The Institute of Logistics defines logistics as the management of the flow of goods, information.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Chapter 1 Characteristics of Business
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
Resource Efficiency Club. The Resource Efficiency Club and its Objectives National programme, promoted locally by SWRDA and Envirowise Implemented by:
Concepts in Enterprise Resource Planning Fourth Edition
A Case Study for using the Cooperative business model for Biomass Aggregation Randy Kyle, CPA, MBT Kyle Consulting Group, Inc. Office –
Supply Processes and Technology
Company Name Description of Plan Todays Date. 24/01/2016 Objectives Your target = £X per annum. Average order value £X– then you need to work out how.
ERP Components. Introduction ERP software is made up of many software components. Each component represents the major functional area of the organizations.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
MANAGING COMMODITY RISK. FACTORS THAT AFFECT COMMODITY PRICES Expected levels of inflation, particularly for precious metal Interest rates Exchange rates,
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
CONTENTS Background Target Market Approaches WFF Lending Model
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
TRANSACTION PROCESSING SYSTEM (TPS)
Across the entire value chain
Island Energy Advisory Committee Board
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
Chapter 2 Define the role of advertising within marketing
Transfer of Medical Devices Manufacturing Technology
SAFe Procurement Ian Hastings 2nd Oct 2017.
Presentation transcript:

Presentation Deloitte Recommendations Objectives Agreed Changes Three-Block Recovery Approach Strategies Personal Drivers Projection Challenges Medium Term Strategies

Deloitte Recommendations Proposal 1 – Cane Replanting Programme Detail Business Plan being prepared Indentify Low-yield Farms / Areas Involvement of Tribunal, SRIF, SPF, SCGC, CGF, FDB and FSC Revolving Fund Facility Advisory and Monitoring Proposal 2 - Cane Quality Payment System Deferred to 2012 Season Further review of NRI System Review of Core Sampling Lessons from ASR Trails and Working Systems

Deloitte Recommendations Proposal 3 – Single Extension Programme Hand-in-hand with Proposal 1 Proposal 4 – Aggregation of Small Farms Hand-in-hand with Proposal 1 Identification underway (Both yield and area) Proposal 5 & 6– FSC to Harvest and Deliver Cane Need for Legislative change Will be implemented in 2012

Objectives WITHIN TWO YEARS, RETURN THE CANE INDUSTRY TO LONG TERM COMMERCIAL VIABILITY WITHIN TWO YEARS RETURN FIJI SUGAR CORPORATION TO PROFITABILITY

Agreed Changes Delist FSC from SPSE Came into effect from 24 th February Government to Acquire 100% of FSC Delivery under FSC Control Target for 2012 Crushing Season Restructure of FSC Organization From Hierarchical to Matrix Structure Backward Integration

3-Block Approach A Increase in good quality cane yield B Highly efficient cane processing C Revenue from multiple products/multiple buyers

Block C Strategy Products Raw Sugar Molasses Ethanol Refined Sugar Electricity Multiple Customers Partnering Arrangement with Customers

Raw Sugar Pricing Existing Price (Partially Revised) Approx. US$0.22 cents per lb Negotiated Price for 2011/12 Season Fixed for 12 months. Better than present World Forward Price ($0.22/lb) Possible Pol premium

Tate & Lyle Partnering 10 Target Areas Full involvement in Preparing Mills for Crushing Season Preventive Maintenance / Continuous Improvement Comprehensive Inspection of Boilers Water Management Inspection, maintenance / replacement of Valves Cane feeders and Mill Setting Cane delivery logistics Cane planting support programme Mill management best practice / mentoring Improvement to Extension Services

EOI Ethanol Approximately 8 Companies Being reviewed Refinery and Packaging Approximately 5 Companies Being reviewed Electricity Generation Objective to meet FSC energy requirements AND additional revenue from Electricity sales Replace of FSC dedicated Energy Center - $80m Steam and Electricity facility - $130m Incremental Revenue - $35m per annum from Electricity

Steam & Electricity Partnering FEA Long term power purchase agreement Take-or-pay arrangement Wheeling Arrangement Vatukoula Gold Mines Ltd Off-take Agreement Contribution to Feasibility Study Financing Options FSC Product Exchange Agreement Financing Options

Block B Strategy Reliability and Production Consistency Very Targeted 2011 Maintenance Master Plan Not Doing Maintenance BUT Preparing the Mills for Crushing Reduce Crushing Rate to Manageable Levels Remove Destructive Competition Special Assistance from Tate & Lyle Technicians Losses and Wastage Better Milling to reduce Juice in Bagasse Re-cycle Spillage Production Cost Implement targeted Cost Effectiveness Value-driven Expenditure Partnering Stockholding with Equipment Suppliers

Block A Strategy Increase Quality Cane Production Helping Hand for New Growers Improve Quality Cane Yield Revolving Fund availability Premium Payment for Quality Cane Introduction of cane quality payment FSC Backward Integrate Acquire new and un-used Cane Plantation

Personal Drivers Commercial & Economic Viability Stand on our own 2 feet No Hand-out but Hand-up Succession Planning Allow Senior Managers to Step up Training Program through Hands-on Exchange Seamless Relationship Suppliers / Manufacturers / Customers

Projection – High Level Years Cane Crush1.778m2.100m Sugar Make131,000168,000 Molasses Make113,00084,000 TCTS Molasses %-age6.5%4.0% Revenue$135m$193m

Challenges Mindset Very Traditional and Institutional Sugar vs Cane Destructive Behaviour Ego-driven Outputs Stressing of machineries Money will Fix Everything Over $100m spent in the last 3 years Always Someone elses Fault Everyone is a Sugar Expert Lack of Good Competent People

Medium Term Strategy Ethanol Plant Ability to switch from Sugar (& Molasses) to Ethanol Sugar Refinery and Packaging Value-adding for Pacific Consumption Satellite Juicing Stations Localized Extraction of Juice Conversion to Syrup Briquetting of Bagasse

Thank You